Tullaroan Rd
Work started for 31 homes: a commencement notice was lodged, so the permission is in use.
2.17 ha · 31 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 2460090More in Co. Kilkenny →
New signals on development sites across 5 councils, newest first. Each card says why it’s here and links to the source.
No new live signals here in this stretch. The ones that ended are below.
Work started for 31 homes: a commencement notice was lodged, so the permission is in use.
2.17 ha · 31 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 2460090More in Co. Kilkenny →
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 11 homes · Zoned Existing Residential
Source: National planning applications map ↗ · Ref 211033More in Co. Kilkenny →
Work started for 29 homes: a commencement notice was lodged, so the permission is in use.
1.29 ha · 29 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 2289More in Co. Kilkenny →
1.86 ha · 40 homes
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref 1956More in Co. Kilkenny →
500 m² · 12 homes · Zoned Existing Residential
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref 1937More in Co. Kilkenny →
Work started for 58 homes: a commencement notice was lodged, so the permission is in use.
2.04 ha · 58 homes · Zoned Proposed Residential
Source: National planning applications map ↗ · Ref 2660134More in Co. Westmeath →
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.17 ha · 17 homes · Zoned Established Residential
Source: National planning applications map ↗ · Ref 206308More in Co. Westmeath →
Work started for 32 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 32 homes · Zoned Town Centre
Source: National planning applications map ↗ · Ref 2360101More in Co. Carlow →
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
1.05 ha · 10 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 21246More in Co. Carlow →
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.48 ha · 11 homes · Zoned Existing Residential
Source: National planning applications map ↗ · Ref 2360104More in Co. Kilkenny →
0.21 ha · 12 homes
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref 19639More in Co. Kilkenny →
Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court , and north of Bawnogue Park residential development (current
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
4.90 ha · 55 homes
Source: National planning applications map ↗ · Ref 2561306More in Co. Kildare →
Work started for 243 homes: a commencement notice was lodged, so the permission is in use.
0.38 ha · 243 homes · Zoned Existing Residential / Infill
Source: National planning applications map ↗ · Ref 2460055More in Co. Kildare →
Work started for 14 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 14 homes
Source: National planning applications map ↗ · Ref 24140More in Co. Kildare →
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
1.02 ha · 17 homes · Zoned General Development
Source: National planning applications map ↗ · Ref 23673More in Co. Kildare →
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
0.27 ha · 10 homes · Zoned Town Centre
Source: National planning applications map ↗ · Ref 235More in Co. Kildare →
Work started for 87 homes: a commencement notice was lodged, so the permission is in use.
3.60 ha · 87 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 211033More in Co. Kildare →
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.50 ha · 11 homes · Zoned Existing Residential / Infill
Source: National planning applications map ↗ · Ref 211643More in Co. Kildare →
Work started for 12 homes: a commencement notice was lodged, so the permission is in use.
780 m² · 12 homes
Source: National planning applications map ↗ · Ref 2360328More in Co. Kildare →
The Orchard , Oldtown Demesne , Sallins Road
Work started for 48 homes: a commencement notice was lodged, so the permission is in use.
0.14 ha · 48 homes · Zoned New Residential
Source: National planning applications map ↗ · Ref 2379More in Co. Kildare →
2.69 ha · 58 homes · Zoned New Residential
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref 19886More in Co. Kildare →
Work started for 37 homes: a commencement notice was lodged, so the permission is in use.
2.72 ha · 37 homes
Source: National planning applications map ↗ · Ref 2660381More in Co. Kildare →
Work started for 14 homes: a commencement notice was lodged, so the permission is in use.
0.69 ha · 14 homes
Source: National planning applications map ↗ · Ref 2560658More in Co. Kildare →
2.18 ha · 49 homes · Zoned Existing Residential / Infill
Source: National planning applications map ↗ · Ended 15 Oct 2026 · ref 181203More in Co. Kildare →
Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court and , north of Bawnogues Park residential development (curren
Work started for 95 homes: a commencement notice was lodged, so the permission is in use.
