Sun 4 Oct · 1 Permission expired South West Inner City, Dublin City
Permission for 27 homes expired 4 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
0.10 ha · 27 homes · Zoned Z15 · Community and Social Infrastructure
Sat 3 Oct · 1 Permission expired Dundalk South, Co. Louth
Permission for 20 homes expired 3 Oct 2026 without a start.
100 m² · 20 homes · Zoned Existing Residential
Wed 30 Sep · 2 Permitted, not started Ratoath, Co. Meath
Granted 30 Sept 2026 for 13 homes. No commencement notice yet; the permission runs to 6 Sept 2028.
Permitted but idle: the owner may want a builder or a buyer.
0.29 ha · 13 homes · Zoned D1 · Tourism
Derelict site Kimmage-Rathmines, Dublin City
On Dublin City Council's derelict sites register since 30 Sept 2026 (ref DS2385).
A 7% yearly charge presses the owner to sell or build.
1.10 ha · 30–87 homes · Zoned Z1 · Sustainable Residential Neighbourhoods
Also: On the RZLT map, no permission
Mon 28 Sep · 1 Permitted, not started Baltinglass, Co. Wicklow
Granted 28 Sept 2026 for 14 homes. No commencement notice yet; the permission runs to 27 Sept 2031.
0.24 ha · 14 homes · Zoned New Residential
New development sites in Dublin, every Monday The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Ended lately (115) Permissions that started, sites off a register, notices closed Today Permitted, not started Ended Tullamore, Co. Offaly
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
0.36 ha · 10 homes · Zoned Existing Residential
Permission expired Ended Tullamore, Co. Offaly
0.74 ha · 18 homes · Zoned Existing Residential
Permitted, not started Ended Co. Kilkenny
Work started for 31 homes: a commencement notice was lodged, so the permission is in use.
2.17 ha · 31 homes · Zoned New Residential
Permitted, not started Ended Co. Kilkenny
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 11 homes · Zoned Existing Residential
Permission running out Ended Co. Kilkenny
Work started for 29 homes: a commencement notice was lodged, so the permission is in use.
1.29 ha · 29 homes · Zoned New Residential
Permission expired Ended Castlecomer, Co. Kilkenny
1.86 ha · 40 homes
Permission expired Ended Co. Kilkenny
500 m² · 12 homes · Zoned Existing Residential
Permitted, not started Ended Athlone, Co. Westmeath
Work started for 58 homes: a commencement notice was lodged, so the permission is in use.
2.04 ha · 58 homes · Zoned Proposed Residential
Permission running out Ended Mullingar, Co. Westmeath
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.17 ha · 17 homes · Zoned Established Residential
Permitted, not started Ended Tullamore, Co. Offaly
Work started for 78 homes: a commencement notice was lodged, so the permission is in use.
4.17 ha · 78 homes · Zoned New Residential
Permitted, not started Ended Co. Carlow
Work started for 32 homes: a commencement notice was lodged, so the permission is in use.
0.52 ha · 32 homes · Zoned Town Centre
Permission running out Ended Tullow, Co. Carlow
Work started for 10 homes: a commencement notice was lodged, so the permission is in use.
1.05 ha · 10 homes · Zoned New Residential
Permitted, not started Ended Birr, Co. Offaly
Work started for 58 homes: a commencement notice was lodged, so the permission is in use.
3.45 ha · 58 homes · Zoned New Residential
Permission expired Ended Co. Longford
1.47 ha · 43 homes · Zoned Social/Community/Education/Public Utility
Permitted, not started Ended Callan-Thomastown, Co. Kilkenny
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.48 ha · 11 homes · Zoned Existing Residential
Permission expired Ended Castlecomer, Co. Kilkenny
0.21 ha · 12 homes
Yesterday Permitted, not started Ended Dundalk South, Co. Louth
Work started for 15 homes: a commencement notice was lodged, so the permission is in use.
0.29 ha · 15 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 31 homes: a commencement notice was lodged, so the permission is in use.
1.18 ha · 31 homes · Zoned New Residential Phase 1
Permitted, not started Ended Dundalk-Carlingford, Co. Louth
Work started for 25 homes: a commencement notice was lodged, so the permission is in use.
9.93 ha · 25 homes · Zoned New Residential Phase 1
Permission expired Ended Drogheda Rural, Co. Louth
0.57 ha · 40 homes · Zoned New Residential Phase 1
Permitted, not started Ended Dundalk South, Co. Louth
Work started for 65 homes: a commencement notice was lodged, so the permission is in use.
2.29 ha · 65 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Urban, Co. Louth
Bayview House (Protected Structure DB-301) and Bayview Cottage , Cromwell’s Lane & St. Mary’s Villas Lagavooren , Drogheda Co.Louth
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
0.63 ha · 54 homes · Zoned Existing Residential
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 54 homes · Zoned New Residential Phase 1
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 68 homes: a commencement notice was lodged, so the permission is in use.
3.03 ha · 68 homes · Zoned New Residential Phase 1
Permitted, not started Ended Drogheda Rural, Co. Louth
Work started for 82 homes: a commencement notice was lodged, so the permission is in use.
