Wed 7 Oct · 1 Permitted, not started New Ross, Co. Wexford
Granted 7 Oct 2026 for 44 homes. No commencement notice yet; the permission runs to 6 Oct 2031.
Permitted but idle: the owner may want a builder or a buyer.
1.05 ha · 44 homes
Wed 30 Sep · 1 Permitted, not started Ratoath, Co. Meath
Granted 30 Sept 2026 for 13 homes. No commencement notice yet; the permission runs to 6 Sept 2028.
0.29 ha · 13 homes · Zoned D1 · Tourism
Mon 28 Sep · 1 Permitted, not started Baltinglass, Co. Wicklow
Granted 28 Sept 2026 for 14 homes. No commencement notice yet; the permission runs to 27 Sept 2031.
0.24 ha · 14 homes · Zoned New Residential
New development sites in Dublin, every Monday The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Ended lately (117) Permissions that started, sites off a register, notices closed Today Permitted, not started Ended Co. Wexford
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.78 ha · 17 homes
Permitted, not started Ended Portlaoise, Co. Laois
A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois
Work started for 74 homes: a commencement notice was lodged, so the permission is in use.
3.37 ha · 74 homes · Zoned Strategic Reserve
Permitted, not started Ended Borris-in-Ossory-Mountmellick, Co. Laois
Work started for 44 homes: a commencement notice was lodged, so the permission is in use.
1.48 ha · 44 homes · Zoned Residential 2
Permission running out Ended Portlaoise, Co. Laois
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
30 m² · 55 homes · Zoned Residential 1 - Existing Residential
Permission expired Ended Portlaoise, Co. Laois
South of Dublin Road , Kilminchy , Portlaoise
30 m² · 36 homes · Zoned Residential 2
Permitted, not started Ended Portlaoise, Co. Laois
A c. 2.14 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road to the east by Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise ,
Work started for 45 homes: a commencement notice was lodged, so the permission is in use.
1.97 ha · 45 homes · Zoned Residential 2
Permitted, not started Ended Portlaoise, Co. Laois
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
820 m² · 17 homes · Zoned Residential 1 - Existing Residential
Permission expired Ended Portlaoise, Co. Laois
0.44 ha · 16 homes
Permission expired Ended Portlaoise, Co. Laois
1.39 ha · 48 homes · Zoned Residential 2
Permission running out Ended Borris-in-Ossory-Mountmellick, Co. Laois
Work started for 26 homes: a commencement notice was lodged, so the permission is in use.
1.25 ha · 26 homes · Zoned Residential 2
Permission running out Ended Portlaoise, Co. Laois
Work started for 19 homes: a commencement notice was lodged, so the permission is in use.
0.88 ha · 19 homes · Zoned Mixed Use
Permitted, not started Ended Portlaoise, Co. Laois
Land to SW of St. Mary's Christian Brothers School & The Nagle Rice Sports Complex and NW of Borris RoadBorris Great & Barony of Maryborough East , Portlaoise , Co. Laois
Work started for 23 homes: a commencement notice was lodged, so the permission is in use.
30 m² · 23 homes · Zoned Residential 2
Permission expired Ended Portlaoise, Co. Laois
4.56 ha · 121 homes · Zoned Residential 1 - Existing Residential
Permitted, not started Ended Co. Carlow
Work started for 32 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 32 homes · Zoned Town Centre
Permission running out Ended Tullow, Co. Carlow
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
1.05 ha · 10 homes · Zoned New Residential
Permission expired Ended Co. Longford
1.47 ha · 43 homes · Zoned Social/Community/Education/Public Utility
Permission running out Ended Portlaoise, Co. Laois
Work started for 68 homes: a commencement notice was lodged, so the permission is in use.
60 m² · 68 homes · Zoned Mixed Use
Permitted, not started Ended Portlaoise, Co. Laois
Work started for 94 homes: a commencement notice was lodged, so the permission is in use.
30 m² · 94 homes · Zoned Residential 2
Permission expired Ended Portlaoise, Co. Laois
10 m² · 16 homes
Permission expired Ended Graiguecullen-Portarlington, Co. Laois
The Quakers , Killeshin , Co. Laois
0.76 ha · 14 homes · Zoned Residential 1 - Existing Residential
Yesterday Permission expired Ended Co. Wicklow
0.53 ha · 18 homes · Zoned Existing Residential
Permission expired Ended Bray West, Co. Wicklow
6.16 ha · 12 homes · Zoned New Residential - R-Special
Permission expired Ended Ratoath, Co. Meath
80 m² · 10 homes · Zoned A2 · New Residential
Permission running out Ended Navan, Co. Meath
Work started for 48 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 48 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 24 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 34 homes · Zoned A2 · New Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 40 homes: a commencement notice was lodged, so the permission is in use.
