Ballinalea
Permission for 99 homes expired 13 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
3.92 ha · 99 homes
Source: National planning applications map ↗ · Ref SH202101More in Co. Wicklow →
New signals on development sites across 7 councils, newest first. Each card says why it’s here and links to the source.
Permission for 99 homes expired 13 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
3.92 ha · 99 homes
Source: National planning applications map ↗ · Ref SH202101More in Co. Wicklow →
On Wicklow County Council's derelict sites register (ref DS/172).
A 7% yearly charge presses the owner to sell or build.
420 m² · Zoned Town Centre
Source: Wicklow derelict sites register ↗More in Co. Wicklow →
On Wicklow County Council's derelict sites register (ref DS/171).
60 m² · Zoned Town Centre
Source: Wicklow derelict sites register ↗More in Co. Wicklow →
On Wicklow County Council's derelict sites register (ref DS164).
740 m² · Zoned Employment
Source: Wicklow derelict sites register ↗More in Co. Wicklow →
On Wicklow County Council's derelict sites register (ref DS113).
670 m² · Zoned Town Centre
Source: Wicklow derelict sites register ↗More in Co. Wicklow →
Granted 30 Sept 2026 for 50 homes. No commencement notice yet; the permission runs to 30 Sept 2031.
Permitted but idle: the owner may want a builder or a buyer.
3.72 ha · 50 homes · Zoned Proposed Residential
Source: National planning applications map ↗ · Ref 2560563More in Co. Westmeath →
Granted 30 Sept 2026 for 97 homes. No commencement notice yet; the permission runs to 30 Sept 2031.
0.14 ha · 97 homes · Zoned A2 · New Residential
Source: National planning applications map ↗ · Ref 2660662More in Co. Meath →
Granted 30 Sept 2026 for 13 homes. No commencement notice yet; the permission runs to 6 Sept 2028.
0.29 ha · 13 homes · Zoned D1 · Tourism
Source: National planning applications map ↗ · Ref 2660814More in Co. Meath →
The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Granted 28 Sept 2026 for 14 homes. No commencement notice yet; the permission runs to 27 Sept 2031.
0.24 ha · 14 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 2660617More in Co. Wicklow →
1.27 Ha site rear of 'Craughwell', 'Fairholme', & 'St. Benedict's'Brighton Rd, Foxrock, D18, access/egress & works to 'Craughwell' Brighton Rd, Foxrock D18, Harcourt Street tramline & Leopardstown Racecourse to south Brighton Wood, north by 'Goleen'
Work started for 37 homes: a commencement notice was lodged, so the permission is in use.
1.29 ha · 37 homes · Zoned A · To provide residential development and improve residential amenity…
Source: National planning applications map ↗ · Ref D21A/0051More in Dún Laoghaire-Rathdown →
0.82 ha · 154 homes · Zoned MRE · Metro and Rail Economic Corridor
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref F19A/0521More in Fingal →
Work started for 49 homes: a commencement notice was lodged, so the permission is in use.
0.33 ha · 49 homes · Zoned A · To provide residential development and improve residential amenity…
Source: National planning applications map ↗ · Ref LRD24A/0329More in Dún Laoghaire-Rathdown →
5.72 ha · 96 homes · Zoned RV · Rural Village
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref F20A/0303More in Fingal →
2.85 ha · 12 homes · Zoned Secondary Development Area
Source: National planning applications map ↗ · Ended 14 Oct 2026 · ref 19344More in Co. Wicklow →
0.4939ha site at nos. 60 (Cois Cnoc), 61, 62 & 63 (Innisfree), Stepaside Lane, Stepaside, Dublin 18
0.50 ha · 29 homes · Zoned NC · To protect, provide for and-or improve mixed-use neighbourhood centre…
Source: National planning applications map ↗ · Ended 11 Oct 2026 · ref D18A/0971More in Dún Laoghaire-Rathdown →
The council's disposal notice has closed.
“Proposed lease of land at St. Catherine's Estate to Rush Athletic Football Club”
Zoned TC · Town and District Centre
The council's disposal notice has closed.
“Proposed disposal of land for the rectification of boundary at Rhencullen, Main Street, Lusk, Co. Dublin”
Zoned TC · Town and District Centre
The council's disposal notice has closed.
