Inspector recommendations are shown only where the inspector's report has been read and tagged; "not extracted" is not the same as "no recommendation". Sources: npad, 25 Sept 2026; acp, 25 Sept 2026; bcms, 24 Sept 2026
Deadlines running
Radius m
250
Count
0
Deadlines are computed once, by the connector that saw the event, from the statutory rule; never estimated here. Sources: acp, 25 Sept 2026; consult, 25 Sept 2026; moderngov, 24 Sept 2026; npad, 25 Sept 2026; rzlt, 18 Sept 2026
Similar schemes nearby
Base rate from past decisions nearby, not a prediction for this site
WEB2425/26: application received — (i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operatio
WEB2408/26: APPLICATION DECLARED INVALID — (i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operatio
WEB2408/26: application received — (i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operatio
WEB2379/26: APPLICATION DECLARED INVALID — (i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operatio
The main town centre — retail, offices, civic uses, apartments.
Objective text is quoted from the development plan as published on MyPlan (GZT). The plain-English line is our gloss. Sources: zoning, 19 Sept 2026; rzlt, 18 Sept 2026
Constraints
Available
Yes
Buffer m
50
Opw flood extent nearby
Yes
Opw flood map url
https://www.floodinfo.ie/map/floodmaps/
Kinds (3)
Kind
Label
Count
niah
NIAH-recorded building
1
More detail
On the market
Radius m
1,000
Years
3
All sales
Count
1,610
Median price
393,500
First sale
2023-09-25
Last sale
2026-09-18
New build
Count
18
Median price
396,330
Min price
294,273
Max price
64,368,821
Sales are from the Property Price Register (new dwellings, VAT-exclusive where flagged). Positions are geocoded from addresses, not surveyed. Source: ppr, 24 Sept 2026
Planning applications: as of 22 Sept 2026 — National planning feed (NPAD); descriptions are truncated at source and applicants are organisations only, where a council register publishes them.
Appeals: as of 18 Sept 2026
Permitted, not started: as of 19 Sept 2026 — Grants of 10+ homes since 2017; 'not started' means no matched commencement notice.
RZLT map: as of 11 Sept 2026 — Latest annual RZLT edition per council; parcels under 0.1 ha are left out.
Zoning: as of 11 Sept 2026 — Generalised zoning (MyPlan GZT) and council layers; Dublin councils only for now.
Council land disposals (s.183): as of 18 Sept 2026 — Only disposals the council minutes locate on a map are shown; the last three years.
Public land: as of 11 Sept 2026 — The LDA's register of relevant public land.
1-6 Beresford Street, Dublin 7, D7T611. The site is bounded by Cuckoo Lane to the north, George's Hill to the east, Marys Lane to the south and Beresford St…
16-17 Grand Canal Place, The Liberties, Dublin 8, D08 AY88
Base rate from past decisions nearby, not a prediction for this site. Small N means a wide range: treat anything under 10 decisions as anecdote. Sources: acp, 25 Sept 2026; npad, 25 Sept 2026
· 181 m
WEB2379/26: application received — (i) change of use of first-floor level office space to provide limited-term staff accommodation, related to the operatio
WEB6015/25: further information requested — Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Cou
WEB6015/25: ADDITIONAL INFORMATION — Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Cou
WEB5717/25: appealed to An Coimisiún Pleanála (PL-500773-DS-26) — The development will consist of a new 2.6m wide 'vehicular access' to provide one off street car parking space with new
WEB5717/25: REFUSE PERMISSION — The development will consist of a new 2.6m wide 'vehicular access' to provide one off street car parking space with new
WEB1042/26: application received — Planning permission is sought by Baskin Projects Limited for the amendment to Planning Ref No. 5400/22 for the previous
WEB1021/26: APPLICATION DECLARED INVALID — Planning permission is sought by Baskin Projects Limited for the amendment to Planning Ref No. 5400/22 for the previous
WEB1021/26: application received — Planning permission is sought by Baskin Projects Limited for the amendment to Planning Ref No. 5400/22 for the previous
WEB6101/25: APPLICATION DECLARED INVALID — Planning permission is sought by Baskin Projects Limited for the amendment to Planning Ref No. 5400/22 for the previous
WEB6101/25: application received — Planning permission is sought by Baskin Projects Limited for the amendment to Planning Ref No. 5400/22 for the previous
WEB6054/25: APPLICATION DECLARED INVALID — Planning permission is sought for the amendment to Planning Ref No. 5400/22 for the previous approved six storey 13 No.
WEB6054/25: application received — Planning permission is sought for the amendment to Planning Ref No. 5400/22 for the previous approved six storey 13 No.
WEB6015/25: application received — Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Cou
WEB5939/25: APPLICATION DECLARED INVALID — Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Cou
WEB5939/25: application received — Abbey Building Contractors Limited intend to apply for planning permission on lands located at the junction of Irwin Cou
WEB5717/25: application received — The development will consist of a new 2.6m wide 'vehicular access' to provide one off street car parking space with new
Events from council registers, the Commission, BCMS, council meetings and the RZLT maps, each with its source link. Open clocks computed with statutory periods (s.34, s.37, s.50 PDA 2000, s.251 Christmas disregard) or as published.
Corner site (known as Lawlor's Corner), at the junction of Summer Street South and Marrowbone Lane encompassing 72 Marrowbone Lane and 3 Summer Street South,…
Grants of 10+ homes. "Unbuilt" means no commencement notice has been matched; "lapsing" expires within a year. Sources: bcms, 24 Sept 2026; npad, 25 Sept 2026
South Central Area Matters 1. Housing Maintenance Report. 2. 2nd Notification under Part 8 Planning and Development Regulations 2001. Proposed redevelopment …
Available demand capacity at the nearest substations.
Water, wastewater and electricity verdicts are in the value section; check them with Uisce Éireann and ESB Networks (links) before relying on them. Sources: esbn, 11 Sept 2026; uisce.wastewater; uisce.water
Constraints: as of 11 Sept 2026 — OPW flood extents are licensed for internal use only: shown as a yes/no and a link to floodinfo.ie.
Transport stops: as of 18 Sept 2026 — NTA GTFS; rail, Luas and Metro stops used for distance to rail.
Listings: as of 11 Sept 2026 — Daft listings: on-market badge and agent business name only; never exported.
Sites: as of 25 Sept 2026 — Rebuilt nightly from the layers above.
Scores: as of 25 Sept 2026 — Rule score v0: signal weights x recency x size x zoning fit. Not a probability.
Planning applications: as of 30 Jul 2026 — The DCC feed has nothing received after 2026-07-30; newer applications may be missing.
Ownership: date unknown — We do not hold Land Registry ownership. Use the folio link-out on each site (a small fee applies).
Receiverships: date unknown — Not tracked yet.
Servicing (Uisce Éireann, ESB): date unknown — Capacity registers are licensed for internal use only; shown as link-outs.
Area covered: date unknown — The four Dublin councils (DCC, DLR, Fingal, SDCC).