0.94 ha · 40 homes · Zoned A2 · New Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 13 homes: a commencement notice was lodged, so the permission is in use.
0.30 ha · 13 homes · Zoned D1 · Tourism
Permission expired Ended Navan, Co. Meath
Lands situated to the west of the Dublin Road and Academy Street , Limekilnhill Navan County Meath , (including Belmont Lodge Dublin Road Navan County Meath C15 T2N8 and the Belmount House Entrance Gates
0.73 ha · 16 homes · Zoned A2 · New Residential
Permitted, not started Ended Navan, Co. Meath
Work started for 98 homes: a commencement notice was lodged, so the permission is in use.
0.53 ha · 98 homes · Zoned A2 · New Residential
Permission running out Ended Trim, Co. Meath
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.83 ha · 17 homes · Zoned A1 · Existing Residential
Permission running out Ended Trim, Co. Meath
Work started for 12 homes: a commencement notice was lodged, so the permission is in use.
0.54 ha · 12 homes · Zoned A2 · New Residential
Permission running out Ended Trim, Co. Meath
Work started for 13 homes: a commencement notice was lodged, so the permission is in use.
0.54 ha · 13 homes · Zoned A2 · New Residential
Permitted, not started Ended Trim, Co. Meath
Work started for 35 homes: a commencement notice was lodged, so the permission is in use.
1.51 ha · 35 homes · Zoned A1 · Existing Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 22 homes: a commencement notice was lodged, so the permission is in use.
0.30 ha · 22 homes · Zoned D1 · Tourism
Permitted, not started Ended Navan, Co. Meath
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 11 homes · Zoned RA · Rural Area
Permitted, not started Ended Navan, Co. Meath
Lands To The North Of Windtown/Proudstown Link Road , Clonmagadden , Navan Co. Meath
Work started for 59 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 59 homes · Zoned A2 · New Residential
Permitted, not started Ended Bray East, Co. Wicklow
Bray Head House (Protected Structure) and the former North Wicklow Educate Together , Secondary School (A98CK73) Putland Road and extending to Newcourt Road , Bray
Work started for 25 homes: a commencement notice was lodged, so the permission is in use.
2.27 ha · 25 homes · Zoned New Residential - R-HD
Permission expired Ended Trim, Co. Meath
80 m² · 12 homes · Zoned B1 · Commercial Town or Village Centre
Permitted, not started Ended Ashbourne, Co. Meath
Work started for 205 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 205 homes · Zoned E3 · Warehousing and Distribution
Permitted, not started Ended Bray East, Co. Wicklow
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
0.43 ha · 54 homes · Zoned Town Centre
Permitted, not started Ended Greystones, Co. Wicklow
Work started for 23 homes: a commencement notice was lodged, so the permission is in use.
23 homes · Zoned Existing Residential
Permission expired Ended Ashbourne, Co. Meath
80 m² · 11 homes · Zoned A1 · Existing Residential
Permission expired Ended Trim, Co. Meath
80 m² · 14 homes · Zoned B1 · Commercial Town or Village Centre
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 18 homes · Zoned A2 · New Residential
Permitted, not started Ended Navan, Co. Meath
Lands to the east of the Commons Road , in the townlands of Balreask Old Duffsland , and Commons Navan Co Meath
Work started for 27 homes: a commencement notice was lodged, so the permission is in use.
0.80 ha · 27 homes · Zoned A2 · New Residential
Permission running out Ended Kells, Co. Meath
Work started for 29 homes: a commencement notice was lodged, so the permission is in use.
0.83 ha · 29 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 36 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 18 homes · Zoned B1 · Commercial Town or Village Centre
Permission running out Ended Bray East, Co. Wicklow
former Bray Head Hotel , Strand Road , Bray
Work started for 49 homes: a commencement notice was lodged, so the permission is in use.