3.75 ha · 82 homes · Zoned New Residential Phase 1
Permission running out Ended Dundalk South, Co. Louth
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
0.57 ha · 11 homes · Zoned Existing Residential
Permission expired Ended Ardee, Co. Louth
2.37 ha · 40 homes · Zoned New Residential Phase 1
Permission expired Ended Co. Wicklow
0.53 ha · 18 homes · Zoned Existing Residential
Permission expired Ended Bray West, Co. Wicklow
6.16 ha · 12 homes · Zoned New Residential - R-Special
Permission expired Ended Ratoath, Co. Meath
80 m² · 10 homes · Zoned A2 · New Residential
Permission running out Ended Navan, Co. Meath
Work started for 48 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 48 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 24 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 34 homes · Zoned A2 · New Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 40 homes: a commencement notice was lodged, so the permission is in use.
0.94 ha · 40 homes · Zoned A2 · New Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 13 homes: a commencement notice was lodged, so the permission is in use.
0.30 ha · 13 homes · Zoned D1 · Tourism
Permission expired Ended Navan, Co. Meath
Lands situated to the west of the Dublin Road and Academy Street , Limekilnhill Navan County Meath , (including Belmont Lodge Dublin Road Navan County Meath C15 T2N8 and the Belmount House Entrance Gates
0.73 ha · 16 homes · Zoned A2 · New Residential
Permitted, not started Ended Navan, Co. Meath
Work started for 98 homes: a commencement notice was lodged, so the permission is in use.
0.53 ha · 98 homes · Zoned A2 · New Residential
Permission running out Ended Trim, Co. Meath
Work started for 17 homes: a commencement notice was lodged, so the permission is in use.
0.83 ha · 17 homes · Zoned A1 · Existing Residential
Permission running out Ended Trim, Co. Meath
Work started for 12 homes: a commencement notice was lodged, so the permission is in use.
0.54 ha · 12 homes · Zoned A2 · New Residential
Permission running out Ended Trim, Co. Meath
Work started for 13 homes: a commencement notice was lodged, so the permission is in use.
0.54 ha · 13 homes · Zoned A2 · New Residential
Permitted, not started Ended Trim, Co. Meath
Work started for 35 homes: a commencement notice was lodged, so the permission is in use.
1.51 ha · 35 homes · Zoned A1 · Existing Residential
Permitted, not started Ended Ratoath, Co. Meath
Work started for 22 homes: a commencement notice was lodged, so the permission is in use.
0.30 ha · 22 homes · Zoned D1 · Tourism
Permitted, not started Ended Navan, Co. Meath
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 11 homes · Zoned RA · Rural Area
Permitted, not started Ended Navan, Co. Meath
Lands To The North Of Windtown/Proudstown Link Road , Clonmagadden , Navan Co. Meath
Work started for 59 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 59 homes · Zoned A2 · New Residential
Permitted, not started Ended Bray East, Co. Wicklow
Bray Head House (Protected Structure) and the former North Wicklow Educate Together , Secondary School (A98CK73) Putland Road and extending to Newcourt Road , Bray
Work started for 25 homes: a commencement notice was lodged, so the permission is in use.
2.27 ha · 25 homes · Zoned New Residential - R-HD
Permission expired Ended Trim, Co. Meath
80 m² · 12 homes · Zoned B1 · Commercial Town or Village Centre
Permitted, not started Ended Ashbourne, Co. Meath
Work started for 205 homes: a commencement notice was lodged, so the permission is in use.
80 m² · 205 homes · Zoned E3 · Warehousing and Distribution
Permission expired Ended Dundalk South, Co. Louth
100 m² · 20 homes · Zoned Existing Residential
Permitted, not started Ended Dundalk South, Co. Louth
Work started for 55 homes: a commencement notice was lodged, so the permission is in use.
2.19 ha · 55 homes · Zoned Existing Residential
Permitted, not started Ended Bray East, Co. Wicklow
Work started for 54 homes: a commencement notice was lodged, so the permission is in use.
0.43 ha · 54 homes · Zoned Town Centre
Permitted, not started Ended Greystones, Co. Wicklow
Work started for 23 homes: a commencement notice was lodged, so the permission is in use.
23 homes · Zoned Existing Residential
Permission expired Ended Ashbourne, Co. Meath
80 m² · 11 homes · Zoned A1 · Existing Residential
Permission expired Ended Trim, Co. Meath
80 m² · 14 homes · Zoned B1 · Commercial Town or Village Centre
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 18 homes · Zoned A2 · New Residential
Permitted, not started Ended Navan, Co. Meath
Lands to the east of the Commons Road , in the townlands of Balreask Old Duffsland , and Commons Navan Co Meath
Work started for 27 homes: a commencement notice was lodged, so the permission is in use.
0.80 ha · 27 homes · Zoned A2 · New Residential
Permission running out Ended Kells, Co. Meath
Work started for 29 homes: a commencement notice was lodged, so the permission is in use.
