Sat 3 Oct · 1 Permission expired Dundalk South, Co. Louth
Permission for 20 homes expired 3 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
100 m² · 20 homes · Zoned Existing Residential
Mon 28 Sep · 1 Permitted, not started Baltinglass, Co. Wicklow
Granted 28 Sept 2026 for 14 homes. No commencement notice yet; the permission runs to 27 Sept 2031.
Permitted but idle: the owner may want a builder or a buyer.
0.24 ha · 14 homes · Zoned New Residential
New development sites in Dublin, every Monday The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Ended lately (118) Permissions that started, sites off a register, notices closed Today Permitted, not started Ended Portlaoise, Co. Laois
A c. 4.15 Ha site at Summerhill , Portlaoise , Co. Laois
Work started for 74 homes: a commencement notice was lodged, so the permission is in use.
3.37 ha · 74 homes · Zoned Strategic Reserve
Permitted, not started Ended Borris-in-Ossory-Mountmellick, Co. Laois
Work started for 44 homes: a commencement notice was lodged, so the permission is in use.
1.48 ha · 44 homes · Zoned Residential 2
Permission running out Ended Portlaoise, Co. Laois
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
30 m² · 55 homes · Zoned Residential 1 - Existing Residential
Permission expired Ended Portlaoise, Co. Laois
South of Dublin Road , Kilminchy , Portlaoise
30 m² · 36 homes · Zoned Residential 2
Permitted, not started Ended Portlaoise, Co. Laois
A c. 2.14 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road to the east by Holy Family School Road and to the west and south by undeveloped agricultural lands. , Portlaoise ,
Work started for 45 homes: a commencement notice was lodged, so the permission is in use.
1.97 ha · 45 homes · Zoned Residential 2
Permitted, not started Ended Portlaoise, Co. Laois
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
820 m² · 17 homes · Zoned Residential 1 - Existing Residential
Permission expired Ended Portlaoise, Co. Laois
0.44 ha · 16 homes
Permission expired Ended Portlaoise, Co. Laois
1.39 ha · 48 homes · Zoned Residential 2
Permission running out Ended Borris-in-Ossory-Mountmellick, Co. Laois
Work started for 26 homes: a commencement notice was lodged, so the permission is in use.
1.25 ha · 26 homes · Zoned Residential 2
Permission running out Ended Portlaoise, Co. Laois
Work started for 19 homes: a commencement notice was lodged, so the permission is in use.
0.88 ha · 19 homes · Zoned Mixed Use
Permitted, not started Ended Portlaoise, Co. Laois
Land to SW of St. Mary's Christian Brothers School & The Nagle Rice Sports Complex and NW of Borris RoadBorris Great & Barony of Maryborough East , Portlaoise , Co. Laois
Work started for 23 homes: a commencement notice was lodged, so the permission is in use.
30 m² · 23 homes · Zoned Residential 2
Permitted, not started Ended Co. Kilkenny
Work started for 31 homes: a commencement notice was lodged, so the permission is in use.
2.17 ha · 31 homes · Zoned New Residential
Permitted, not started Ended Co. Kilkenny
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 11 homes · Zoned Existing Residential
Permission running out Ended Co. Kilkenny
Work started for 29 homes: a commencement notice was lodged, so the permission is in use.
1.29 ha · 29 homes · Zoned New Residential
Permission expired Ended Castlecomer, Co. Kilkenny
1.86 ha · 40 homes
Permission expired Ended Co. Kilkenny
500 m² · 12 homes · Zoned Existing Residential
Permitted, not started Ended Athlone, Co. Westmeath
Work started for 58 homes: a commencement notice was lodged, so the permission is in use.
2.04 ha · 58 homes · Zoned Proposed Residential
Permission running out Ended Mullingar, Co. Westmeath
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.17 ha · 17 homes · Zoned Established Residential
Permission expired Ended Portlaoise, Co. Laois
4.56 ha · 121 homes · Zoned Residential 1 - Existing Residential
Permitted, not started Ended Callan-Thomastown, Co. Kilkenny
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.48 ha · 11 homes · Zoned Existing Residential
Permission expired Ended Castlecomer, Co. Kilkenny
0.21 ha · 12 homes
Permission running out Ended Portlaoise, Co. Laois
Work started for 68 homes: a commencement notice was lodged, so the permission is in use.
60 m² · 68 homes · Zoned Mixed Use
Permitted, not started Ended Portlaoise, Co. Laois
Work started for 94 homes: a commencement notice was lodged, so the permission is in use.
