Wed 7 Oct · 1 Permitted, not started New Ross, Co. Wexford
Granted 7 Oct 2026 for 44 homes. No commencement notice yet; the permission runs to 6 Oct 2031.
Permitted but idle: the owner may want a builder or a buyer.
1.05 ha · 44 homes
Sat 3 Oct · 1 Permission expired Dundalk South, Co. Louth
Permission for 20 homes expired 3 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
100 m² · 20 homes · Zoned Existing Residential
New development sites in Dublin, every Monday The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Ended lately (118) Permissions that started, sites off a register, notices closed Today Permitted, not started Ended Co. Wexford
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.78 ha · 17 homes
Permitted, not started Ended Co. Carlow
Work started for 32 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 32 homes · Zoned Town Centre
Permission running out Ended Tullow, Co. Carlow
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
1.05 ha · 10 homes · Zoned New Residential
Yesterday Permitted, not started Ended Dundalk South, Co. Louth
Work started for 15 homes: a commencement notice was lodged, so the permission is in use.
0.29 ha · 15 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 31 homes: a commencement notice was lodged, so the permission is in use.
1.18 ha · 31 homes · Zoned New Residential Phase 1
Permitted, not started Ended Dundalk-Carlingford, Co. Louth
Work started for 25 homes: a commencement notice was lodged, so the permission is in use.
9.93 ha · 25 homes · Zoned New Residential Phase 1
Permission expired Ended Drogheda Rural, Co. Louth
0.57 ha · 40 homes · Zoned New Residential Phase 1
Permitted, not started Ended Dundalk South, Co. Louth
Work started for 65 homes: a commencement notice was lodged, so the permission is in use.
2.29 ha · 65 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Urban, Co. Louth
Bayview House (Protected Structure DB-301) and Bayview Cottage , Cromwell’s Lane & St. Mary’s Villas Lagavooren , Drogheda Co.Louth
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
0.63 ha · 54 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 54 homes · Zoned New Residential Phase 1
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 68 homes: a commencement notice was lodged, so the permission is in use.
3.03 ha · 68 homes · Zoned New Residential Phase 1
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 82 homes: a commencement notice was lodged, so the permission is in use.
3.75 ha · 82 homes · Zoned New Residential Phase 1
Permission running out Ended Dundalk South, Co. Louth
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.57 ha · 11 homes · Zoned Existing Residential
Permission expired Ended Ardee, Co. Louth
2.37 ha · 40 homes · Zoned New Residential Phase 1
Permitted, not started Ended Maynooth, Co. Kildare
Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court , and north of Bawnogue Park residential development (current
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
4.90 ha · 55 homes
Permitted, not started Ended Leixlip, Co. Kildare
Work started for 243 homes: a commencement notice was lodged, so the permission is in use.
0.38 ha · 243 homes · Zoned Existing Residential / Infill
Permitted, not started Ended Clane, Co. Kildare
Work started for 14 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 14 homes
Permitted, not started Ended Co. Kildare
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
1.02 ha · 17 homes · Zoned General Development
Permitted, not started Ended Clane, Co. Kildare
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
0.27 ha · 10 homes · Zoned Town Centre
Permitted, not started Ended Co. Kildare
Work started for 87 homes: a commencement notice was lodged, so the permission is in use.
3.60 ha · 87 homes · Zoned New Residential
Permission running out Ended Naas, Co. Kildare
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.50 ha · 11 homes · Zoned Existing Residential / Infill
Permission expired Ended Dundalk South, Co. Louth
100 m² · 20 homes · Zoned Existing Residential
Permitted, not started Ended Dundalk South, Co. Louth
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
2.19 ha · 55 homes · Zoned Existing Residential
Permitted, not started Ended Newbridge, Co. Kildare
Work started for 12 homes: a commencement notice was lodged, so the permission is in use.
780 m² · 12 homes
Permitted, not started Ended Naas, Co. Kildare
The Orchard , Oldtown Demesne , Sallins Road
Work started for 48 homes: a commencement notice was lodged, so the permission is in use.