“Proposed disposal of land at Cappogue Industrial Estate, Ballycoolin Road, Dublin 15 to the National Transport Authority”
Zoned NSC · National Sports Campus
The council's disposal notice has closed.
“Proposed disposal of land at Church Fields, Mulhuddart, Dublin 15, County Dublin, to GEM Construction Limited”
Zoned RD · Road
Work started for 175 homes: a commencement notice was lodged, so the permission is in use.
1.88 ha · 175 homes · Zoned RS · Residential
Source: National planning applications map ↗ · Ref LRD0056/S3EMore in Fingal →
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Source: Fingal derelict sites register ↗ · Ref DS 17.12BMore in Fingal →
Unit D, North Dublin Corporate Park, Swords, Dublin, K67 W5P7
“commenced 12 Sep 2018, no completion certificate, planned end Nov 2018”
0.26 ha · 7–20 homes · Zoned MRE · Metro and Rail Economic Corridor
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0043581FLMore in Fingal →
Knockarlow South Shore Road, Rush, Dublin
“1 homes; commenced 05 Apr 2019, no completion certificate, planned end Nov 2019”
0.24 ha · 1 home · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050295FLMore in Fingal →
10C Ballycoolin Road, Dublin, Fingal
“commenced 10 Feb 2023, no completion certificate, planned end May 2023”
1.20 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0097570FLMore in Fingal →
20 New Street, Skerries, Dublin
“1 homes; commenced 20 Dec 2018, no completion certificate, planned end Dec 2019”
200 m² · 1 home · Zoned TC · Town and District Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046929FLMore in Fingal →
BALLYCOOLIN BUSINESS PARK, BALLYCOOLIN ROAD, Dublin, Dublin 15, D15 VNC4
“commenced 20 Nov 2018, no completion certificate, planned end Dec 2019”
5.62 ha · Zoned HT · High Technology
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046411FLMore in Fingal →
Rathmooney, Lusk, Fingal
“commenced 27 Sep 2022, no completion certificate, planned end Mar 2023”
2.54 ha · Zoned FP · Food Park
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0007672FLMore in Fingal →
Saint Margaret's Road, Harristown, Swords, Co Dublin, Dublin, K67 N6T7
“commenced 24 Feb 2020, no completion certificate, planned end May 2020”
3.67 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0061891FLMore in Fingal →
Frascati Road, Blackrock, Dublin, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 14 Aug 2023, no completion certificate, planned end Oct 2023”
0.15 ha · 4–12 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0008905DRMore in Dún Laoghaire-Rathdown →
92 Bracken Road, Dublin, Dún Laoghaire-Rathdown, D18 CY92
“commenced 24 Jul 2023, no completion certificate, planned end Sep 2023”
0.42 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0103526DRMore in Dún Laoghaire-Rathdown →
77 Furze Road, Dublin, Dún Laoghaire-Rathdown, D18 C3X5
“commenced 10 May 2022, no completion certificate, planned end Dec 2022”
0.70 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0089029DRMore in Dún Laoghaire-Rathdown →
“commenced 22 Mar 2023, no completion certificate, planned end May 2023”
0.47 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0098693DRMore in Dún Laoghaire-Rathdown →
3 Arkle Road, Dublin, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 06 Mar 2023, no completion certificate, planned end May 2023”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0098189DRMore in Dún Laoghaire-Rathdown →
Pottery Road, Dublin, Dún Laoghaire-Rathdown, A96 F2A8
“commenced 25 Jan 2021, no completion certificate, planned end Jul 2021”
6.58 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072077DRMore in Dún Laoghaire-Rathdown →
Belfield Office Park, Beech Hill Rd,, Roebuck, Dublin 4, 8Q68 WH
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
0.28 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046627DRMore in Dún Laoghaire-Rathdown →
MountainVIew, Central Park, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 26 Jul 2022, no completion certificate, planned end Sep 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0091942DRMore in Dún Laoghaire-Rathdown →
Ballymoss Road, Dublin, Dún Laoghaire-Rathdown, D18 Y2C9
“commenced 08 Mar 2022, no completion certificate, planned end Jun 2022”
0.38 ha · 10–30 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0007004DRMore in Dún Laoghaire-Rathdown →
“commenced 17 Dec 2021, no completion certificate, planned end Mar 2022”
Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084438DRMore in Dún Laoghaire-Rathdown →
St. Patricks Boys' National School, Newgrange Rd, Blackrock, Dublin, Dublin, A94 FE02
“commenced 18 Jun 2020, no completion certificate, planned end Aug 2020”
2.68 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0065146DRMore in Dún Laoghaire-Rathdown →
Hexagon Building, IDA Blanchardstown Business and Technology Park, Snugborough Road, Dublin, Fingal, D15 V978
“commenced 09 Jul 2021, no completion certificate, planned end Jan 2022”
Zoned HT · High Technology
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0078742FLMore in Fingal →
4 Dundrum Road, Dublin, Dún Laoghaire-Rathdown, D14 VX61
“commenced 15 Feb 2022, no completion certificate, planned end May 2022”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0086031DRMore in Dún Laoghaire-Rathdown →
CHERRYWOOD BUSINESS PARK, Dublin, South Dublin, D18 T3Y1
“commenced 26 Aug 2021, no completion certificate, planned end Dec 2021”
0.43 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080525DRMore in Dún Laoghaire-Rathdown →
Dun Laoghaire Industrial Estate, Pottery Rd, Dun Laoghaire, Co Dublin, Dublin, Dún Laoghaire-Rathdown, A96 KW29
“commenced 23 Aug 2020, no completion certificate, planned end Jan 2021”
1.33 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067352DRMore in Dún Laoghaire-Rathdown →
1 Pottery Road, Dublin, Monaghan, D18 X2H4
“commenced 11 Jan 2019, no completion certificate, planned end May 2019”
0.34 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0003854DRMore in Dún Laoghaire-Rathdown →
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2022”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0074061DRMore in Dún Laoghaire-Rathdown →
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 26 Jan 2021, no completion certificate, planned end Jul 2021”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072214DRMore in Dún Laoghaire-Rathdown →
Hertz - Swords Business Park, Swords, Dublin, K67 X903
“commenced 23 Nov 2018, no completion certificate, planned end Jan 2019”
Zoned MRE · Metro and Rail Economic Corridor
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046149FLMore in Fingal →
“commenced 10 Aug 2020, no completion certificate, planned end Dec 2020”
1.96 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067040DRMore in Dún Laoghaire-Rathdown →
Building 11, Cherrywood Business Park, Dublin, Dún Laoghaire-Rathdown, D18 DH50
“commenced 02 Dec 2020, no completion certificate, planned end May 2021”
0.51 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0071024DRMore in Dún Laoghaire-Rathdown →
7 ST. HELEN'S VILLAS, ROCK ROAD, BOOTERSTOWN, CO. DUBLIN, Dublin, A94 H3F9
“1 homes; commenced 13 Sep 2018, no completion certificate, planned end Mar 2019”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0043503DRMore in Dún Laoghaire-Rathdown →
Blackthorn Road,, Dublin, D18 F5X2
“commenced 07 Aug 2019, no completion certificate, planned end Dec 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0055359DRMore in Dún Laoghaire-Rathdown →
Mountain View, Central Park, Dublin, D18 XN97
“commenced 01 May 2019, no completion certificate, planned end Jul 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0051263DRMore in Dún Laoghaire-Rathdown →
BLACKTHORN ROAD, Dublin 18,SANDYFORD INDUSTRIAL ESTATE, D18 F5X2
“commenced 10 Apr 2019, no completion certificate, planned end Jul 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050602DRMore in Dún Laoghaire-Rathdown →
Barnhill Road, Dublin
“1 homes; commenced 03 Apr 2019, no completion certificate, planned end Oct 2019”
0.20 ha · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050152DRMore in Dún Laoghaire-Rathdown →
Cherrywood Park, Dublin, D18 DH50
“commenced 18 Mar 2019, no completion certificate, planned end Jun 2019”
0.51 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0049526DRMore in Dún Laoghaire-Rathdown →
South County Business Park, Leopardstown, Dublin, Dublin, D18 DH6K
“commenced 23 Nov 2018, no completion certificate, planned end Dec 2019”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046189DRMore in Dún Laoghaire-Rathdown →
Ardagh Drive, Dublin, A94 EW97
“1 homes; commenced 19 Nov 2018, no completion certificate, planned end May 2019”
580 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045825DRMore in Dún Laoghaire-Rathdown →
Mountain View, Central Park, Dublin, D18XN97