30 m² · 94 homes · Zoned Residential 2
Permission expired Ended Portlaoise, Co. Laois
10 m² · 16 homes
Permission expired Ended Graiguecullen-Portarlington, Co. Laois
The Quakers , Killeshin , Co. Laois
0.76 ha · 14 homes · Zoned Residential 1 - Existing Residential
Yesterday Permitted, not started Ended Dundalk South, Co. Louth
Work started for 15 homes: a commencement notice was lodged, so the permission is in use.
0.29 ha · 15 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 31 homes: a commencement notice was lodged, so the permission is in use.
1.18 ha · 31 homes · Zoned New Residential Phase 1
Permitted, not started Ended Dundalk-Carlingford, Co. Louth
Work started for 25 homes: a commencement notice was lodged, so the permission is in use.
9.93 ha · 25 homes · Zoned New Residential Phase 1
Permission expired Ended Drogheda Rural, Co. Louth
0.57 ha · 40 homes · Zoned New Residential Phase 1
Permitted, not started Ended Dundalk South, Co. Louth
Work started for 65 homes: a commencement notice was lodged, so the permission is in use.
2.29 ha · 65 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Urban, Co. Louth
Bayview House (Protected Structure DB-301) and Bayview Cottage , Cromwell’s Lane & St. Mary’s Villas Lagavooren , Drogheda Co.Louth
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
0.63 ha · 54 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 54 homes · Zoned New Residential Phase 1
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 68 homes: a commencement notice was lodged, so the permission is in use.
3.03 ha · 68 homes · Zoned New Residential Phase 1
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 82 homes: a commencement notice was lodged, so the permission is in use.
3.75 ha · 82 homes · Zoned New Residential Phase 1
Permission running out Ended Dundalk South, Co. Louth
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.57 ha · 11 homes · Zoned Existing Residential
Permission expired Ended Ardee, Co. Louth
2.37 ha · 40 homes · Zoned New Residential Phase 1
Permission expired Ended Co. Wicklow
0.53 ha · 18 homes · Zoned Existing Residential
Permission expired Ended Bray West, Co. Wicklow
6.16 ha · 12 homes · Zoned New Residential - R-Special
Permitted, not started Ended Bray East, Co. Wicklow
Bray Head House (Protected Structure) and the former North Wicklow Educate Together , Secondary School (A98CK73) Putland Road and extending to Newcourt Road , Bray
Work started for 25 homes: a commencement notice was lodged, so the permission is in use.
2.27 ha · 25 homes · Zoned New Residential - R-HD
Permission expired Ended Dundalk South, Co. Louth
100 m² · 20 homes · Zoned Existing Residential
Permitted, not started Ended Dundalk South, Co. Louth
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
2.19 ha · 55 homes · Zoned Existing Residential
Permitted, not started Ended Bray East, Co. Wicklow
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
0.43 ha · 54 homes · Zoned Town Centre
Permitted, not started Ended Greystones, Co. Wicklow
Work started for 23 homes: a commencement notice was lodged, so the permission is in use.
23 homes · Zoned Existing Residential
Permission running out Ended Bray East, Co. Wicklow
former Bray Head Hotel , Strand Road , Bray
Work started for 49 homes: a commencement notice was lodged, so the permission is in use.
0.43 ha · 49 homes · Zoned Seafront
Permission expired Ended Co. Wicklow
0.97 ha · 15 homes · Zoned Secondary Development Area
Permission running out Ended Dundalk-Carlingford, Co. Louth
Work started for 93 homes: a commencement notice was lodged, so the permission is in use.
2.81 ha · 93 homes · Zoned New Residential Phase 1
Permission running out Ended Ardee, Co. Louth
Work started for 52 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 52 homes · Zoned New Residential Phase 1
Permission running out Ended Dundalk-Carlingford, Co. Louth
Work started for 19 homes: a commencement notice was lodged, so the permission is in use.
1.17 ha · 19 homes · Zoned New Residential Phase 1
Permission expired Ended Swords, Fingal
0.82 ha · 154 homes · Zoned MRE · Metro and Rail Economic Corridor
Permission expired Ended Howth-Malahide, Fingal
5.72 ha · 96 homes · Zoned RV · Rural Village
Permission expired Ended Firhouse-Bohernabreena, South Dublin
9.79 ha · 38 homes · Zoned RES · To protect and/or improve residential amenity
Wed 14 Oct Permission expired Ended Baltinglass, Co. Wicklow
2.85 ha · 12 homes · Zoned Secondary Development Area
Sun 11 Oct Permitted, not started Ended Clondalkin, South Dublin
Land adjacent to Drury Mills & Drury Park, Swiftbrook, Saggart, Co. Dublin
Work started for 73 homes: a commencement notice was lodged, so the permission is in use.