0.14 ha · 48 homes · Zoned New Residential
Permission expired Ended Naas, Co. Kildare
2.69 ha · 58 homes · Zoned New Residential
Permitted, not started Ended Celbridge, Co. Kildare
Work started for 37 homes: a commencement notice was lodged, so the permission is in use.
2.72 ha · 37 homes
Permitted, not started Ended Co. Kildare
Work started for 14 homes: a commencement notice was lodged, so the permission is in use.
0.69 ha · 14 homes
Permission running out Ended Dundalk-Carlingford, Co. Louth
Work started for 93 homes: a commencement notice was lodged, so the permission is in use.
2.81 ha · 93 homes · Zoned New Residential Phase 1
Permission running out Ended Ardee, Co. Louth
Work started for 52 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 52 homes · Zoned New Residential Phase 1
Permission expired Ended Clane, Co. Kildare
2.18 ha · 49 homes · Zoned Existing Residential / Infill
Permission running out Ended Dundalk-Carlingford, Co. Louth
Work started for 19 homes: a commencement notice was lodged, so the permission is in use.
1.17 ha · 19 homes · Zoned New Residential Phase 1
Permitted, not started Ended Maynooth, Co. Kildare
Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court and , north of Bawnogues Park residential development (curren
Work started for 95 homes: a commencement notice was lodged, so the permission is in use.
5.32 ha · 95 homes
Permitted, not started Ended Celbridge, Co. Kildare
Work started for 57 homes: a commencement notice was lodged, so the permission is in use.
2.13 ha · 57 homes
Permission running out Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
1.27 Ha site rear of 'Craughwell', 'Fairholme', & 'St. Benedict's'Brighton Rd, Foxrock, D18, access/egress & works to 'Craughwell' Brighton Rd, Foxrock D18, Harcourt Street tramline & Leopardstown Racecourse to south Brighton Wood, north by 'Goleen'
Work started for 37 homes: a commencement notice was lodged, so the permission is in use.
1.29 ha · 37 homes · Zoned A · To provide residential development and improve residential amenity…
Permitted, not started Ended Stillorgan, Dún Laoghaire-Rathdown
Work started for 49 homes: a commencement notice was lodged, so the permission is in use.
0.33 ha · 49 homes · Zoned A · To provide residential development and improve residential amenity…
Permission expired Ended Firhouse-Bohernabreena, South Dublin
9.79 ha · 38 homes · Zoned RES · To protect and/or improve residential amenity
Sun 11 Oct Permitted, not started Ended Clondalkin, South Dublin
Land adjacent to Drury Mills & Drury Park, Swiftbrook, Saggart, Co. Dublin
Work started for 73 homes: a commencement notice was lodged, so the permission is in use.
1.33 ha · 73 homes · Zoned RES · To protect and/or improve residential amenity
Permission expired Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
0.4939ha site at nos. 60 (Cois Cnoc), 61, 62 & 63 (Innisfree), Stepaside Lane, Stepaside, Dublin 18
0.50 ha · 29 homes · Zoned NC · To protect, provide for and-or improve mixed-use neighbourhood centre…
Sun 27 Sep Stalled build Ended Clondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 12 Oct 2022, no completion certificate, planned end Jan 2023”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Firhouse-Bohernabreena, South Dublin
“commenced 18 Dec 2020, no completion certificate, planned end Jan 2021”
1.24 ha · 34–99 homes · Zoned DC · To protect, improve and provide for the future development of…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
St. James Road / Limekiln Green, Dublin, D12 A02K
“commenced 09 Jul 2018, no completion certificate, planned end Aug 2018”
0.80 ha · 22–64 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Orwell park, Dublin, D6W TF88
“commenced 04 Feb 2020, no completion certificate, planned end Dec 2020”
0.77 ha · 21–61 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Ballymount Road Lower, Dublin, South Dublin, D12 RW10
“commenced 14 Sep 2020, no completion certificate, planned end May 2022”
1.14 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
Pfizer Grange Castle, Grange Castle international Business Park, Dublin, South Dublin, D22 V8F8
“commenced 30 Nov 2020, no completion certificate, planned end Feb 2022”
35.7 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Lucan, South Dublin
Weston Airport,, Backweston Park, Leixlip, South Dublin, W23 XHF8
“commenced 21 Aug 2023, no completion certificate, planned end Mar 2024”
