- 24 Sept 2026 On the Residential Zoned Land Tax map
On the 2027 draft RZLT map
- 24 Sept 2026 RZLT-liable with no live permission for 10+ homes
RZLT-liable and no live permission for 10+ homes on it
- 24 Sept 2026 Built far below what the zoning allows
About 328 m² of buildings on 0.14 ha (plot ratio 0.24, 2 storeys max)
- 11 Sept 2026 Decision · 167 m
D26A/0563/WEB: GRANT PERMISSION — Widening of existing front vehicular access. Change of roof design from flat roo
- 1 Sept 2026 New application · 249 m
D26A/0653/WEB: application received — The development will consist of: 1) Demolition of existing rear conservatory; 2)
- 27 Jul 2026 New application · 167 m
D26A/0563/WEB: application received — Widening of existing front vehicular access. Change of roof design from flat roo
- 23 Mar 2026 Decision · 218 m
D26B/0059/WEB: GRANT PERMISSION — Permission sought for ground floor extension to front to extend living room and
- 2 Feb 2026 New application · 218 m
D26B/0059/WEB: application received — Permission sought for ground floor extension to front to extend living room and
- 20 Nov 2025 Sale recorded (PPR) · 227 m
€435,000 · APT 29, MARLAY VIEW, BALLINTEER AVE · second-hand
- 21 Aug 2025 Commencement notice · 131 m
Work commenced at 7 Heather Close, Dublin, D16 N276 under D25B/0184/WEB (1 dwelling unit)
- 9 Jul 2025 Sale recorded (PPR) · 197 m
€476,000 · 61 MARLAY VIEW, BALLINTEER AVE, DUBLIN 16 · second-hand
- 20 Jun 2025 Sale recorded (PPR) · 227 m
€546,000 · 39 MARLAY VIEW, BALLINTEER AVE, BALLINTEER DUBLIN 16 · second-hand
- 28 May 2025 Decision · 121 m
D25B/0184/WEB: GRANT PERMISSION — Planning permission is sought for attic conversion, raising of gable end to chan
- 10 Apr 2025 New application · 121 m
D25B/0184/WEB: application received — Planning permission is sought for attic conversion, raising of gable end to chan
- 7 Nov 2024 Sale recorded (PPR) · 94 m
€625,000 · 8 HEATHER PARK, MARLEY WOOD, RATHFARNHAM DUBLIN 16 · second-hand
- 14 Oct 2024 Commencement notice · 170 m
Work commenced at 14 Heather drive, Dublin, Dún Laoghaire-Rathdown, D16 E2X0 under D23B/0329 (1 dwelling unit)
- 24 Sept 2024 Sale recorded (PPR) · 227 m
€435,000 · 30 MARLAY VIEW, BALLINTEER AVE, BALLINTEER DUBLIN 16 · second-hand
- 8 Aug 2024 Commencement notice · 195 m
Work commenced at 7 Heather Drive, rathfarnham, Dún Laoghaire-Rathdown, D16 DD70 under D24B/0163
- 4 Jun 2024 Decision · 183 m
D24B/0163: GRANT PERMISSION — Replacement of the existing hipped roof with a gable roof to the side of the exi
- 10 May 2024 Commencement notice · 249 m
Work commenced at Pine Valley Avenue, Dublin, Dún Laoghaire-Rathdown, D16 TP99 under D23B/0015 (1 dwelling unit)
- 26 Apr 2024 Decision · 83 m
D24A/0129: GRANT OUTLINE PERMISSION — Outline Permission is sought for a 2-storey dwelling.
- 23 Apr 2024 Sale recorded (PPR) · 197 m
€429,000 · 55 MARLAY VIEW, BALLINTEER AVENUE, DUBLIN 16 · second-hand
- 12 Apr 2024 New application · 183 m
D24B/0163: application received — Replacement of the existing hipped roof with a gable roof to the side of the exi
- 5 Mar 2024 New application · 83 m
D24A/0129: application received — Outline Permission is sought for a 2-storey dwelling.
- 13 Feb 2024 Sale recorded (PPR) · 207 m
€527,500 · 15 HEATHER DR, RATHFARNHAM, DUBLIN 16 · second-hand
- 15 Nov 2023 Decision · 54 m
D23A/0418: GRANT PERMISSION — Planning permission for: Construction of a detached 2-storey, 3-bed house on lan
- 19 Oct 2023 Further information received · 54 m
D23A/0418: further information received — Planning permission for: Construction of a detached 2-storey, 3-bed house on lan
- 21 Aug 2023 Decision · 157 m
D23B/0329: GRANT PERMISSION — Permission is sought for construction of attic conversion,
- 10 Aug 2023 Further information requested · 54 m
D23A/0418: further information requested — Planning permission for: Construction of a detached 2-storey, 3-bed house on lan
- 11 Jul 2023 New application · 157 m
D23B/0329: application received — Permission is sought for construction of attic conversion,
Events from council registers, the Commission, BCMS, council meetings and the RZLT maps, each with its source link. Open clocks computed with statutory periods (s.34, s.37, s.50 PDA 2000, s.251 Christmas disregard) or as published.