Sun 4 Oct · 1 Permission expired South West Inner City, Dublin City
Permission for 27 homes expired 4 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
0.10 ha · 27 homes · Zoned Z15 · Community and Social Infrastructure
Wed 30 Sep · 2 Permitted, not started Ratoath, Co. Meath
Granted 30 Sept 2026 for 13 homes. No commencement notice yet; the permission runs to 6 Sept 2028.
Permitted but idle: the owner may want a builder or a buyer.
0.29 ha · 13 homes · Zoned D1 · Tourism
Derelict site Kimmage-Rathmines, Dublin City
On Dublin City Council's derelict sites register since 30 Sept 2026 (ref DS2385).
A 7% yearly charge presses the owner to sell or build.
1.10 ha · 30–87 homes · Zoned Z1 · Sustainable Residential Neighbourhoods
Also: On the RZLT map, no permission
New development sites in Dublin, every Monday The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Ended lately (117) Permissions that started, sites off a register, notices closed Today Permitted, not started Ended Co. Kilkenny
Work started for 31 homes: a commencement notice was lodged, so the permission is in use.
2.17 ha · 31 homes · Zoned New Residential
Permitted, not started Ended Co. Kilkenny
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 11 homes · Zoned Existing Residential
Permission running out Ended Co. Kilkenny
Work started for 29 homes: a commencement notice was lodged, so the permission is in use.
1.29 ha · 29 homes · Zoned New Residential
Permission expired Ended Castlecomer, Co. Kilkenny
1.86 ha · 40 homes
Permission expired Ended Co. Kilkenny
500 m² · 12 homes · Zoned Existing Residential
Permitted, not started Ended Athlone, Co. Westmeath
Work started for 58 homes: a commencement notice was lodged, so the permission is in use.
2.04 ha · 58 homes · Zoned Proposed Residential
Permission running out Ended Mullingar, Co. Westmeath
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.17 ha · 17 homes · Zoned Established Residential
Permitted, not started Ended Co. Carlow
Work started for 32 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 32 homes · Zoned Town Centre
Permission running out Ended Tullow, Co. Carlow
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
1.05 ha · 10 homes · Zoned New Residential
Permission expired Ended Co. Longford
1.47 ha · 43 homes · Zoned Social/Community/Education/Public Utility
Permitted, not started Ended Callan-Thomastown, Co. Kilkenny
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.48 ha · 11 homes · Zoned Existing Residential
Permission expired Ended Castlecomer, Co. Kilkenny
0.21 ha · 12 homes
Yesterday Permission expired Ended Ratoath, Co. Meath
80 m² · 10 homes · Zoned A2 · New Residential
Permission running out Ended Navan, Co. Meath
Work started for 48 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 48 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 24 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 34 homes · Zoned A2 · New Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 40 homes: a commencement notice was lodged, so the permission is in use.
0.94 ha · 40 homes · Zoned A2 · New Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 13 homes: a commencement notice was lodged, so the permission is in use.
0.30 ha · 13 homes · Zoned D1 · Tourism
Permission expired Ended Navan, Co. Meath
Lands situated to the west of the Dublin Road and Academy Street , Limekilnhill Navan County Meath , (including Belmont Lodge Dublin Road Navan County Meath C15 T2N8 and the Belmount House Entrance Gates
0.73 ha · 16 homes · Zoned A2 · New Residential
Permitted, not started Ended Navan, Co. Meath
Work started for 98 homes: a commencement notice was lodged, so the permission is in use.
0.53 ha · 98 homes · Zoned A2 · New Residential
Permission running out Ended Trim, Co. Meath
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.83 ha · 17 homes · Zoned A1 · Existing Residential
Permission running out Ended Trim, Co. Meath
Work started for 12 homes: a commencement notice was lodged, so the permission is in use.
0.54 ha · 12 homes · Zoned A2 · New Residential
Permission running out Ended Trim, Co. Meath
Work started for 13 homes: a commencement notice was lodged, so the permission is in use.
0.54 ha · 13 homes · Zoned A2 · New Residential
Permitted, not started Ended Trim, Co. Meath
Work started for 35 homes: a commencement notice was lodged, so the permission is in use.