“commenced 18 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0040100DRMore in Dún Laoghaire-Rathdown →
Diswellstown, Castleknock, Dublin 15
“12 homes; commenced 25 Sep 2017, no completion certificate, planned end Jul 2018”
1.31 ha · 12 homes · Zoned HA · High Amenity
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0031943FLMore in Fingal →
“commenced 25 Nov 2019, no completion certificate, planned end Jan 2020”
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0059324FLMore in Fingal →
Clonsilla Road, Clonsilla, Dublin 15
“33 homes; commenced 23 Mar 2017, no completion certificate, planned end Jul 2017”
1.04 ha · 33 homes · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0025376FLMore in Fingal →
claremount, Coolquoy Common, Fingal
“commenced 23 Jul 2020, no completion certificate, planned end Sep 2020”
1.00 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005401FLMore in Fingal →
“455 homes; commenced 24 Jul 2015, no completion certificate, planned end Jul 2016”
28.5 ha · 455 homes · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0008962FLMore in Fingal →
Corner of Carmanhal Road & Blackthorn Road, Dublin, NA
“commenced 24 Jul 2018, no completion certificate, planned end Sep 2018”
0.85 ha · 23–67 homes · Zoned A2 · To provide for the creation of sustainable residential neighbourhoods…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0041839DRMore in Dún Laoghaire-Rathdown →
North Hill, Rush
“commenced 13 Apr 2020, no completion certificate, planned end May 2020”
2.26 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0063618FLMore in Fingal →
“1 homes; commenced 08 Nov 2018, no completion certificate, planned end Nov 2019”
0.19 ha · 1 home · Zoned HA · High Amenity
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045848FLMore in Fingal →
Malahide Road, Swords, Fingal, K67 YY15
“commenced 28 Feb 2022, no completion certificate, planned end Apr 2022”
6.83 ha · 191–546 homes · Zoned MC · Major Town Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0086510FLMore in Fingal →
Unit D8, Horizon Logistics Park, Harristown, Swords, Co Dublin, Co Dublin, Fingal, K67 F5X6
“commenced 04 Jan 2022, no completion certificate, planned end Apr 2022”
3.39 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084622FLMore in Fingal →
Arkle Road, Dublin, D18 Y3X2
“commenced 25 Apr 2018, no completion certificate, planned end Oct 2018”
0.41 ha · 11–32 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037870DRMore in Dún Laoghaire-Rathdown →
“commenced 09 Jun 2022, no completion certificate, planned end Jul 2022”
Zoned MC · Major Town Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090299FLMore in Fingal →
Block H, Central Park, Leopardstown, D18 CK74
“commenced 09 Nov 2018, no completion certificate, planned end Feb 2019”
0.54 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045842DRMore in Dún Laoghaire-Rathdown →
Brook Lane, Rush, Fingal
“commenced 28 Sep 2021, no completion certificate, planned end Sep 2022”
2.26 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0081993FLMore in Fingal →
Corduff, Lusk, Fingal
“commenced 15 Sep 2022, no completion certificate, planned end Dec 2022”
3.09 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0093649FLMore in Fingal →
Blackthorn Road, Dublin, D18 KX32
“commenced 12 Apr 2018, no completion certificate, planned end Sep 2018”
80 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037498DRMore in Dún Laoghaire-Rathdown →
Unit 8, Skerries Point Shopping Center, Kelly's Bay Parade, Skerries, Dublin, County Dublin
“commenced 02 Mar 2020, no completion certificate, planned end Jun 2020”
1.07 ha · 30–85 homes · Zoned LC · Local Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0062291FLMore in Fingal →
South Country Business Park, Dublin, D18 X5K7
“commenced 28 Apr 2018, no completion certificate, planned end Jul 2018”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0038120DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 13 Aug 2018, no completion certificate, planned end Nov 2018”
0 m² · 1 home · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0042813FLMore in Fingal →
4 Damastown Close, Dublin, Fingal
“commenced 20 Jul 2022, no completion certificate, planned end Jul 2023”
1.06 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0091722FLMore in Fingal →
Saint Margaret's Park, Dublin 11, Fingal
“commenced 08 Mar 2021, no completion certificate, planned end Jul 2022”