1.33 ha · 73 homes · Zoned RES · To protect and/or improve residential amenity
Sat 10 Oct Council selling land Ended Rush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed lease of land at St. Catherine's Estate to Rush Athletic Football Club”
Zoned TC · Town and District Centre
Council selling land Ended Rush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed disposal of land for the rectification of boundary at Rhencullen, Main Street, Lusk, Co. Dublin”
Zoned TC · Town and District Centre
Council selling land Ended Blanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Cappogue Industrial Estate, Ballycoolin Road, Dublin 15 to the National Transport Authority”
Zoned NSC · National Sports Campus
Tue 6 Oct Council selling land Ended Blanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Church Fields, Mulhuddart, Dublin 15, County Dublin, to GEM Construction Limited”
Zoned RD · Road
Sun 4 Oct Permitted, not started Ended Castleknock, Fingal
Work started for 175 homes: a commencement notice was lodged, so the permission is in use.
1.88 ha · 175 homes · Zoned RS · Residential
Wed 30 Sep Derelict site Ended Blanchardstown-Mulhuddart, Fingal
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Sun 27 Sep Stalled build Ended Clondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 12 Oct 2022, no completion certificate, planned end Jan 2023”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Firhouse-Bohernabreena, South Dublin
“commenced 18 Dec 2020, no completion certificate, planned end Jan 2021”
1.24 ha · 34–99 homes · Zoned DC · To protect, improve and provide for the future development of…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
St. James Road / Limekiln Green, Dublin, D12 A02K
“commenced 09 Jul 2018, no completion certificate, planned end Aug 2018”
0.80 ha · 22–64 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Orwell park, Dublin, D6W TF88
“commenced 04 Feb 2020, no completion certificate, planned end Dec 2020”
0.77 ha · 21–61 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Ballymount Road Lower, Dublin, South Dublin, D12 RW10
“commenced 14 Sep 2020, no completion certificate, planned end May 2022”
1.14 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
Pfizer Grange Castle, Grange Castle international Business Park, Dublin, South Dublin, D22 V8F8
“commenced 30 Nov 2020, no completion certificate, planned end Feb 2022”
35.7 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Lucan, South Dublin
Weston Airport,, Backweston Park, Leixlip, South Dublin, W23 XHF8
“commenced 21 Aug 2023, no completion certificate, planned end Mar 2024”
0.73 ha · Zoned RU · To protect and improve rural amenity and to provide for the…
Stalled build Ended Tallaght Central, South Dublin
SERLA HOUSE HIBERNIAN INDUSTRIAL ESTATE, Dublin, South Dublin, D24 NX22
“commenced 11 Nov 2020, no completion certificate, planned end Nov 2020”
690 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 18 Oct 2021, no completion certificate, planned end Mar 2022”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Lucan, South Dublin
Adamstown, Lucan, Dublin
“commenced 14 Aug 2019, no completion certificate, planned end Dec 2020”
1.07 ha · 29–85 homes · Zoned SDZ · To provide for strategic development in accordance with approved…
Stalled build Ended Clondalkin, South Dublin
Main Street, Newcastle, Dublin 22, D22
“40 homes; commenced 01 Jul 2019, no completion certificate, planned end Sep 2019”
1.75 ha · 40 homes
Stalled build Ended Tallaght South, South Dublin
3007 Lake Drive, Citywest Business Campus,, Dublin, South Dublin, D24 N2HR
“commenced 09 Mar 2021, no completion certificate, planned end May 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
74 Broadfield Avenue, Rathcoole, D24 PX01
“0 homes; commenced 14 Oct 2019, no completion certificate, planned end Oct 2019”
240 m² · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Unit 2A, Smurfit Packaging Systems, Ballymount Road Lower, Dublin, D12 KD80
“commenced 14 Sep 2022, no completion certificate, planned end Nov 2022”
0.13 ha · 3–10 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Palmerstown-Fonthill, South Dublin
Fonthill Road Lucan Co Dublin, Dublin, South Dublin, D22WC63
“commenced 22 Feb 2021, no completion certificate, planned end Mar 2021”