0.73 ha · Zoned RU · To protect and improve rural amenity and to provide for the…
Stalled build Ended Tallaght Central, South Dublin
SERLA HOUSE HIBERNIAN INDUSTRIAL ESTATE, Dublin, South Dublin, D24 NX22
“commenced 11 Nov 2020, no completion certificate, planned end Nov 2020”
690 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 18 Oct 2021, no completion certificate, planned end Mar 2022”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Lucan, South Dublin
Adamstown, Lucan, Dublin
“commenced 14 Aug 2019, no completion certificate, planned end Dec 2020”
1.07 ha · 29–85 homes · Zoned SDZ · To provide for strategic development in accordance with approved…
Stalled build Ended Clondalkin, South Dublin
Main Street, Newcastle, Dublin 22, D22
“40 homes; commenced 01 Jul 2019, no completion certificate, planned end Sep 2019”
1.75 ha · 40 homes
Stalled build Ended Tallaght South, South Dublin
3007 Lake Drive, Citywest Business Campus,, Dublin, South Dublin, D24 N2HR
“commenced 09 Mar 2021, no completion certificate, planned end May 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
74 Broadfield Avenue, Rathcoole, D24 PX01
“0 homes; commenced 14 Oct 2019, no completion certificate, planned end Oct 2019”
240 m² · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Unit 2A, Smurfit Packaging Systems, Ballymount Road Lower, Dublin, D12 KD80
“commenced 14 Sep 2022, no completion certificate, planned end Nov 2022”
0.13 ha · 3–10 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Palmerstown-Fonthill, South Dublin
Fonthill Road Lucan Co Dublin, Dublin, South Dublin, D22WC63
“commenced 22 Feb 2021, no completion certificate, planned end Mar 2021”
Zoned RW · To provide for and consolidate retail warehousing
Stalled build Ended Clondalkin, South Dublin
“1 homes; commenced 08 Nov 2022, no completion certificate, planned end Mar 2023”
730 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
JFK Avenue, Dublin, South Dublin, D12 NX74
“commenced 18 Jul 2022, no completion certificate, planned end Jul 2022”
0.50 ha · 13–39 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Clondalkin, South Dublin
New Nangor Road, Profile Park, South Dublin
“commenced 20 Apr 2023, no completion certificate, planned end Feb 2025”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
Monastery Road, Dublin, South Dublin, D22 F8F5
“commenced 07 Dec 2022, no completion certificate, planned end Feb 2023”
Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
2 Fonthill Park, Dublin
“1 homes; commenced 04 Jul 2018, no completion certificate, planned end Nov 2018”
320 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Clondalkin, South Dublin
Profile Park Business Park, New Nangor Road, Dublin 22, South Dublin
“commenced 04 Aug 2023, no completion certificate, planned end Nov 2024”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght South, South Dublin
2020 Bianconi Avenue, Dublin, Dublin 24, D24 T683
“commenced 10 Apr 2019, no completion certificate, planned end Apr 2019”
6.55 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
“commenced 21 Jul 2023, no completion certificate, planned end Sep 2023”
1.82 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght Central, South Dublin
“commenced 11 Nov 2022, no completion certificate, planned end Nov 2023”
Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Tallaght South, South Dublin
Kingswood Avenue, Dublin, South Dublin, D24 W1HP
“commenced 30 Nov 2020, no completion certificate, planned end Jul 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Palmerstown-Fonthill, South Dublin
Fonthill Road, Dublin, Dublin 22, D22 KP89
“commenced 21 Mar 2019, no completion certificate, planned end Jun 2019”
1.08 ha · Zoned MRC · To protect, improve and provide for the future development of a Major…
Stalled build Ended Clondalkin, South Dublin
Site partially bounded by Profile Park road on the east, north and west., Profile Park, South Dublin
“commenced 04 Apr 2023, no completion certificate, planned end Apr 2024”
0.67 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght South, South Dublin
2050 Orchard Avenue, Dublin, D24 WKP2
“commenced 15 Aug 2019, no completion certificate, planned end Oct 2019”
0.10 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended South Dublin
Roselawn, Ballydowd,, Lucan,, South Dublin
“commenced 15 Aug 2022, no completion certificate, planned end Nov 2022”
Stalled build Ended Clondalkin, South Dublin
Newlands Cross, Dublin 22, D22 W324
“commenced 12 Dec 2019, no completion certificate, planned end Dec 2019”