1.51 ha · 35 homes · Zoned A1 · Existing Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 22 homes: a commencement notice was lodged, so the permission is in use.
0.30 ha · 22 homes · Zoned D1 · Tourism
Permitted, not started Ended Navan, Co. Meath
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 11 homes · Zoned RA · Rural Area
Permitted, not started Ended Maynooth, Co. Kildare
Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court , and north of Bawnogue Park residential development (current
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
4.90 ha · 55 homes
Permitted, not started Ended Leixlip, Co. Kildare
Work started for 243 homes: a commencement notice was lodged, so the permission is in use.
0.38 ha · 243 homes · Zoned Existing Residential / Infill
Permitted, not started Ended Clane, Co. Kildare
Work started for 14 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 14 homes
Permitted, not started Ended Co. Kildare
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
1.02 ha · 17 homes · Zoned General Development
Permitted, not started Ended Clane, Co. Kildare
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
0.27 ha · 10 homes · Zoned Town Centre
Permitted, not started Ended Co. Kildare
Work started for 87 homes: a commencement notice was lodged, so the permission is in use.
3.60 ha · 87 homes · Zoned New Residential
Permission running out Ended Naas, Co. Kildare
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.50 ha · 11 homes · Zoned Existing Residential / Infill
Permitted, not started Ended Navan, Co. Meath
Lands To The North Of Windtown/Proudstown Link Road , Clonmagadden , Navan Co. Meath
Work started for 59 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 59 homes · Zoned A2 · New Residential
Permission expired Ended Trim, Co. Meath
80 m² · 12 homes · Zoned B1 · Commercial Town or Village Centre
Permitted, not started Ended Ashbourne, Co. Meath
Work started for 205 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 205 homes · Zoned E3 · Warehousing and Distribution
Permitted, not started Ended Newbridge, Co. Kildare
Work started for 12 homes: a commencement notice was lodged, so the permission is in use.
780 m² · 12 homes
Permission expired Ended Ashbourne, Co. Meath
80 m² · 11 homes · Zoned A1 · Existing Residential
Permission expired Ended Trim, Co. Meath
80 m² · 14 homes · Zoned B1 · Commercial Town or Village Centre
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 18 homes · Zoned A2 · New Residential
Permitted, not started Ended Navan, Co. Meath
Lands to the east of the Commons Road , in the townlands of Balreask Old Duffsland , and Commons Navan Co Meath
Work started for 27 homes: a commencement notice was lodged, so the permission is in use.
0.80 ha · 27 homes · Zoned A2 · New Residential
Permission running out Ended Kells, Co. Meath
Work started for 29 homes: a commencement notice was lodged, so the permission is in use.
0.83 ha · 29 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 36 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 18 homes · Zoned B1 · Commercial Town or Village Centre
Permitted, not started Ended Naas, Co. Kildare
The Orchard , Oldtown Demesne , Sallins Road
Work started for 48 homes: a commencement notice was lodged, so the permission is in use.
0.14 ha · 48 homes · Zoned New Residential
Permission expired Ended Naas, Co. Kildare
2.69 ha · 58 homes · Zoned New Residential
Permitted, not started Ended Celbridge, Co. Kildare
Work started for 37 homes: a commencement notice was lodged, so the permission is in use.
2.72 ha · 37 homes
Permitted, not started Ended Co. Kildare
Work started for 14 homes: a commencement notice was lodged, so the permission is in use.
0.69 ha · 14 homes
Permission expired Ended Trim, Co. Meath
80 m² · 18 homes · Zoned A1 · Existing Residential
Permission expired Ended Clane, Co. Kildare
2.18 ha · 49 homes · Zoned Existing Residential / Infill
Permitted, not started Ended Maynooth, Co. Kildare
Site at Boycetown Kilcock Co. Kildare. The application site is located to the south of the R148 , east of the R158 north east of the M4 Junction 8 roundabout to the west of Boycetown Court and , north of Bawnogues Park residential development (curren
Work started for 95 homes: a commencement notice was lodged, so the permission is in use.
5.32 ha · 95 homes
Permitted, not started Ended Celbridge, Co. Kildare
Work started for 57 homes: a commencement notice was lodged, so the permission is in use.