Zoned RW · To provide for and consolidate retail warehousing
Stalled build Ended Clondalkin, South Dublin
“1 homes; commenced 08 Nov 2022, no completion certificate, planned end Mar 2023”
730 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
JFK Avenue, Dublin, South Dublin, D12 NX74
“commenced 18 Jul 2022, no completion certificate, planned end Jul 2022”
0.50 ha · 13–39 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Clondalkin, South Dublin
New Nangor Road, Profile Park, South Dublin
“commenced 20 Apr 2023, no completion certificate, planned end Feb 2025”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
Monastery Road, Dublin, South Dublin, D22 F8F5
“commenced 07 Dec 2022, no completion certificate, planned end Feb 2023”
Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
2 Fonthill Park, Dublin
“1 homes; commenced 04 Jul 2018, no completion certificate, planned end Nov 2018”
320 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Clondalkin, South Dublin
Profile Park Business Park, New Nangor Road, Dublin 22, South Dublin
“commenced 04 Aug 2023, no completion certificate, planned end Nov 2024”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght South, South Dublin
2020 Bianconi Avenue, Dublin, Dublin 24, D24 T683
“commenced 10 Apr 2019, no completion certificate, planned end Apr 2019”
6.55 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
“commenced 21 Jul 2023, no completion certificate, planned end Sep 2023”
1.82 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght Central, South Dublin
“commenced 11 Nov 2022, no completion certificate, planned end Nov 2023”
Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Tallaght South, South Dublin
Kingswood Avenue, Dublin, South Dublin, D24 W1HP
“commenced 30 Nov 2020, no completion certificate, planned end Jul 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Palmerstown-Fonthill, South Dublin
Fonthill Road, Dublin, Dublin 22, D22 KP89
“commenced 21 Mar 2019, no completion certificate, planned end Jun 2019”
1.08 ha · Zoned MRC · To protect, improve and provide for the future development of a Major…
Stalled build Ended Clondalkin, South Dublin
Site partially bounded by Profile Park road on the east, north and west., Profile Park, South Dublin
“commenced 04 Apr 2023, no completion certificate, planned end Apr 2024”
0.67 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght South, South Dublin
2050 Orchard Avenue, Dublin, D24 WKP2
“commenced 15 Aug 2019, no completion certificate, planned end Oct 2019”
0.10 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended South Dublin
Roselawn, Ballydowd,, Lucan,, South Dublin
“commenced 15 Aug 2022, no completion certificate, planned end Nov 2022”
Stalled build Ended Clondalkin, South Dublin
Newlands Cross, Dublin 22, D22 W324
“commenced 12 Dec 2019, no completion certificate, planned end Dec 2019”
0.18 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Swords, Fingal
Unit D, North Dublin Corporate Park, Swords, Dublin, K67 W5P7
“commenced 12 Sep 2018, no completion certificate, planned end Nov 2018”
0.26 ha · 7–20 homes · Zoned MRE · Metro and Rail Economic Corridor
Stalled build Ended Rush-Lusk, Fingal
Knockarlow South Shore Road, Rush, Dublin
“1 homes; commenced 05 Apr 2019, no completion certificate, planned end Nov 2019”
0.24 ha · 1 home · Zoned RS · Residential
Stalled build Ended South Dublin
Ballymount Road Upper, Ballymount, Dublin, D12 VFEO
“commenced 13 Dec 2018, no completion certificate, planned end Dec 2019”
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
10C Ballycoolin Road, Dublin, Fingal
“commenced 10 Feb 2023, no completion certificate, planned end May 2023”
1.20 ha · Zoned GE · General Employment
Stalled build Ended Balbriggan, Fingal
20 New Street, Skerries, Dublin
“1 homes; commenced 20 Dec 2018, no completion certificate, planned end Dec 2019”
200 m² · 1 home · Zoned TC · Town and District Centre
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
BALLYCOOLIN BUSINESS PARK, BALLYCOOLIN ROAD, Dublin, Dublin 15, D15 VNC4
“commenced 20 Nov 2018, no completion certificate, planned end Dec 2019”
5.62 ha · Zoned HT · High Technology
Stalled build Ended Balbriggan, Fingal
Rathmooney, Lusk, Fingal
“commenced 27 Sep 2022, no completion certificate, planned end Mar 2023”