0.18 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended South Dublin
Ballymount Road Upper, Ballymount, Dublin, D12 VFEO
“commenced 13 Dec 2018, no completion certificate, planned end Dec 2019”
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Frascati Road, Blackrock, Dublin, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 14 Aug 2023, no completion certificate, planned end Oct 2023”
0.15 ha · 4–12 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
92 Bracken Road, Dublin, Dún Laoghaire-Rathdown, D18 CY92
“commenced 24 Jul 2023, no completion certificate, planned end Sep 2023”
0.42 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
77 Furze Road, Dublin, Dún Laoghaire-Rathdown, D18 C3X5
“commenced 10 May 2022, no completion certificate, planned end Dec 2022”
0.70 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
“commenced 22 Mar 2023, no completion certificate, planned end May 2023”
0.47 ha
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
3 Arkle Road, Dublin, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 06 Mar 2023, no completion certificate, planned end May 2023”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
Pottery Road, Dublin, Dún Laoghaire-Rathdown, A96 F2A8
“commenced 25 Jan 2021, no completion certificate, planned end Jul 2021”
6.58 ha · Zoned E · To provide for economic development and employment
Stalled build Ended Stillorgan, Dún Laoghaire-Rathdown
Belfield Office Park, Beech Hill Rd,, Roebuck, Dublin 4, 8Q68 WH
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
0.28 ha · Zoned E · To provide for economic development and employment
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
MountainVIew, Central Park, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 26 Jul 2022, no completion certificate, planned end Sep 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Ballymoss Road, Dublin, Dún Laoghaire-Rathdown, D18 Y2C9
“commenced 08 Mar 2022, no completion certificate, planned end Jun 2022”
0.38 ha · 10–30 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 17 Dec 2021, no completion certificate, planned end Mar 2022”
Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
St. Patricks Boys' National School, Newgrange Rd, Blackrock, Dublin, Dublin, A94 FE02
“commenced 18 Jun 2020, no completion certificate, planned end Aug 2020”
2.68 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Stalled build Ended Dundrum, Dún Laoghaire-Rathdown
4 Dundrum Road, Dublin, Dún Laoghaire-Rathdown, D14 VX61
“commenced 15 Feb 2022, no completion certificate, planned end May 2022”
Zoned E · To provide for economic development and employment
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
CHERRYWOOD BUSINESS PARK, Dublin, South Dublin, D18 T3Y1
“commenced 26 Aug 2021, no completion certificate, planned end Dec 2021”
0.43 ha
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
Dun Laoghaire Industrial Estate, Pottery Rd, Dun Laoghaire, Co Dublin, Dublin, Dún Laoghaire-Rathdown, A96 KW29
“commenced 23 Aug 2020, no completion certificate, planned end Jan 2021”
1.33 ha · Zoned E · To provide for economic development and employment
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
1 Pottery Road, Dublin, Monaghan, D18 X2H4
“commenced 11 Jan 2019, no completion certificate, planned end May 2019”
0.34 ha · Zoned E · To provide for economic development and employment
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2022”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 26 Jan 2021, no completion certificate, planned end Jul 2021”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 10 Aug 2020, no completion certificate, planned end Dec 2020”
1.96 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Building 11, Cherrywood Business Park, Dublin, Dún Laoghaire-Rathdown, D18 DH50
“commenced 02 Dec 2020, no completion certificate, planned end May 2021”
0.51 ha
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
7 ST. HELEN'S VILLAS, ROCK ROAD, BOOTERSTOWN, CO. DUBLIN, Dublin, A94 H3F9
“1 homes; commenced 13 Sep 2018, no completion certificate, planned end Mar 2019”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Blackthorn Road,, Dublin, D18 F5X2
“commenced 07 Aug 2019, no completion certificate, planned end Dec 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Mountain View, Central Park, Dublin, D18 XN97
“commenced 01 May 2019, no completion certificate, planned end Jul 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