5.32 ha · 95 homes
Source: National planning applications map ↗ · Ref 2561347More in Co. Kildare →
Work started for 57 homes: a commencement notice was lodged, so the permission is in use.
2.13 ha · 57 homes
Source: National planning applications map ↗ · Ref 2460371More in Co. Kildare →
1.27 Ha site rear of 'Craughwell', 'Fairholme', & 'St. Benedict's'Brighton Rd, Foxrock, D18, access/egress & works to 'Craughwell' Brighton Rd, Foxrock D18, Harcourt Street tramline & Leopardstown Racecourse to south Brighton Wood, north by 'Goleen'
Work started for 37 homes: a commencement notice was lodged, so the permission is in use.
1.29 ha · 37 homes · Zoned A · To provide residential development and improve residential amenity…
Source: National planning applications map ↗ · Ref D21A/0051More in Dún Laoghaire-Rathdown →
Work started for 49 homes: a commencement notice was lodged, so the permission is in use.
0.33 ha · 49 homes · Zoned A · To provide residential development and improve residential amenity…
Source: National planning applications map ↗ · Ref LRD24A/0329More in Dún Laoghaire-Rathdown →
0.4939ha site at nos. 60 (Cois Cnoc), 61, 62 & 63 (Innisfree), Stepaside Lane, Stepaside, Dublin 18
0.50 ha · 29 homes · Zoned NC · To protect, provide for and-or improve mixed-use neighbourhood centre…
Source: National planning applications map ↗ · Ended 11 Oct 2026 · ref D18A/0971More in Dún Laoghaire-Rathdown →
Frascati Road, Blackrock, Dublin, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 14 Aug 2023, no completion certificate, planned end Oct 2023”
0.15 ha · 4–12 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0008905DRMore in Dún Laoghaire-Rathdown →
92 Bracken Road, Dublin, Dún Laoghaire-Rathdown, D18 CY92
“commenced 24 Jul 2023, no completion certificate, planned end Sep 2023”
0.42 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0103526DRMore in Dún Laoghaire-Rathdown →
77 Furze Road, Dublin, Dún Laoghaire-Rathdown, D18 C3X5
“commenced 10 May 2022, no completion certificate, planned end Dec 2022”
0.70 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0089029DRMore in Dún Laoghaire-Rathdown →
“commenced 22 Mar 2023, no completion certificate, planned end May 2023”
0.47 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0098693DRMore in Dún Laoghaire-Rathdown →
3 Arkle Road, Dublin, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 06 Mar 2023, no completion certificate, planned end May 2023”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0098189DRMore in Dún Laoghaire-Rathdown →
Pottery Road, Dublin, Dún Laoghaire-Rathdown, A96 F2A8
“commenced 25 Jan 2021, no completion certificate, planned end Jul 2021”
6.58 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072077DRMore in Dún Laoghaire-Rathdown →
Belfield Office Park, Beech Hill Rd,, Roebuck, Dublin 4, 8Q68 WH
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
0.28 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046627DRMore in Dún Laoghaire-Rathdown →
MountainVIew, Central Park, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 26 Jul 2022, no completion certificate, planned end Sep 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0091942DRMore in Dún Laoghaire-Rathdown →
Ballymoss Road, Dublin, Dún Laoghaire-Rathdown, D18 Y2C9
“commenced 08 Mar 2022, no completion certificate, planned end Jun 2022”
0.38 ha · 10–30 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0007004DRMore in Dún Laoghaire-Rathdown →
“commenced 17 Dec 2021, no completion certificate, planned end Mar 2022”
Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084438DRMore in Dún Laoghaire-Rathdown →
St. Patricks Boys' National School, Newgrange Rd, Blackrock, Dublin, Dublin, A94 FE02
“commenced 18 Jun 2020, no completion certificate, planned end Aug 2020”
2.68 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0065146DRMore in Dún Laoghaire-Rathdown →
4 Dundrum Road, Dublin, Dún Laoghaire-Rathdown, D14 VX61
“commenced 15 Feb 2022, no completion certificate, planned end May 2022”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0086031DRMore in Dún Laoghaire-Rathdown →
CHERRYWOOD BUSINESS PARK, Dublin, South Dublin, D18 T3Y1
“commenced 26 Aug 2021, no completion certificate, planned end Dec 2021”