2.54 ha · Zoned FP · Food Park
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Saint Margaret's Road, Harristown, Swords, Co Dublin, Dublin, K67 N6T7
“commenced 24 Feb 2020, no completion certificate, planned end May 2020”
3.67 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Hexagon Building, IDA Blanchardstown Business and Technology Park, Snugborough Road, Dublin, Fingal, D15 V978
“commenced 09 Jul 2021, no completion certificate, planned end Jan 2022”
Zoned HT · High Technology
Stalled build Ended Swords, Fingal
Hertz - Swords Business Park, Swords, Dublin, K67 X903
“commenced 23 Nov 2018, no completion certificate, planned end Jan 2019”
Zoned MRE · Metro and Rail Economic Corridor
Stalled build Ended Castleknock, Fingal
Diswellstown, Castleknock, Dublin 15
“12 homes; commenced 25 Sep 2017, no completion certificate, planned end Jul 2018”
1.31 ha · 12 homes · Zoned HA · High Amenity
Stalled build Ended Fingal
“commenced 25 Nov 2019, no completion certificate, planned end Jan 2020”
Stalled build Ended Castleknock, Fingal
Clonsilla Road, Clonsilla, Dublin 15
“33 homes; commenced 23 Mar 2017, no completion certificate, planned end Jul 2017”
1.04 ha · 33 homes · Zoned RS · Residential
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
claremount, Coolquoy Common, Fingal
“commenced 23 Jul 2020, no completion certificate, planned end Sep 2020”
1.00 ha · Zoned RU · Rural
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
“455 homes; commenced 24 Jul 2015, no completion certificate, planned end Jul 2016”
28.5 ha · 455 homes · Zoned RS · Residential
Stalled build Ended Rush-Lusk, Fingal
North Hill, Rush
“commenced 13 Apr 2020, no completion certificate, planned end May 2020”
2.26 ha · Zoned RU · Rural
Stalled build Ended Rush-Lusk, Fingal
“1 homes; commenced 08 Nov 2018, no completion certificate, planned end Nov 2019”
0.19 ha · 1 home · Zoned HA · High Amenity
Stalled build Ended Swords, Fingal
Malahide Road, Swords, Fingal, K67 YY15
“commenced 28 Feb 2022, no completion certificate, planned end Apr 2022”
6.83 ha · 191–546 homes · Zoned MC · Major Town Centre
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Unit D8, Horizon Logistics Park, Harristown, Swords, Co Dublin, Co Dublin, Fingal, K67 F5X6
“commenced 04 Jan 2022, no completion certificate, planned end Apr 2022”
3.39 ha · Zoned GE · General Employment
Stalled build Ended Castleknock, Fingal
“commenced 09 Jun 2022, no completion certificate, planned end Jul 2022”
Zoned MC · Major Town Centre
Stalled build Ended Rush-Lusk, Fingal
Brook Lane, Rush, Fingal
“commenced 28 Sep 2021, no completion certificate, planned end Sep 2022”
2.26 ha · Zoned RU · Rural
Stalled build Ended Rush-Lusk, Fingal
Corduff, Lusk, Fingal
“commenced 15 Sep 2022, no completion certificate, planned end Dec 2022”
3.09 ha · Zoned RU · Rural
Stalled build Ended Balbriggan, Fingal
Unit 8, Skerries Point Shopping Center, Kelly's Bay Parade, Skerries, Dublin, County Dublin
“commenced 02 Mar 2020, no completion certificate, planned end Jun 2020”
1.07 ha · 30–85 homes · Zoned LC · Local Centre
Stalled build Ended Castleknock, Fingal
“1 homes; commenced 13 Aug 2018, no completion certificate, planned end Nov 2018”
0 m² · 1 home · Zoned RS · Residential
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
4 Damastown Close, Dublin, Fingal
“commenced 20 Jul 2022, no completion certificate, planned end Jul 2023”
1.06 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Saint Margaret's Park, Dublin 11, Fingal
“commenced 08 Mar 2021, no completion certificate, planned end Jul 2022”
4.88 ha · Zoned GE · General Employment
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Blanchardstown Road North, Blanchardstown, Dublin
“1 homes; commenced 28 Jan 2022, no completion certificate, planned end Jan 2023”
0.78 ha · 1 home · Zoned CI · Community Infrastructure
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
27 Northwood Avenue, Northwood, Dublin
“12 homes; commenced 12 Mar 2020, no completion certificate, planned end Jun 2021”
0.39 ha · 12 homes · Zoned MRE · Metro and Rail Economic Corridor
Stalled build Ended Rush-Lusk, Fingal
R132, Lusk, Dublin
“commenced 17 Dec 2018, no completion certificate, planned end Jul 2019”
3.89 ha · Zoned RB · Rural Business
Load more