2.13 ha · 57 homes
Permission running out Ended Pembroke, Dublin City
11, Home Villas, Donnybrook, Dublin 4
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
50 m² · 11 homes · Zoned Z1 · Sustainable Residential Neighbourhoods
Permission expired Ended Swords, Fingal
0.82 ha · 154 homes · Zoned MRE · Metro and Rail Economic Corridor
Permission expired Ended Howth-Malahide, Fingal
5.72 ha · 96 homes · Zoned RV · Rural Village
Permission expired Ended Firhouse-Bohernabreena, South Dublin
9.79 ha · 38 homes · Zoned RES · To protect and/or improve residential amenity
Sun 11 Oct Permitted, not started Ended Clondalkin, South Dublin
Land adjacent to Drury Mills & Drury Park, Swiftbrook, Saggart, Co. Dublin
Work started for 73 homes: a commencement notice was lodged, so the permission is in use.
1.33 ha · 73 homes · Zoned RES · To protect and/or improve residential amenity
Sat 10 Oct Council selling land Ended Kimmage-Rathmines, Dublin City
The council's disposal notice has closed.
“Report on proposed disposal of Fee Simple interest in 114 Sundrive Road.”
Zoned Z1 · Sustainable Residential Neighbourhoods
Council selling land Ended Rush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed lease of land at St. Catherine's Estate to Rush Athletic Football Club”
Zoned TC · Town and District Centre
Council selling land Ended Rush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed disposal of land for the rectification of boundary at Rhencullen, Main Street, Lusk, Co. Dublin”
Zoned TC · Town and District Centre
Council selling land Ended Blanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Cappogue Industrial Estate, Ballycoolin Road, Dublin 15 to the National Transport Authority”
Zoned NSC · National Sports Campus
Tue 6 Oct Council selling land Ended Blanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Church Fields, Mulhuddart, Dublin 15, County Dublin, to GEM Construction Limited”
Zoned RD · Road
Sun 4 Oct Permitted, not started Ended Castleknock, Fingal
Work started for 175 homes: a commencement notice was lodged, so the permission is in use.
1.88 ha · 175 homes · Zoned RS · Residential
Wed 30 Sep Derelict site Ended Blanchardstown-Mulhuddart, Fingal
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Sun 27 Sep Stalled build Ended Clondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 12 Oct 2022, no completion certificate, planned end Jan 2023”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Firhouse-Bohernabreena, South Dublin
“commenced 18 Dec 2020, no completion certificate, planned end Jan 2021”
1.24 ha · 34–99 homes · Zoned DC · To protect, improve and provide for the future development of…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
St. James Road / Limekiln Green, Dublin, D12 A02K
“commenced 09 Jul 2018, no completion certificate, planned end Aug 2018”
0.80 ha · 22–64 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Orwell park, Dublin, D6W TF88
“commenced 04 Feb 2020, no completion certificate, planned end Dec 2020”
0.77 ha · 21–61 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Ballymount Road Lower, Dublin, South Dublin, D12 RW10
“commenced 14 Sep 2020, no completion certificate, planned end May 2022”
1.14 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
Pfizer Grange Castle, Grange Castle international Business Park, Dublin, South Dublin, D22 V8F8
“commenced 30 Nov 2020, no completion certificate, planned end Feb 2022”
35.7 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Lucan, South Dublin
Weston Airport,, Backweston Park, Leixlip, South Dublin, W23 XHF8
“commenced 21 Aug 2023, no completion certificate, planned end Mar 2024”
0.73 ha · Zoned RU · To protect and improve rural amenity and to provide for the…
Stalled build Ended Tallaght Central, South Dublin
SERLA HOUSE HIBERNIAN INDUSTRIAL ESTATE, Dublin, South Dublin, D24 NX22
“commenced 11 Nov 2020, no completion certificate, planned end Nov 2020”
690 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 18 Oct 2021, no completion certificate, planned end Mar 2022”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Lucan, South Dublin
Adamstown, Lucan, Dublin