0.43 ha · 49 homes · Zoned Seafront
Permission expired Ended Co. Wicklow
0.97 ha · 15 homes · Zoned Secondary Development Area
Permission expired Ended Trim, Co. Meath
80 m² · 18 homes · Zoned A1 · Existing Residential
Permission expired Ended Swords, Fingal
0.82 ha · 154 homes · Zoned MRE · Metro and Rail Economic Corridor
Permission expired Ended Howth-Malahide, Fingal
5.72 ha · 96 homes · Zoned RV · Rural Village
Wed 14 Oct Permission expired Ended Baltinglass, Co. Wicklow
2.85 ha · 12 homes · Zoned Secondary Development Area
Sat 10 Oct Council selling land Ended Rush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed lease of land at St. Catherine's Estate to Rush Athletic Football Club”
Zoned TC · Town and District Centre
Council selling land Ended Rush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed disposal of land for the rectification of boundary at Rhencullen, Main Street, Lusk, Co. Dublin”
Zoned TC · Town and District Centre
Council selling land Ended Blanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Cappogue Industrial Estate, Ballycoolin Road, Dublin 15 to the National Transport Authority”
Zoned NSC · National Sports Campus
Tue 6 Oct Council selling land Ended Blanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Church Fields, Mulhuddart, Dublin 15, County Dublin, to GEM Construction Limited”
Zoned RD · Road
Sun 4 Oct Permitted, not started Ended Castleknock, Fingal
Work started for 175 homes: a commencement notice was lodged, so the permission is in use.
1.88 ha · 175 homes · Zoned RS · Residential
Wed 30 Sep Derelict site Ended Blanchardstown-Mulhuddart, Fingal
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Sun 27 Sep Stalled build Ended Swords, Fingal
Unit D, North Dublin Corporate Park, Swords, Dublin, K67 W5P7
“commenced 12 Sep 2018, no completion certificate, planned end Nov 2018”
0.26 ha · 7–20 homes · Zoned MRE · Metro and Rail Economic Corridor
Stalled build Ended Rush-Lusk, Fingal
Knockarlow South Shore Road, Rush, Dublin
“1 homes; commenced 05 Apr 2019, no completion certificate, planned end Nov 2019”
0.24 ha · 1 home · Zoned RS · Residential
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
10C Ballycoolin Road, Dublin, Fingal
“commenced 10 Feb 2023, no completion certificate, planned end May 2023”
1.20 ha · Zoned GE · General Employment
Stalled build Ended Balbriggan, Fingal
20 New Street, Skerries, Dublin
“1 homes; commenced 20 Dec 2018, no completion certificate, planned end Dec 2019”
200 m² · 1 home · Zoned TC · Town and District Centre
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
BALLYCOOLIN BUSINESS PARK, BALLYCOOLIN ROAD, Dublin, Dublin 15, D15 VNC4
“commenced 20 Nov 2018, no completion certificate, planned end Dec 2019”
5.62 ha · Zoned HT · High Technology
Stalled build Ended Balbriggan, Fingal
Rathmooney, Lusk, Fingal
“commenced 27 Sep 2022, no completion certificate, planned end Mar 2023”
2.54 ha · Zoned FP · Food Park
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Saint Margaret's Road, Harristown, Swords, Co Dublin, Dublin, K67 N6T7
“commenced 24 Feb 2020, no completion certificate, planned end May 2020”
3.67 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Hexagon Building, IDA Blanchardstown Business and Technology Park, Snugborough Road, Dublin, Fingal, D15 V978
“commenced 09 Jul 2021, no completion certificate, planned end Jan 2022”
Zoned HT · High Technology
Stalled build Ended Swords, Fingal
Hertz - Swords Business Park, Swords, Dublin, K67 X903
“commenced 23 Nov 2018, no completion certificate, planned end Jan 2019”
Zoned MRE · Metro and Rail Economic Corridor
Stalled build Ended Castleknock, Fingal
Diswellstown, Castleknock, Dublin 15
“12 homes; commenced 25 Sep 2017, no completion certificate, planned end Jul 2018”
1.31 ha · 12 homes · Zoned HA · High Amenity
Stalled build Ended Fingal
“commenced 25 Nov 2019, no completion certificate, planned end Jan 2020”
Stalled build Ended Castleknock, Fingal
Clonsilla Road, Clonsilla, Dublin 15
“33 homes; commenced 23 Mar 2017, no completion certificate, planned end Jul 2017”
1.04 ha · 33 homes · Zoned RS · Residential