4.88 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072990FLMore in Fingal →
Bracken Road, Dublin, D18 K2N9
“commenced 20 Oct 2018, no completion certificate, planned end Mar 2019”
0.35 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0044933DRMore in Dún Laoghaire-Rathdown →
Blanchardstown Road North, Blanchardstown, Dublin
“1 homes; commenced 28 Jan 2022, no completion certificate, planned end Jan 2023”
0.78 ha · 1 home · Zoned CI · Community Infrastructure
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0085539FLMore in Fingal →
27 Northwood Avenue, Northwood, Dublin
“12 homes; commenced 12 Mar 2020, no completion certificate, planned end Jun 2021”
0.39 ha · 12 homes · Zoned MRE · Metro and Rail Economic Corridor
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005182FLMore in Fingal →
R132, Lusk, Dublin
“commenced 17 Dec 2018, no completion certificate, planned end Jul 2019”
3.89 ha · Zoned RB · Rural Business
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046728FLMore in Fingal →
Saint Margaret's Road, Dublin 11, Fingal
“commenced 01 Feb 2021, no completion certificate, planned end Jun 2022”
4.88 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072211FLMore in Fingal →
Unit 633 Northwest Logistics Park, Kilshane Avenue, Northwest Business Park, Dublin, Fingal, D15 NXP6
“commenced 16 Jun 2022, no completion certificate, planned end Oct 2022”
0.91 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090578FLMore in Fingal →
Sussex Street, Dublin, Dún Laoghaire-Rathdown, A96 C786
“10 homes; commenced 22 May 2023, no completion certificate, planned end Jun 2023”
520 m² · 10 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0100833DRMore in Dún Laoghaire-Rathdown →
Sandyford Road, Dundrum Town Centre, Dún Laoghaire-Rathdown
“commenced 20 Dec 2022, no completion certificate, planned end Dec 2022”
0.49 ha · 13–39 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0096473DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 07 Jun 2022, no completion certificate, planned end Sep 2022”
630 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090091DRMore in Dún Laoghaire-Rathdown →
RSA House, Sandyford Rd, Dublin, Dún Laoghaire-Rathdown, D16 FC92
“commenced 02 Dec 2021, no completion certificate, planned end Feb 2022”
3.13 ha · 87–249 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084043DRMore in Dún Laoghaire-Rathdown →
Murphystown Way, Dublin 18, Dún Laoghaire-Rathdown, N/A
“commenced 16 Sep 2021, no completion certificate, planned end Feb 2022”
2.54 ha · 71–203 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0081586DRMore in Dún Laoghaire-Rathdown →
Dublin, Dún Laoghaire-Rathdown, A94 H9T8
“commenced 25 Jun 2021, no completion certificate, planned end Feb 2023”
4.56 ha · 127–365 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0078068DRMore in Dún Laoghaire-Rathdown →
Ballyogan Road, Leopardstown, Dublin 18
“commenced 19 May 2020, no completion certificate, planned end Aug 2020”
2.94 ha · 82–235 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005295DRMore in Dún Laoghaire-Rathdown →
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076159DRMore in Dún Laoghaire-Rathdown →
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076139DRMore in Dún Laoghaire-Rathdown →
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 May 2021, no completion certificate, planned end Aug 2021”
25.7 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076125DRMore in Dún Laoghaire-Rathdown →
Dublin, D18 TF72
“commenced 16 Jan 2019, no completion certificate, planned end Mar 2019”
0.65 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0047373DRMore in Dún Laoghaire-Rathdown →
Tully Development Area 8, Barrington Road, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 14 Apr 2021, no completion certificate, planned end Oct 2021”
9.68 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0074085DRMore in Dún Laoghaire-Rathdown →
Rock Hill, Dublin, A94 W3F2
“commenced 15 Jul 2019, no completion certificate, planned end Oct 2019”
0.14 ha · 3–10 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0054206DRMore in Dún Laoghaire-Rathdown →
Frascati Road, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.31 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066825DRMore in Dún Laoghaire-Rathdown →
5 Leopardstown Rd, Dublin, Dún Laoghaire-Rathdown, D18 XN80