“commenced 14 Aug 2019, no completion certificate, planned end Dec 2020”
1.07 ha · 29–85 homes · Zoned SDZ · To provide for strategic development in accordance with approved…
Stalled build Ended Clondalkin, South Dublin
Main Street, Newcastle, Dublin 22, D22
“40 homes; commenced 01 Jul 2019, no completion certificate, planned end Sep 2019”
1.75 ha · 40 homes
Stalled build Ended Tallaght South, South Dublin
3007 Lake Drive, Citywest Business Campus,, Dublin, South Dublin, D24 N2HR
“commenced 09 Mar 2021, no completion certificate, planned end May 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
74 Broadfield Avenue, Rathcoole, D24 PX01
“0 homes; commenced 14 Oct 2019, no completion certificate, planned end Oct 2019”
240 m² · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Unit 2A, Smurfit Packaging Systems, Ballymount Road Lower, Dublin, D12 KD80
“commenced 14 Sep 2022, no completion certificate, planned end Nov 2022”
0.13 ha · 3–10 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Palmerstown-Fonthill, South Dublin
Fonthill Road Lucan Co Dublin, Dublin, South Dublin, D22WC63
“commenced 22 Feb 2021, no completion certificate, planned end Mar 2021”
Zoned RW · To provide for and consolidate retail warehousing
Stalled build Ended Clondalkin, South Dublin
“1 homes; commenced 08 Nov 2022, no completion certificate, planned end Mar 2023”
730 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
JFK Avenue, Dublin, South Dublin, D12 NX74
“commenced 18 Jul 2022, no completion certificate, planned end Jul 2022”
0.50 ha · 13–39 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Clondalkin, South Dublin
New Nangor Road, Profile Park, South Dublin
“commenced 20 Apr 2023, no completion certificate, planned end Feb 2025”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
Monastery Road, Dublin, South Dublin, D22 F8F5
“commenced 07 Dec 2022, no completion certificate, planned end Feb 2023”
Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
2 Fonthill Park, Dublin
“1 homes; commenced 04 Jul 2018, no completion certificate, planned end Nov 2018”
320 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Clondalkin, South Dublin
Profile Park Business Park, New Nangor Road, Dublin 22, South Dublin
“commenced 04 Aug 2023, no completion certificate, planned end Nov 2024”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght South, South Dublin
2020 Bianconi Avenue, Dublin, Dublin 24, D24 T683
“commenced 10 Apr 2019, no completion certificate, planned end Apr 2019”
6.55 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
“commenced 21 Jul 2023, no completion certificate, planned end Sep 2023”
1.82 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght Central, South Dublin
“commenced 11 Nov 2022, no completion certificate, planned end Nov 2023”
Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Tallaght South, South Dublin
Kingswood Avenue, Dublin, South Dublin, D24 W1HP
“commenced 30 Nov 2020, no completion certificate, planned end Jul 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Palmerstown-Fonthill, South Dublin
Fonthill Road, Dublin, Dublin 22, D22 KP89
“commenced 21 Mar 2019, no completion certificate, planned end Jun 2019”
1.08 ha · Zoned MRC · To protect, improve and provide for the future development of a Major…
Stalled build Ended Clondalkin, South Dublin
Site partially bounded by Profile Park road on the east, north and west., Profile Park, South Dublin
“commenced 04 Apr 2023, no completion certificate, planned end Apr 2024”
0.67 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght South, South Dublin
2050 Orchard Avenue, Dublin, D24 WKP2
“commenced 15 Aug 2019, no completion certificate, planned end Oct 2019”
0.10 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended South East Inner City, Dublin City
“commenced 12 Dec 2022, no completion certificate, planned end Apr 2023”
0.53 ha · Zoned Z6 · Employment/Enterprise
Stalled build Ended Pembroke, Dublin City
Waterloo Road, Dublin, Dublin 4, D04 T2R0
“1 homes; commenced 09 Jul 2020, no completion certificate, planned end Jul 2021”
250 m² · 1 home · Zoned Z2 · Residential Neighbourhoods (Conservation Areas)
