Abbey Court Kilcoursey
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
0.36 ha · 10 homes · Zoned Existing Residential
Source: National planning applications map ↗ · Ref 21808More in Co. Offaly →
New signals on development sites across 5 councils, newest first. Each card says why it’s here and links to the source.
No new live signals here in this stretch. The ones that ended are below.
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
0.36 ha · 10 homes · Zoned Existing Residential
Source: National planning applications map ↗ · Ref 21808More in Co. Offaly →
0.74 ha · 18 homes · Zoned Existing Residential
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref 21174More in Co. Offaly →
Work started for 78 homes: a commencement notice was lodged, so the permission is in use.
4.17 ha · 78 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 20450More in Co. Offaly →
Work started for 32 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 32 homes · Zoned Town Centre
Source: National planning applications map ↗ · Ref 2360101More in Co. Carlow →
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
1.05 ha · 10 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 21246More in Co. Carlow →
Work started for 58 homes: a commencement notice was lodged, so the permission is in use.
3.45 ha · 58 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 2460120More in Co. Offaly →
Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court , and north of Bawnogue Park residential development (current
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
4.90 ha · 55 homes
Source: National planning applications map ↗ · Ref 2561306More in Co. Kildare →
Work started for 243 homes: a commencement notice was lodged, so the permission is in use.
0.38 ha · 243 homes · Zoned Existing Residential / Infill
Source: National planning applications map ↗ · Ref 2460055More in Co. Kildare →
Work started for 14 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 14 homes
Source: National planning applications map ↗ · Ref 24140More in Co. Kildare →
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
1.02 ha · 17 homes · Zoned General Development
Source: National planning applications map ↗ · Ref 23673More in Co. Kildare →
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
0.27 ha · 10 homes · Zoned Town Centre
Source: National planning applications map ↗ · Ref 235More in Co. Kildare →
Work started for 87 homes: a commencement notice was lodged, so the permission is in use.
3.60 ha · 87 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 211033More in Co. Kildare →
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.50 ha · 11 homes · Zoned Existing Residential / Infill
Source: National planning applications map ↗ · Ref 211643More in Co. Kildare →
Work started for 12 homes: a commencement notice was lodged, so the permission is in use.
780 m² · 12 homes
Source: National planning applications map ↗ · Ref 2360328More in Co. Kildare →
The Orchard , Oldtown Demesne , Sallins Road
Work started for 48 homes: a commencement notice was lodged, so the permission is in use.
0.14 ha · 48 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 2379More in Co. Kildare →
2.69 ha · 58 homes · Zoned New Residential
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref 19886More in Co. Kildare →
Work started for 37 homes: a commencement notice was lodged, so the permission is in use.
2.72 ha · 37 homes
Source: National planning applications map ↗ · Ref 2660381More in Co. Kildare →
Work started for 14 homes: a commencement notice was lodged, so the permission is in use.
0.69 ha · 14 homes
Source: National planning applications map ↗ · Ref 2560658More in Co. Kildare →
2.18 ha · 49 homes · Zoned Existing Residential / Infill
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref 181203More in Co. Kildare →
Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court and , north of Bawnogues Park residential development (curren
Work started for 95 homes: a commencement notice was lodged, so the permission is in use.
5.32 ha · 95 homes
Source: National planning applications map ↗ · Ref 2561347More in Co. Kildare →
Work started for 57 homes: a commencement notice was lodged, so the permission is in use.
2.13 ha · 57 homes
Source: National planning applications map ↗ · Ref 2460371More in Co. Kildare →
1.27 Ha site rear of 'Craughwell', 'Fairholme', & 'St. Benedict's'Brighton Rd, Foxrock, D18, access/egress & works to 'Craughwell' Brighton Rd, Foxrock D18, Harcourt Street tramline & Leopardstown Racecourse to south Brighton Wood, north by 'Goleen'
Work started for 37 homes: a commencement notice was lodged, so the permission is in use.