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
claremount, Coolquoy Common, Fingal
“commenced 23 Jul 2020, no completion certificate, planned end Sep 2020”
1.00 ha · Zoned RU · Rural
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
“455 homes; commenced 24 Jul 2015, no completion certificate, planned end Jul 2016”
28.5 ha · 455 homes · Zoned RS · Residential
Stalled build Ended Rush-Lusk, Fingal
North Hill, Rush
“commenced 13 Apr 2020, no completion certificate, planned end May 2020”
2.26 ha · Zoned RU · Rural
Stalled build Ended Rush-Lusk, Fingal
“1 homes; commenced 08 Nov 2018, no completion certificate, planned end Nov 2019”
0.19 ha · 1 home · Zoned HA · High Amenity
Stalled build Ended Swords, Fingal
Malahide Road, Swords, Fingal, K67 YY15
“commenced 28 Feb 2022, no completion certificate, planned end Apr 2022”
6.83 ha · 191–546 homes · Zoned MC · Major Town Centre
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Unit D8, Horizon Logistics Park, Harristown, Swords, Co Dublin, Co Dublin, Fingal, K67 F5X6
“commenced 04 Jan 2022, no completion certificate, planned end Apr 2022”
3.39 ha · Zoned GE · General Employment
Stalled build Ended Castleknock, Fingal
“commenced 09 Jun 2022, no completion certificate, planned end Jul 2022”
Zoned MC · Major Town Centre
Stalled build Ended Rush-Lusk, Fingal
Brook Lane, Rush, Fingal
“commenced 28 Sep 2021, no completion certificate, planned end Sep 2022”
2.26 ha · Zoned RU · Rural
Stalled build Ended Rush-Lusk, Fingal
Corduff, Lusk, Fingal
“commenced 15 Sep 2022, no completion certificate, planned end Dec 2022”
3.09 ha · Zoned RU · Rural
Stalled build Ended Balbriggan, Fingal
Unit 8, Skerries Point Shopping Center, Kelly's Bay Parade, Skerries, Dublin, County Dublin
“commenced 02 Mar 2020, no completion certificate, planned end Jun 2020”
1.07 ha · 30–85 homes · Zoned LC · Local Centre
Stalled build Ended Castleknock, Fingal
“1 homes; commenced 13 Aug 2018, no completion certificate, planned end Nov 2018”
0 m² · 1 home · Zoned RS · Residential
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
4 Damastown Close, Dublin, Fingal
“commenced 20 Jul 2022, no completion certificate, planned end Jul 2023”
1.06 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Saint Margaret's Park, Dublin 11, Fingal
“commenced 08 Mar 2021, no completion certificate, planned end Jul 2022”
4.88 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Blanchardstown Road North, Blanchardstown, Dublin
“1 homes; commenced 28 Jan 2022, no completion certificate, planned end Jan 2023”
0.78 ha · 1 home · Zoned CI · Community Infrastructure
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
27 Northwood Avenue, Northwood, Dublin
“12 homes; commenced 12 Mar 2020, no completion certificate, planned end Jun 2021”
0.39 ha · 12 homes · Zoned MRE · Metro and Rail Economic Corridor
Stalled build Ended Rush-Lusk, Fingal
R132, Lusk, Dublin
“commenced 17 Dec 2018, no completion certificate, planned end Jul 2019”
3.89 ha · Zoned RB · Rural Business
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Saint Margaret's Road, Dublin 11, Fingal
“commenced 01 Feb 2021, no completion certificate, planned end Jun 2022”
4.88 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Unit 633 Northwest Logistics Park, Kilshane Avenue, Northwest Business Park, Dublin, Fingal, D15 NXP6
“commenced 16 Jun 2022, no completion certificate, planned end Oct 2022”
0.91 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Building 5, IBM Technology Campus, Dublin, Fingal, D15 HN66
“commenced 11 Jun 2021, no completion certificate, planned end Aug 2021”
Zoned HT · High Technology
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Saint Margaret's Road, Dublin, Fingal, D11 X3W7
“commenced 09 Oct 2020, no completion certificate, planned end Nov 2021”
Zoned GE · General Employment
Stalled build Ended Rush-Lusk, Fingal
Naul Road, Ballyboughal, Dublin
“25 homes; commenced 16 Nov 2017, no completion certificate, planned end Jan 2018”
25 homes · Zoned OS · Open Space
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
claremount, Coolquoy Common, Fingal
“commenced 05 Aug 2020, no completion certificate, planned end Sep 2020”