Stalled build Ended South East Inner City, Dublin City
“commenced 20 Jul 2018, no completion certificate, planned end Dec 2018”
Zoned Z6 · Employment/Enterprise
Stalled build Ended South East Inner City, Dublin City
Block 2, Miesian Plaza, 59 Baggot Street Lower, Dublin 2, D02 HX46
“commenced 02 May 2023, no completion certificate, planned end Oct 2023”
Zoned Z6 · Employment/Enterprise
Stalled build Ended North Inner City, Dublin City
George's Dock, Dublin 1, D01 W3P9
“commenced 15 Jun 2022, no completion certificate, planned end Jul 2022”
100 m² · Zoned Z5 · City Centre
Stalled build Ended Pembroke, Dublin City
Merrion Road, Dublin, D04 X2K5
“commenced 23 Oct 2018, no completion certificate, planned end Apr 2019”
Zoned Z6 · Employment/Enterprise
Stalled build Ended South East Inner City, Dublin City
“commenced 14 Jan 2019, no completion certificate, planned end Apr 2019”
Zoned Z6 · Employment/Enterprise
Stalled build Ended South East Inner City, Dublin City
13-17 Dawson Street, Dublin 2, D02 TF98
“commenced 03 Jul 2018, no completion certificate, planned end Oct 2018”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
Ringsend Road, Dublin 4, D04 K7N3
“commenced 25 Oct 2019, no completion certificate, planned end Apr 2020”
Zoned Z6 · Employment/Enterprise
Stalled build Ended Cabra-Glasnevin, Dublin City
St Mary’s Hospital, Phoenix Park,, Chapelizod,, Dublin, D20 TY72
“commenced 24 Nov 2020, no completion certificate, planned end Dec 2020”
Zoned Z9 · Amenity/Open Space Lands/Green Network
Stalled build Ended North Inner City, Dublin City
“commenced 29 Mar 2022, no completion certificate, planned end Aug 2022”
850 m² · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended Pembroke, Dublin City
Merrion Road, Dublin, D04 T6F4
“commenced 06 Jul 2020, no completion certificate, planned end Jul 2021”
Zoned Z15 · Community and Social Infrastructure
Stalled build Ended North Inner City, Dublin City
“commenced 11 Feb 2022, no completion certificate, planned end May 2022”
0.37 ha · 10–29 homes · Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
7-9 Leinster Street South, Dublin, Dublin 2, D02 K104
“commenced 30 Sep 2020, no completion certificate, planned end Oct 2020”
980 m² · Zoned Z5 · City Centre
Stalled build Ended North Inner City, Dublin City
North King street, Dublin, D07 T882
“commenced 14 Dec 2018, no completion certificate, planned end Dec 2018”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
“commenced 28 Aug 2018, no completion certificate, planned end Oct 2018”
Zoned Z8 · Georgian Conservation Areas
Stalled build Ended Kimmage-Rathmines, Dublin City
Saint Agnes Avenue, Dublin, Dublin 12
“commenced 04 Apr 2022, no completion certificate, planned end Sep 2023”
1.64 ha · Zoned Z15 · Community and Social Infrastructure
Stalled build Ended Pembroke, Dublin City
Merrion Road, Dublin, Dublin 4, D04 NV02
“commenced 02 Sep 2019, no completion certificate, planned end Jun 2020”
0.43 ha · Zoned Z6 · Employment/Enterprise
Stalled build Ended Ballyfermot-Drimnagh, Dublin City
“commenced 11 Nov 2019, no completion certificate, planned end Jun 2020”
0.81 ha · 22–64 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended South East Inner City, Dublin City
“commenced 04 Jun 2019, no completion certificate, planned end Sep 2019”
Zoned Z5 · City Centre
Stalled build Ended North Inner City, Dublin City
“commenced 25 Oct 2021, no completion certificate, planned end Nov 2021”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended North Inner City, Dublin City
“commenced 09 Aug 2018, no completion certificate, planned end May 2019”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
“commenced 25 Jul 2019, no completion certificate, planned end Dec 2019”
0.43 ha · 12–34 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended South East Inner City, Dublin City
112 & 113 Grafton Street, Dublin, D02 XK16
“commenced 08 Mar 2019, no completion certificate, planned end Jun 2019”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
Peter Street, Dublin 8, D08 P46N
“commenced 12 Dec 2018, no completion certificate, planned end Mar 2019”
Zoned Z5 · City Centre