1.29 ha · 37 homes · Zoned A · To provide residential development and improve residential amenity…
Source: National planning applications map ↗ · Ref D21A/0051More in Dún Laoghaire-Rathdown →
0.82 ha · 154 homes · Zoned MRE · Metro and Rail Economic Corridor
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref F19A/0521More in Fingal →
Work started for 49 homes: a commencement notice was lodged, so the permission is in use.
0.33 ha · 49 homes · Zoned A · To provide residential development and improve residential amenity…
Source: National planning applications map ↗ · Ref LRD24A/0329More in Dún Laoghaire-Rathdown →
5.72 ha · 96 homes · Zoned RV · Rural Village
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref F20A/0303More in Fingal →
0.4939ha site at nos. 60 (Cois Cnoc), 61, 62 & 63 (Innisfree), Stepaside Lane, Stepaside, Dublin 18
0.50 ha · 29 homes · Zoned NC · To protect, provide for and-or improve mixed-use neighbourhood centre…
Source: National planning applications map ↗ · Ended 11 Oct 2026 · ref D18A/0971More in Dún Laoghaire-Rathdown →
The council's disposal notice has closed.
“Proposed lease of land at St. Catherine's Estate to Rush Athletic Football Club”
Zoned TC · Town and District Centre
The council's disposal notice has closed.
“Proposed disposal of land for the rectification of boundary at Rhencullen, Main Street, Lusk, Co. Dublin”
Zoned TC · Town and District Centre
The council's disposal notice has closed.
“Proposed disposal of land at Cappogue Industrial Estate, Ballycoolin Road, Dublin 15 to the National Transport Authority”
Zoned NSC · National Sports Campus
The council's disposal notice has closed.
“Proposed disposal of land at Church Fields, Mulhuddart, Dublin 15, County Dublin, to GEM Construction Limited”
Zoned RD · Road
Work started for 175 homes: a commencement notice was lodged, so the permission is in use.
1.88 ha · 175 homes · Zoned RS · Residential
Source: National planning applications map ↗ · Ref LRD0056/S3EMore in Fingal →
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Source: Fingal derelict sites register ↗ · Ref DS 17.12BMore in Fingal →
Unit D, North Dublin Corporate Park, Swords, Dublin, K67 W5P7
“commenced 12 Sep 2018, no completion certificate, planned end Nov 2018”
0.26 ha · 7–20 homes · Zoned MRE · Metro and Rail Economic Corridor
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0043581FLMore in Fingal →
Knockarlow South Shore Road, Rush, Dublin
“1 homes; commenced 05 Apr 2019, no completion certificate, planned end Nov 2019”
0.24 ha · 1 home · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050295FLMore in Fingal →
10C Ballycoolin Road, Dublin, Fingal
“commenced 10 Feb 2023, no completion certificate, planned end May 2023”
1.20 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0097570FLMore in Fingal →
20 New Street, Skerries, Dublin
“1 homes; commenced 20 Dec 2018, no completion certificate, planned end Dec 2019”
200 m² · 1 home · Zoned TC · Town and District Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046929FLMore in Fingal →
BALLYCOOLIN BUSINESS PARK, BALLYCOOLIN ROAD, Dublin, Dublin 15, D15 VNC4
“commenced 20 Nov 2018, no completion certificate, planned end Dec 2019”
5.62 ha · Zoned HT · High Technology
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046411FLMore in Fingal →
Rathmooney, Lusk, Fingal
“commenced 27 Sep 2022, no completion certificate, planned end Mar 2023”
2.54 ha · Zoned FP · Food Park
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0007672FLMore in Fingal →
Saint Margaret's Road, Harristown, Swords, Co Dublin, Dublin, K67 N6T7
“commenced 24 Feb 2020, no completion certificate, planned end May 2020”
3.67 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0061891FLMore in Fingal →
Frascati Road, Blackrock, Dublin, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 14 Aug 2023, no completion certificate, planned end Oct 2023”
0.15 ha · 4–12 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0008905DRMore in Dún Laoghaire-Rathdown →
92 Bracken Road, Dublin, Dún Laoghaire-Rathdown, D18 CY92
“commenced 24 Jul 2023, no completion certificate, planned end Sep 2023”
0.42 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0103526DRMore in Dún Laoghaire-Rathdown →