“commenced 19 Oct 2020, no completion certificate, planned end Aug 2021”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0069446DRMore in Dún Laoghaire-Rathdown →
“commenced 26 Mar 2020, no completion certificate, planned end Jan 2021”
4.28 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0063175DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 17 Dec 2019, no completion certificate, planned end Jul 2020”
640 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0060272DRMore in Dún Laoghaire-Rathdown →
28 Merville Avenue, Stillorgan, Dún Laoghaire-Rathdown, A94DK28
“1 homes; commenced 01 Feb 2021, no completion certificate, planned end May 2021”
520 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072104DRMore in Dún Laoghaire-Rathdown →
18 Cherrywood, Loughlinstown
“commenced 15 Jul 2019, no completion certificate, planned end Aug 2019”
2.58 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0054567DRMore in Dún Laoghaire-Rathdown →
Cherrywood Business Park, Building 4, Dublin, D18 K7W4
“commenced 26 Feb 2019, no completion certificate, planned end Apr 2019”
0.46 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048808DRMore in Dún Laoghaire-Rathdown →
104 R116, Dublin, A96 T8X0
“0 homes; commenced 12 Nov 2018, no completion certificate, planned end Jan 2019”
440 m² · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045592DRMore in Dún Laoghaire-Rathdown →
Honeypark, Glenageary Road Upper & Kill Avenue, Dún Laoghaire
“197 homes; commenced 11 Aug 2015, no completion certificate, planned end Aug 2016”
410 m² · 197 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0009466DRMore in Dún Laoghaire-Rathdown →
Orwell Road, Dublin, Dún Laoghaire-Rathdown, D14 RX00
“1 homes; commenced 25 Aug 2022, no completion certificate, planned end Nov 2022”
480 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0092932DRMore in Dún Laoghaire-Rathdown →
Building 5, IBM Technology Campus, Dublin, Fingal, D15 HN66
“commenced 11 Jun 2021, no completion certificate, planned end Aug 2021”
Zoned HT · High Technology
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0077251FLMore in Fingal →
Saint Margaret's Road, Dublin, Fingal, D11 X3W7
“commenced 09 Oct 2020, no completion certificate, planned end Nov 2021”
Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0069184FLMore in Fingal →
Naul Road, Ballyboughal, Dublin
“25 homes; commenced 16 Nov 2017, no completion certificate, planned end Jan 2018”
25 homes · Zoned OS · Open Space
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0002672FLMore in Fingal →
Kilmacud Road Upper, Stillorgan
“48 homes; commenced 04 Aug 2015, no completion certificate, planned end Aug 2017”
0.86 ha · 48 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0009190DRMore in Dún Laoghaire-Rathdown →
claremount, Coolquoy Common, Fingal
“commenced 05 Aug 2020, no completion certificate, planned end Sep 2020”
0.96 ha · Zoned RU · Rural
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005449FLMore in Fingal →
Food Central, Roslin Food Park, Fingal, K67 V9F3
“commenced 31 Aug 2023, no completion certificate, planned end May 2024”
3.47 ha · Zoned FP · Food Park
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0104984FLMore in Fingal →
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
1.23 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0003783FLMore in Fingal →
Dublin, Dublin 15, D15 W244
“commenced 06 Dec 2019, no completion certificate, planned end Mar 2020”
2.73 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0059807FLMore in Fingal →
“commenced 15 Apr 2022, no completion certificate, planned end Jul 2022”
0.38 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0088231FLMore in Fingal →
Cedar Drive, Dublin Airport Logistics Park, Dublin, K67 YW68
“commenced 03 Nov 2022, no completion certificate, planned end Dec 2022”
2.37 ha · Zoned GE · General Employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0095349FLMore in Fingal →
New Road, Donabate, Dublin
“1 homes; commenced 07 Jun 2019, no completion certificate, planned end Oct 2019”
5.17 ha · 1 home · Zoned RS · Residential
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0052720FLMore in Fingal →
43 Bayside Square West, Dublin, Fingal
“commenced 17 Aug 2021, no completion certificate, planned end Nov 2021”
0.99 ha · 27–79 homes · Zoned LC · Local Centre
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080144FLMore in Fingal →
Not seeing what you need? .