0.43 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080525DRMore in Dún Laoghaire-Rathdown →
Dun Laoghaire Industrial Estate, Pottery Rd, Dun Laoghaire, Co Dublin, Dublin, Dún Laoghaire-Rathdown, A96 KW29
“commenced 23 Aug 2020, no completion certificate, planned end Jan 2021”
1.33 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067352DRMore in Dún Laoghaire-Rathdown →
1 Pottery Road, Dublin, Monaghan, D18 X2H4
“commenced 11 Jan 2019, no completion certificate, planned end May 2019”
0.34 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0003854DRMore in Dún Laoghaire-Rathdown →
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2022”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0074061DRMore in Dún Laoghaire-Rathdown →
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 26 Jan 2021, no completion certificate, planned end Jul 2021”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072214DRMore in Dún Laoghaire-Rathdown →
“commenced 10 Aug 2020, no completion certificate, planned end Dec 2020”
1.96 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067040DRMore in Dún Laoghaire-Rathdown →
Building 11, Cherrywood Business Park, Dublin, Dún Laoghaire-Rathdown, D18 DH50
“commenced 02 Dec 2020, no completion certificate, planned end May 2021”
0.51 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0071024DRMore in Dún Laoghaire-Rathdown →
7 ST. HELEN'S VILLAS, ROCK ROAD, BOOTERSTOWN, CO. DUBLIN, Dublin, A94 H3F9
“1 homes; commenced 13 Sep 2018, no completion certificate, planned end Mar 2019”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0043503DRMore in Dún Laoghaire-Rathdown →
Blackthorn Road,, Dublin, D18 F5X2
“commenced 07 Aug 2019, no completion certificate, planned end Dec 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0055359DRMore in Dún Laoghaire-Rathdown →
Mountain View, Central Park, Dublin, D18 XN97
“commenced 01 May 2019, no completion certificate, planned end Jul 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0051263DRMore in Dún Laoghaire-Rathdown →
BLACKTHORN ROAD, Dublin 18,SANDYFORD INDUSTRIAL ESTATE, D18 F5X2
“commenced 10 Apr 2019, no completion certificate, planned end Jul 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050602DRMore in Dún Laoghaire-Rathdown →
Barnhill Road, Dublin
“1 homes; commenced 03 Apr 2019, no completion certificate, planned end Oct 2019”
0.20 ha · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050152DRMore in Dún Laoghaire-Rathdown →
Cherrywood Park, Dublin, D18 DH50
“commenced 18 Mar 2019, no completion certificate, planned end Jun 2019”
0.51 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0049526DRMore in Dún Laoghaire-Rathdown →
South County Business Park, Leopardstown, Dublin, Dublin, D18 DH6K
“commenced 23 Nov 2018, no completion certificate, planned end Dec 2019”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046189DRMore in Dún Laoghaire-Rathdown →
Ardagh Drive, Dublin, A94 EW97
“1 homes; commenced 19 Nov 2018, no completion certificate, planned end May 2019”
580 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045825DRMore in Dún Laoghaire-Rathdown →
Mountain View, Central Park, Dublin, D18XN97
“commenced 18 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0040100DRMore in Dún Laoghaire-Rathdown →
Corner of Carmanhal Road & Blackthorn Road, Dublin, NA
“commenced 24 Jul 2018, no completion certificate, planned end Sep 2018”
0.85 ha · 23–67 homes · Zoned A2 · To provide for the creation of sustainable residential neighbourhoods…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0041839DRMore in Dún Laoghaire-Rathdown →
Arkle Road, Dublin, D18 Y3X2
“commenced 25 Apr 2018, no completion certificate, planned end Oct 2018”
0.41 ha · 11–32 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037870DRMore in Dún Laoghaire-Rathdown →
Block H, Central Park, Leopardstown, D18 CK74
“commenced 09 Nov 2018, no completion certificate, planned end Feb 2019”
0.54 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045842DRMore in Dún Laoghaire-Rathdown →
Blackthorn Road, Dublin, D18 KX32
“commenced 12 Apr 2018, no completion certificate, planned end Sep 2018”