77 Furze Road, Dublin, Dún Laoghaire-Rathdown, D18 C3X5
“commenced 10 May 2022, no completion certificate, planned end Dec 2022”
0.70 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0089029DRMore in Dún Laoghaire-Rathdown →
“commenced 22 Mar 2023, no completion certificate, planned end May 2023”
0.47 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0098693DRMore in Dún Laoghaire-Rathdown →
3 Arkle Road, Dublin, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 06 Mar 2023, no completion certificate, planned end May 2023”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0098189DRMore in Dún Laoghaire-Rathdown →
Pottery Road, Dublin, Dún Laoghaire-Rathdown, A96 F2A8
“commenced 25 Jan 2021, no completion certificate, planned end Jul 2021”
6.58 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072077DRMore in Dún Laoghaire-Rathdown →
Belfield Office Park, Beech Hill Rd,, Roebuck, Dublin 4, 8Q68 WH
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
0.28 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046627DRMore in Dún Laoghaire-Rathdown →
MountainVIew, Central Park, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 26 Jul 2022, no completion certificate, planned end Sep 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0091942DRMore in Dún Laoghaire-Rathdown →
Ballymoss Road, Dublin, Dún Laoghaire-Rathdown, D18 Y2C9
“commenced 08 Mar 2022, no completion certificate, planned end Jun 2022”
0.38 ha · 10–30 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0007004DRMore in Dún Laoghaire-Rathdown →
“commenced 17 Dec 2021, no completion certificate, planned end Mar 2022”
Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084438DRMore in Dún Laoghaire-Rathdown →
St. Patricks Boys' National School, Newgrange Rd, Blackrock, Dublin, Dublin, A94 FE02
“commenced 18 Jun 2020, no completion certificate, planned end Aug 2020”
2.68 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0065146DRMore in Dún Laoghaire-Rathdown →
Hexagon Building, IDA Blanchardstown Business and Technology Park, Snugborough Road, Dublin, Fingal, D15 V978
“commenced 09 Jul 2021, no completion certificate, planned end Jan 2022”
Zoned HT · High Technology
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0078742FLMore in Fingal →
4 Dundrum Road, Dublin, Dún Laoghaire-Rathdown, D14 VX61
“commenced 15 Feb 2022, no completion certificate, planned end May 2022”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0086031DRMore in Dún Laoghaire-Rathdown →
CHERRYWOOD BUSINESS PARK, Dublin, South Dublin, D18 T3Y1
“commenced 26 Aug 2021, no completion certificate, planned end Dec 2021”
0.43 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080525DRMore in Dún Laoghaire-Rathdown →
Dun Laoghaire Industrial Estate, Pottery Rd, Dun Laoghaire, Co Dublin, Dublin, Dún Laoghaire-Rathdown, A96 KW29
“commenced 23 Aug 2020, no completion certificate, planned end Jan 2021”
1.33 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067352DRMore in Dún Laoghaire-Rathdown →
1 Pottery Road, Dublin, Monaghan, D18 X2H4
“commenced 11 Jan 2019, no completion certificate, planned end May 2019”
0.34 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0003854DRMore in Dún Laoghaire-Rathdown →
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2022”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0074061DRMore in Dún Laoghaire-Rathdown →
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 26 Jan 2021, no completion certificate, planned end Jul 2021”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072214DRMore in Dún Laoghaire-Rathdown →
Hertz - Swords Business Park, Swords, Dublin, K67 X903
“commenced 23 Nov 2018, no completion certificate, planned end Jan 2019”
Zoned MRE · Metro and Rail Economic Corridor
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046149FLMore in Fingal →
“commenced 10 Aug 2020, no completion certificate, planned end Dec 2020”
1.96 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067040DRMore in Dún Laoghaire-Rathdown →
Building 11, Cherrywood Business Park, Dublin, Dún Laoghaire-Rathdown, D18 DH50
“commenced 02 Dec 2020, no completion certificate, planned end May 2021”
0.51 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0071024DRMore in Dún Laoghaire-Rathdown →