BLACKTHORN ROAD, Dublin 18,SANDYFORD INDUSTRIAL ESTATE, D18 F5X2
“commenced 10 Apr 2019, no completion certificate, planned end Jul 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
Barnhill Road, Dublin
“1 homes; commenced 03 Apr 2019, no completion certificate, planned end Oct 2019”
0.20 ha · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Cherrywood Park, Dublin, D18 DH50
“commenced 18 Mar 2019, no completion certificate, planned end Jun 2019”
0.51 ha
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
South County Business Park, Leopardstown, Dublin, Dublin, D18 DH6K
“commenced 23 Nov 2018, no completion certificate, planned end Dec 2019”
Zoned OE · To provide for office and enterprise development
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Ardagh Drive, Dublin, A94 EW97
“1 homes; commenced 19 Nov 2018, no completion certificate, planned end May 2019”
580 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Mountain View, Central Park, Dublin, D18XN97
“commenced 18 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Corner of Carmanhal Road & Blackthorn Road, Dublin, NA
“commenced 24 Jul 2018, no completion certificate, planned end Sep 2018”
0.85 ha · 23–67 homes · Zoned A2 · To provide for the creation of sustainable residential neighbourhoods…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Arkle Road, Dublin, D18 Y3X2
“commenced 25 Apr 2018, no completion certificate, planned end Oct 2018”
0.41 ha · 11–32 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Block H, Central Park, Leopardstown, D18 CK74
“commenced 09 Nov 2018, no completion certificate, planned end Feb 2019”
0.54 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Blackthorn Road, Dublin, D18 KX32
“commenced 12 Apr 2018, no completion certificate, planned end Sep 2018”
80 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
South Country Business Park, Dublin, D18 X5K7
“commenced 28 Apr 2018, no completion certificate, planned end Jul 2018”
Zoned OE · To provide for office and enterprise development
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Bracken Road, Dublin, D18 K2N9
“commenced 20 Oct 2018, no completion certificate, planned end Mar 2019”
0.35 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
Sussex Street, Dublin, Dún Laoghaire-Rathdown, A96 C786
“10 homes; commenced 22 May 2023, no completion certificate, planned end Jun 2023”
520 m² · 10 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled build Ended Dundrum, Dún Laoghaire-Rathdown
Sandyford Road, Dundrum Town Centre, Dún Laoghaire-Rathdown
“commenced 20 Dec 2022, no completion certificate, planned end Dec 2022”
0.49 ha · 13–39 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
“1 homes; commenced 07 Jun 2022, no completion certificate, planned end Sep 2022”
630 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Dundrum, Dún Laoghaire-Rathdown
RSA House, Sandyford Rd, Dublin, Dún Laoghaire-Rathdown, D16 FC92
“commenced 02 Dec 2021, no completion certificate, planned end Feb 2022”
3.13 ha · 87–249 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Murphystown Way, Dublin 18, Dún Laoghaire-Rathdown, N/A
“commenced 16 Sep 2021, no completion certificate, planned end Feb 2022”
2.54 ha · 71–203 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Dublin, Dún Laoghaire-Rathdown, A94 H9T8
“commenced 25 Jun 2021, no completion certificate, planned end Feb 2023”
4.56 ha · 127–365 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Ballyogan Road, Leopardstown, Dublin 18
“commenced 19 May 2020, no completion certificate, planned end Aug 2020”
2.94 ha · 82–235 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 May 2021, no completion certificate, planned end Aug 2021”
25.7 ha
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Dublin, D18 TF72
“commenced 16 Jan 2019, no completion certificate, planned end Mar 2019”
0.65 ha
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Tully Development Area 8, Barrington Road, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 14 Apr 2021, no completion certificate, planned end Oct 2021”
9.68 ha
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Rock Hill, Dublin, A94 W3F2
“commenced 15 Jul 2019, no completion certificate, planned end Oct 2019”
0.14 ha · 3–10 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Frascati Road, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.31 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…