80 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037498DRMore in Dún Laoghaire-Rathdown →
South Country Business Park, Dublin, D18 X5K7
“commenced 28 Apr 2018, no completion certificate, planned end Jul 2018”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0038120DRMore in Dún Laoghaire-Rathdown →
Bracken Road, Dublin, D18 K2N9
“commenced 20 Oct 2018, no completion certificate, planned end Mar 2019”
0.35 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0044933DRMore in Dún Laoghaire-Rathdown →
Sussex Street, Dublin, Dún Laoghaire-Rathdown, A96 C786
“10 homes; commenced 22 May 2023, no completion certificate, planned end Jun 2023”
520 m² · 10 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0100833DRMore in Dún Laoghaire-Rathdown →
Sandyford Road, Dundrum Town Centre, Dún Laoghaire-Rathdown
“commenced 20 Dec 2022, no completion certificate, planned end Dec 2022”
0.49 ha · 13–39 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0096473DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 07 Jun 2022, no completion certificate, planned end Sep 2022”
630 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090091DRMore in Dún Laoghaire-Rathdown →
RSA House, Sandyford Rd, Dublin, Dún Laoghaire-Rathdown, D16 FC92
“commenced 02 Dec 2021, no completion certificate, planned end Feb 2022”
3.13 ha · 87–249 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084043DRMore in Dún Laoghaire-Rathdown →
Murphystown Way, Dublin 18, Dún Laoghaire-Rathdown, N/A
“commenced 16 Sep 2021, no completion certificate, planned end Feb 2022”
2.54 ha · 71–203 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0081586DRMore in Dún Laoghaire-Rathdown →
Dublin, Dún Laoghaire-Rathdown, A94 H9T8
“commenced 25 Jun 2021, no completion certificate, planned end Feb 2023”
4.56 ha · 127–365 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0078068DRMore in Dún Laoghaire-Rathdown →
Ballyogan Road, Leopardstown, Dublin 18
“commenced 19 May 2020, no completion certificate, planned end Aug 2020”
2.94 ha · 82–235 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005295DRMore in Dún Laoghaire-Rathdown →
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076159DRMore in Dún Laoghaire-Rathdown →
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076139DRMore in Dún Laoghaire-Rathdown →
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 May 2021, no completion certificate, planned end Aug 2021”
25.7 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076125DRMore in Dún Laoghaire-Rathdown →
Dublin, D18 TF72
“commenced 16 Jan 2019, no completion certificate, planned end Mar 2019”
0.65 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0047373DRMore in Dún Laoghaire-Rathdown →
Tully Development Area 8, Barrington Road, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 14 Apr 2021, no completion certificate, planned end Oct 2021”
9.68 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0074085DRMore in Dún Laoghaire-Rathdown →
Rock Hill, Dublin, A94 W3F2
“commenced 15 Jul 2019, no completion certificate, planned end Oct 2019”
0.14 ha · 3–10 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0054206DRMore in Dún Laoghaire-Rathdown →
Frascati Road, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.31 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066825DRMore in Dún Laoghaire-Rathdown →
5 Leopardstown Rd, Dublin, Dún Laoghaire-Rathdown, D18 XN80
“commenced 19 Oct 2020, no completion certificate, planned end Aug 2021”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0069446DRMore in Dún Laoghaire-Rathdown →
“commenced 26 Mar 2020, no completion certificate, planned end Jan 2021”
4.28 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0063175DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 17 Dec 2019, no completion certificate, planned end Jul 2020”
640 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0060272DRMore in Dún Laoghaire-Rathdown →
28 Merville Avenue, Stillorgan, Dún Laoghaire-Rathdown, A94DK28
“1 homes; commenced 01 Feb 2021, no completion certificate, planned end May 2021”
520 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072104DRMore in Dún Laoghaire-Rathdown →
18 Cherrywood, Loughlinstown