7 ST. HELEN'S VILLAS, ROCK ROAD, BOOTERSTOWN, CO. DUBLIN, Dublin, A94 H3F9
“1 homes; commenced 13 Sep 2018, no completion certificate, planned end Mar 2019”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0043503DRMore in Dún Laoghaire-Rathdown →
Blackthorn Road,, Dublin, D18 F5X2
“commenced 07 Aug 2019, no completion certificate, planned end Dec 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0055359DRMore in Dún Laoghaire-Rathdown →
Mountain View, Central Park, Dublin, D18 XN97
“commenced 01 May 2019, no completion certificate, planned end Jul 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0051263DRMore in Dún Laoghaire-Rathdown →
BLACKTHORN ROAD, Dublin 18,SANDYFORD INDUSTRIAL ESTATE, D18 F5X2
“commenced 10 Apr 2019, no completion certificate, planned end Jul 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050602DRMore in Dún Laoghaire-Rathdown →
Barnhill Road, Dublin
“1 homes; commenced 03 Apr 2019, no completion certificate, planned end Oct 2019”
0.20 ha · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050152DRMore in Dún Laoghaire-Rathdown →
Cherrywood Park, Dublin, D18 DH50
“commenced 18 Mar 2019, no completion certificate, planned end Jun 2019”
0.51 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0049526DRMore in Dún Laoghaire-Rathdown →
South County Business Park, Leopardstown, Dublin, Dublin, D18 DH6K
“commenced 23 Nov 2018, no completion certificate, planned end Dec 2019”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046189DRMore in Dún Laoghaire-Rathdown →
Ardagh Drive, Dublin, A94 EW97
“1 homes; commenced 19 Nov 2018, no completion certificate, planned end May 2019”
580 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045825DRMore in Dún Laoghaire-Rathdown →
Mountain View, Central Park, Dublin, D18XN97
“commenced 18 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0040100DRMore in Dún Laoghaire-Rathdown →
Diswellstown, Castleknock, Dublin 15
“12 homes; commenced 25 Sep 2017, no completion certificate, planned end Jul 2018”
1.31 ha · 12 homes · Zoned HA · High Amenity
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0031943FLMore in Fingal →
“commenced 25 Nov 2019, no completion certificate, planned end Jan 2020”
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0059324FLMore in Fingal →
Clonsilla Road, Clonsilla, Dublin 15
“33 homes; commenced 23 Mar 2017, no completion certificate, planned end Jul 2017”
1.04 ha · 33 homes · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0025376FLMore in Fingal →
claremount, Coolquoy Common, Fingal
“commenced 23 Jul 2020, no completion certificate, planned end Sep 2020”
1.00 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005401FLMore in Fingal →
“455 homes; commenced 24 Jul 2015, no completion certificate, planned end Jul 2016”
28.5 ha · 455 homes · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0008962FLMore in Fingal →
Corner of Carmanhal Road & Blackthorn Road, Dublin, NA
“commenced 24 Jul 2018, no completion certificate, planned end Sep 2018”
0.85 ha · 23–67 homes · Zoned A2 · To provide for the creation of sustainable residential neighbourhoods…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0041839DRMore in Dún Laoghaire-Rathdown →
North Hill, Rush
“commenced 13 Apr 2020, no completion certificate, planned end May 2020”
2.26 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0063618FLMore in Fingal →
“1 homes; commenced 08 Nov 2018, no completion certificate, planned end Nov 2019”
0.19 ha · 1 home · Zoned HA · High Amenity
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045848FLMore in Fingal →
Malahide Road, Swords, Fingal, K67 YY15
“commenced 28 Feb 2022, no completion certificate, planned end Apr 2022”
6.83 ha · 191–546 homes · Zoned MC · Major Town Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0086510FLMore in Fingal →
Unit D8, Horizon Logistics Park, Harristown, Swords, Co Dublin, Co Dublin, Fingal, K67 F5X6
“commenced 04 Jan 2022, no completion certificate, planned end Apr 2022”
3.39 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084622FLMore in Fingal →
Arkle Road, Dublin, D18 Y3X2
“commenced 25 Apr 2018, no completion certificate, planned end Oct 2018”
0.41 ha · 11–32 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037870DRMore in Dún Laoghaire-Rathdown →