0.96 ha · Zoned RU · Rural
Stalled build Ended Swords, Fingal
Food Central, Roslin Food Park, Fingal, K67 V9F3
“commenced 31 Aug 2023, no completion certificate, planned end May 2024”
3.47 ha · Zoned FP · Food Park
Stalled build Ended Balbriggan, Fingal
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
1.23 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Dublin, Dublin 15, D15 W244
“commenced 06 Dec 2019, no completion certificate, planned end Mar 2020”
2.73 ha · Zoned GE · General Employment
Stalled build Ended Swords, Fingal
“commenced 15 Apr 2022, no completion certificate, planned end Jul 2022”
0.38 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Cedar Drive, Dublin Airport Logistics Park, Dublin, K67 YW68
“commenced 03 Nov 2022, no completion certificate, planned end Dec 2022”
2.37 ha · Zoned GE · General Employment
Stalled build Ended Rush-Lusk, Fingal
New Road, Donabate, Dublin
“1 homes; commenced 07 Jun 2019, no completion certificate, planned end Oct 2019”
5.17 ha · 1 home · Zoned RS · Residential
Stalled build Ended Howth-Malahide, Fingal
43 Bayside Square West, Dublin, Fingal
“commenced 17 Aug 2021, no completion certificate, planned end Nov 2021”
0.99 ha · 27–79 homes · Zoned LC · Local Centre
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
2 Stemple Exchange, Blanchardstown Corporate Park, Ballycoolin, Dublin, Fingal, D15 E4FN
“commenced 14 Aug 2023, no completion certificate, planned end Nov 2023”
1.34 ha · Zoned HT · High Technology
Stalled build Ended Fingal
27 Northwood Avenue, Northwood, Dublin 9
“20 homes; commenced 14 Feb 2020, no completion certificate, planned end Jun 2020”
20 homes
Stalled build Ended Rush-Lusk, Fingal
Potrane Demense, Portrane Demesne, K36 X275
“commenced 07 May 2020, no completion certificate, planned end May 2020”
Zoned HA · High Amenity
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
634 Northwest Business Park, Dublin, Fingal, D15 RPYO
“commenced 25 Jan 2023, no completion certificate, planned end Sep 2023”
0.88 ha · Zoned GE · General Employment
Stalled build Ended Castleknock, Fingal
6 Homeleigh, Dublin, D15 FHK4
“1 homes; commenced 27 Oct 2022, no completion certificate, planned end Mar 2023”
0.41 ha · 1 home · Zoned RS · Residential
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Unit 624, Northwest Business Park, Ballycoolin, Dublin 15, Dublin, Dublin 15, D15 ND71
“commenced 04 Jan 2019, no completion certificate, planned end Mar 2019”
2.71 ha · Zoned GE · General Employment
Stalled build Ended Balbriggan, Fingal
Stephenstown Industrial Estate, Balbriggan, Dublin
“commenced 04 Oct 2018, no completion certificate, planned end Dec 2018”
0.51 ha · Zoned GE · General Employment
Stalled build Ended Fingal
Unnamed Road, Portrane Co Dublin, Fingal, K36 WR67
“commenced 14 Sep 2020, no completion certificate, planned end Dec 2020”
Stalled build Ended Castleknock, Fingal
Grove Road, Dublin, Dublin 15, D15 W638
“commenced 11 Feb 2019, no completion certificate, planned end Apr 2019”
Zoned MC · Major Town Centre
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Saint Margaret's Road, Dublin 11, Fingal
“commenced 06 Apr 2021, no completion certificate, planned end Jul 2022”
4.88 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
“commenced 15 Nov 2020, no completion certificate, planned end Nov 2020”
20.3 ha · Zoned CI · Community Infrastructure
Stalled build Ended Rush-Lusk, Fingal
Biscuit Makers Factory, Ballyboughal, Dublin, A41 X903
“commenced 06 Aug 2018, no completion certificate, planned end Dec 2018”
0.52 ha · 14–41 homes · Zoned RV · Rural Village
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Rosemount Park Drive, Dublin, Fingal, D11 W998
“commenced 02 Jun 2021, no completion certificate, planned end Aug 2021”
Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
R135, Dunsoghly, Dublin 11
“commenced 28 Feb 2020, no completion certificate, planned end May 2020”
0.48 ha · Zoned GB · Green Belt
Stalled build Ended Balbriggan, Fingal
Rathmooney, Lusk, Fingal
“commenced 26 Jan 2023, no completion certificate, planned end Feb 2023”
Zoned FP · Food Park