“commenced 15 Jul 2019, no completion certificate, planned end Aug 2019”
2.58 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0054567DRMore in Dún Laoghaire-Rathdown →
Cherrywood Business Park, Building 4, Dublin, D18 K7W4
“commenced 26 Feb 2019, no completion certificate, planned end Apr 2019”
0.46 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048808DRMore in Dún Laoghaire-Rathdown →
104 R116, Dublin, A96 T8X0
“0 homes; commenced 12 Nov 2018, no completion certificate, planned end Jan 2019”
440 m² · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045592DRMore in Dún Laoghaire-Rathdown →
Honeypark, Glenageary Road Upper & Kill Avenue, Dún Laoghaire
“197 homes; commenced 11 Aug 2015, no completion certificate, planned end Aug 2016”
410 m² · 197 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0009466DRMore in Dún Laoghaire-Rathdown →
Orwell Road, Dublin, Dún Laoghaire-Rathdown, D14 RX00
“1 homes; commenced 25 Aug 2022, no completion certificate, planned end Nov 2022”
480 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0092932DRMore in Dún Laoghaire-Rathdown →
Kilmacud Road Upper, Stillorgan
“48 homes; commenced 04 Aug 2015, no completion certificate, planned end Aug 2017”
0.86 ha · 48 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0009190DRMore in Dún Laoghaire-Rathdown →
87 Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D14 W6X6
“commenced 09 Aug 2023, no completion certificate, planned end Sep 2023”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0104027DRMore in Dún Laoghaire-Rathdown →
Vodafone, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 31 Jul 2023, no completion certificate, planned end Aug 2023”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0103493DRMore in Dún Laoghaire-Rathdown →
9 The Hill, Dublin, a94 a240
“commenced 11 Mar 2019, no completion certificate, planned end Sep 2019”
1.33 ha · 37–106 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0049457DRMore in Dún Laoghaire-Rathdown →
4 Blackthorn Road, Dublin, D18 F5X2
“commenced 02 Jul 2019, no completion certificate, planned end Sep 2019”
0.42 ha · 11–33 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0053701DRMore in Dún Laoghaire-Rathdown →
Carysfort Avenue, Blackrock, Dún Laoghaire-Rathdown, A94 H2X4
“commenced 21 Jun 2022, no completion certificate, planned end Oct 2022”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090531DRMore in Dún Laoghaire-Rathdown →
L5, Termini Building, 3 Arkle Road, Sandyford, Dublin 18, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 02 Nov 2021, no completion certificate, planned end Dec 2021”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0083139DRMore in Dún Laoghaire-Rathdown →
Central Park, Leopardstown, Dublin, Dún Laoghaire-Rathdown, D18 NH10
“commenced 30 Aug 2021, no completion certificate, planned end Mar 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080782DRMore in Dún Laoghaire-Rathdown →
89 Furze Road, Dublin, D18 CK84
“commenced 24 Aug 2021, no completion certificate, planned end Jan 2022”
0.15 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080321DRMore in Dún Laoghaire-Rathdown →
Block C Central Park Leopardstown, Dublin, D18 N924
“commenced 29 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0040745DRMore in Dún Laoghaire-Rathdown →
Central Park, Leopardstown, Dublin, D18 X9R6
“commenced 21 Feb 2019, no completion certificate, planned end Mar 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048352DRMore in Dún Laoghaire-Rathdown →
Dublin, Dún Laoghaire-Rathdown, D18 C9C5
“commenced 27 Aug 2021, no completion certificate, planned end Dec 2021”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080457DRMore in Dún Laoghaire-Rathdown →
Murphystown Way, dublin 18, Dún Laoghaire-Rathdown, 0000
“commenced 27 Jul 2020, no completion certificate, planned end Oct 2020”
9.63 ha · 269–770 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066720DRMore in Dún Laoghaire-Rathdown →
Dublin, D14 FH90
“commenced 07 Jul 2020, no completion certificate, planned end Nov 2020”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066157DRMore in Dún Laoghaire-Rathdown →
Brewery Road, Stillorgan, Blackrock, Dublin, A94 W0PP
“commenced 23 Jan 2020, no completion certificate, planned end Apr 2020”