“commenced 09 Jun 2022, no completion certificate, planned end Jul 2022”
Zoned MC · Major Town Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090299FLMore in Fingal →
Block H, Central Park, Leopardstown, D18 CK74
“commenced 09 Nov 2018, no completion certificate, planned end Feb 2019”
0.54 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045842DRMore in Dún Laoghaire-Rathdown →
Brook Lane, Rush, Fingal
“commenced 28 Sep 2021, no completion certificate, planned end Sep 2022”
2.26 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0081993FLMore in Fingal →
Corduff, Lusk, Fingal
“commenced 15 Sep 2022, no completion certificate, planned end Dec 2022”
3.09 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0093649FLMore in Fingal →
Blackthorn Road, Dublin, D18 KX32
“commenced 12 Apr 2018, no completion certificate, planned end Sep 2018”
80 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037498DRMore in Dún Laoghaire-Rathdown →
Unit 8, Skerries Point Shopping Center, Kelly's Bay Parade, Skerries, Dublin, County Dublin
“commenced 02 Mar 2020, no completion certificate, planned end Jun 2020”
1.07 ha · 30–85 homes · Zoned LC · Local Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0062291FLMore in Fingal →
South Country Business Park, Dublin, D18 X5K7
“commenced 28 Apr 2018, no completion certificate, planned end Jul 2018”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0038120DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 13 Aug 2018, no completion certificate, planned end Nov 2018”
0 m² · 1 home · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0042813FLMore in Fingal →
4 Damastown Close, Dublin, Fingal
“commenced 20 Jul 2022, no completion certificate, planned end Jul 2023”
1.06 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0091722FLMore in Fingal →
Saint Margaret's Park, Dublin 11, Fingal
“commenced 08 Mar 2021, no completion certificate, planned end Jul 2022”
4.88 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072990FLMore in Fingal →
Bracken Road, Dublin, D18 K2N9
“commenced 20 Oct 2018, no completion certificate, planned end Mar 2019”
0.35 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0044933DRMore in Dún Laoghaire-Rathdown →
Blanchardstown Road North, Blanchardstown, Dublin
“1 homes; commenced 28 Jan 2022, no completion certificate, planned end Jan 2023”
0.78 ha · 1 home · Zoned CI · Community Infrastructure
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0085539FLMore in Fingal →
27 Northwood Avenue, Northwood, Dublin
“12 homes; commenced 12 Mar 2020, no completion certificate, planned end Jun 2021”
0.39 ha · 12 homes · Zoned MRE · Metro and Rail Economic Corridor
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005182FLMore in Fingal →
R132, Lusk, Dublin
“commenced 17 Dec 2018, no completion certificate, planned end Jul 2019”
3.89 ha · Zoned RB · Rural Business
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046728FLMore in Fingal →
Saint Margaret's Road, Dublin 11, Fingal
“commenced 01 Feb 2021, no completion certificate, planned end Jun 2022”
4.88 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072211FLMore in Fingal →
Unit 633 Northwest Logistics Park, Kilshane Avenue, Northwest Business Park, Dublin, Fingal, D15 NXP6
“commenced 16 Jun 2022, no completion certificate, planned end Oct 2022”
0.91 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090578FLMore in Fingal →
Sussex Street, Dublin, Dún Laoghaire-Rathdown, A96 C786
“10 homes; commenced 22 May 2023, no completion certificate, planned end Jun 2023”
520 m² · 10 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0100833DRMore in Dún Laoghaire-Rathdown →
Sandyford Road, Dundrum Town Centre, Dún Laoghaire-Rathdown
“commenced 20 Dec 2022, no completion certificate, planned end Dec 2022”
0.49 ha · 13–39 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0096473DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 07 Jun 2022, no completion certificate, planned end Sep 2022”
630 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090091DRMore in Dún Laoghaire-Rathdown →
RSA House, Sandyford Rd, Dublin, Dún Laoghaire-Rathdown, D16 FC92
“commenced 02 Dec 2021, no completion certificate, planned end Feb 2022”
3.13 ha · 87–249 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084043DRMore in Dún Laoghaire-Rathdown →
Murphystown Way, Dublin 18, Dún Laoghaire-Rathdown, N/A
“commenced 16 Sep 2021, no completion certificate, planned end Feb 2022”
2.54 ha · 71–203 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0081586DRMore in Dún Laoghaire-Rathdown →
Dublin, Dún Laoghaire-Rathdown, A94 H9T8
“commenced 25 Jun 2021, no completion certificate, planned end Feb 2023”
4.56 ha · 127–365 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0078068DRMore in Dún Laoghaire-Rathdown →
Ballyogan Road, Leopardstown, Dublin 18
“commenced 19 May 2020, no completion certificate, planned end Aug 2020”
2.94 ha · 82–235 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005295DRMore in Dún Laoghaire-Rathdown →
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076159DRMore in Dún Laoghaire-Rathdown →
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076139DRMore in Dún Laoghaire-Rathdown →
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 May 2021, no completion certificate, planned end Aug 2021”
25.7 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076125DRMore in Dún Laoghaire-Rathdown →
Dublin, D18 TF72
“commenced 16 Jan 2019, no completion certificate, planned end Mar 2019”
0.65 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0047373DRMore in Dún Laoghaire-Rathdown →
Tully Development Area 8, Barrington Road, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 14 Apr 2021, no completion certificate, planned end Oct 2021”
9.68 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0074085DRMore in Dún Laoghaire-Rathdown →
Rock Hill, Dublin, A94 W3F2
“commenced 15 Jul 2019, no completion certificate, planned end Oct 2019”
0.14 ha · 3–10 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0054206DRMore in Dún Laoghaire-Rathdown →
Frascati Road, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.31 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066825DRMore in Dún Laoghaire-Rathdown →
5 Leopardstown Rd, Dublin, Dún Laoghaire-Rathdown, D18 XN80
“commenced 19 Oct 2020, no completion certificate, planned end Aug 2021”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0069446DRMore in Dún Laoghaire-Rathdown →
“commenced 26 Mar 2020, no completion certificate, planned end Jan 2021”
4.28 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0063175DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 17 Dec 2019, no completion certificate, planned end Jul 2020”
640 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0060272DRMore in Dún Laoghaire-Rathdown →
28 Merville Avenue, Stillorgan, Dún Laoghaire-Rathdown, A94DK28
“1 homes; commenced 01 Feb 2021, no completion certificate, planned end May 2021”
520 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072104DRMore in Dún Laoghaire-Rathdown →
18 Cherrywood, Loughlinstown
“commenced 15 Jul 2019, no completion certificate, planned end Aug 2019”
2.58 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0054567DRMore in Dún Laoghaire-Rathdown →
Cherrywood Business Park, Building 4, Dublin, D18 K7W4
“commenced 26 Feb 2019, no completion certificate, planned end Apr 2019”
0.46 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048808DRMore in Dún Laoghaire-Rathdown →
104 R116, Dublin, A96 T8X0
“0 homes; commenced 12 Nov 2018, no completion certificate, planned end Jan 2019”
440 m² · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045592DRMore in Dún Laoghaire-Rathdown →
Honeypark, Glenageary Road Upper & Kill Avenue, Dún Laoghaire
“197 homes; commenced 11 Aug 2015, no completion certificate, planned end Aug 2016”
410 m² · 197 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0009466DRMore in Dún Laoghaire-Rathdown →
Orwell Road, Dublin, Dún Laoghaire-Rathdown, D14 RX00
“1 homes; commenced 25 Aug 2022, no completion certificate, planned end Nov 2022”
480 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0092932DRMore in Dún Laoghaire-Rathdown →
Building 5, IBM Technology Campus, Dublin, Fingal, D15 HN66
“commenced 11 Jun 2021, no completion certificate, planned end Aug 2021”
Zoned HT · High Technology
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0077251FLMore in Fingal →