1.80 ha · 50–144 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0060944DRMore in Dún Laoghaire-Rathdown →
31 Trimleston Avenue, Booterstown, A94 TX94
“commenced 25 Nov 2019, no completion certificate, planned end Jan 2020”
0.55 ha · 15–43 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0059278DRMore in Dún Laoghaire-Rathdown →
Park Court, Glenageary, A96 N6X3
“commenced 26 Aug 2019, no completion certificate, planned end Sep 2019”
0.40 ha · 11–32 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0056021DRMore in Dún Laoghaire-Rathdown →
Stradbrook Road, Dublin, A94 K2V8
“commenced 10 Sep 2019, no completion certificate, planned end Nov 2019”
5.01 ha · Zoned F · To preserve and provide for open space with ancillary active…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0056627DRMore in Dún Laoghaire-Rathdown →
Arkle Road, Sandyford, D18 X6N2
“commenced 04 Mar 2019, no completion certificate, planned end May 2019”
590 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048960DRMore in Dún Laoghaire-Rathdown →
8 Pottery Road, Dublin, A96 W6T8
“commenced 01 Jun 2018, no completion certificate, planned end Sep 2018”
10.5 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0039298DRMore in Dún Laoghaire-Rathdown →
“commenced 09 Apr 2018, no completion certificate, planned end Jul 2018”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037419DRMore in Dún Laoghaire-Rathdown →
Stanford Park, Foxrock, Dublin 18
“16 homes; commenced 13 Oct 2017, no completion certificate, planned end Jan 2019”
1.16 ha · 16 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0032501DRMore in Dún Laoghaire-Rathdown →
Frascati Road, Blackrock, Dublin, Dún Laoghaire-Rathdown, A94 X9Y3
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.30 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066828DRMore in Dún Laoghaire-Rathdown →
“commenced 17 Jul 2020, no completion certificate, planned end Sep 2020”
1.36 ha · 38–108 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066430DRMore in Dún Laoghaire-Rathdown →
“commenced 17 Jun 2019, no completion certificate, planned end Sep 2019”
1.46 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0052991DRMore in Dún Laoghaire-Rathdown →
Laughanstown, Cherrywood, Dublin 18, Dún Laoghaire-Rathdown
“1 homes; commenced 14 Feb 2022, no completion certificate, planned end Jun 2022”
9.79 ha · 1 home
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0085897DRMore in Dún Laoghaire-Rathdown →
“commenced 18 May 2021, no completion certificate, planned end Jul 2021”
630 m² · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076232DRMore in Dún Laoghaire-Rathdown →
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2021”
25.7 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0073815DRMore in Dún Laoghaire-Rathdown →
“commenced 08 Apr 2021, no completion certificate, planned end Jul 2021”
1.29 ha · 36–103 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0073809DRMore in Dún Laoghaire-Rathdown →
3 Frascati Road, Blackrock, 1400
“commenced 11 Feb 2020, no completion certificate, planned end Jun 2020”
0.11 ha · 3–8 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0061658DRMore in Dún Laoghaire-Rathdown →
Land at Cherrywood, Dublin, Dún Laoghaire-Rathdown, D18 WD60
“1 homes; commenced 08 Feb 2021, no completion certificate, planned end Jun 2021”
17.0 ha · 1 home
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072226DRMore in Dún Laoghaire-Rathdown →
Brewery Road, Dublin, Dún Laoghaire-Rathdown
“commenced 12 Oct 2020, no completion certificate, planned end Aug 2021”
21.4 ha · Zoned F · To preserve and provide for open space with ancillary active…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0069268DRMore in Dún Laoghaire-Rathdown →
“commenced 25 Aug 2020, no completion certificate, planned end Sep 2020”
0.35 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067419DRMore in Dún Laoghaire-Rathdown →
York rd., Dublin, Dún Laoghaire-Rathdown, A96 H361
“1 homes; commenced 02 Sep 2020, no completion certificate, planned end Oct 2020”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067706DRMore in Dún Laoghaire-Rathdown →
Not seeing what you need? .