0.83 ha · 29 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 36 homes · Zoned A2 · New Residential
Permission expired Ended Laytown-Bettystown, Co. Meath
80 m² · 18 homes · Zoned B1 · Commercial Town or Village Centre
Permission running out Ended Bray East, Co. Wicklow
former Bray Head Hotel , Strand Road , Bray
Work started for 49 homes: a commencement notice was lodged, so the permission is in use.
0.43 ha · 49 homes · Zoned Seafront
Permission expired Ended Co. Wicklow
0.97 ha · 15 homes · Zoned Secondary Development Area
Permission running out Ended Dundalk-Carlingford, Co. Louth
Work started for 93 homes: a commencement notice was lodged, so the permission is in use.
2.81 ha · 93 homes · Zoned New Residential Phase 1
Permission running out Ended Ardee, Co. Louth
Work started for 52 homes: a commencement notice was lodged, so the permission is in use.
100 m² · 52 homes · Zoned New Residential Phase 1
Permission expired Ended Trim, Co. Meath
80 m² · 18 homes · Zoned A1 · Existing Residential
Permission running out Ended Dundalk-Carlingford, Co. Louth
Work started for 19 homes: a commencement notice was lodged, so the permission is in use.
1.17 ha · 19 homes · Zoned New Residential Phase 1
Permission running out Ended Pembroke, Dublin City
11, Home Villas, Donnybrook, Dublin 4
Work started for 11 homes: a commencement notice was lodged, so the permission is in use.
50 m² · 11 homes · Zoned Z1 · Sustainable Residential Neighbourhoods
Wed 14 Oct Permission expired Ended Baltinglass, Co. Wicklow
2.85 ha · 12 homes · Zoned Secondary Development Area
Sat 10 Oct Council selling land Ended Kimmage-Rathmines, Dublin City
The council's disposal notice has closed.
“Report on proposed disposal of Fee Simple interest in 114 Sundrive Road.”
Zoned Z1 · Sustainable Residential Neighbourhoods
Sun 27 Sep Stalled build Ended South East Inner City, Dublin City
“commenced 12 Dec 2022, no completion certificate, planned end Apr 2023”
0.53 ha · Zoned Z6 · Employment/Enterprise
Stalled build Ended Pembroke, Dublin City
Waterloo Road, Dublin, Dublin 4, D04 T2R0
“1 homes; commenced 09 Jul 2020, no completion certificate, planned end Jul 2021”
250 m² · 1 home · Zoned Z2 · Residential Neighbourhoods (Conservation Areas)
Stalled build Ended South East Inner City, Dublin City
“commenced 20 Jul 2018, no completion certificate, planned end Dec 2018”
Zoned Z6 · Employment/Enterprise
Stalled build Ended South East Inner City, Dublin City
Block 2, Miesian Plaza, 59 Baggot Street Lower, Dublin 2, D02 HX46
“commenced 02 May 2023, no completion certificate, planned end Oct 2023”
Zoned Z6 · Employment/Enterprise
Stalled build Ended North Inner City, Dublin City
George's Dock, Dublin 1, D01 W3P9
“commenced 15 Jun 2022, no completion certificate, planned end Jul 2022”
100 m² · Zoned Z5 · City Centre
Stalled build Ended Pembroke, Dublin City
Merrion Road, Dublin, D04 X2K5
“commenced 23 Oct 2018, no completion certificate, planned end Apr 2019”
Zoned Z6 · Employment/Enterprise
Stalled build Ended South East Inner City, Dublin City
“commenced 14 Jan 2019, no completion certificate, planned end Apr 2019”
Zoned Z6 · Employment/Enterprise
Stalled build Ended South East Inner City, Dublin City
13-17 Dawson Street, Dublin 2, D02 TF98
“commenced 03 Jul 2018, no completion certificate, planned end Oct 2018”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
Ringsend Road, Dublin 4, D04 K7N3
“commenced 25 Oct 2019, no completion certificate, planned end Apr 2020”
Zoned Z6 · Employment/Enterprise
Stalled build Ended Cabra-Glasnevin, Dublin City
St Mary’s Hospital, Phoenix Park,, Chapelizod,, Dublin, D20 TY72
“commenced 24 Nov 2020, no completion certificate, planned end Dec 2020”
Zoned Z9 · Amenity/Open Space Lands/Green Network
Stalled build Ended North Inner City, Dublin City
“commenced 29 Mar 2022, no completion certificate, planned end Aug 2022”
850 m² · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended Pembroke, Dublin City
Merrion Road, Dublin, D04 T6F4
“commenced 06 Jul 2020, no completion certificate, planned end Jul 2021”
Zoned Z15 · Community and Social Infrastructure
Stalled build Ended North Inner City, Dublin City
“commenced 11 Feb 2022, no completion certificate, planned end May 2022”
0.37 ha · 10–29 homes · Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
7-9 Leinster Street South, Dublin, Dublin 2, D02 K104
“commenced 30 Sep 2020, no completion certificate, planned end Oct 2020”
980 m² · Zoned Z5 · City Centre
Stalled build Ended North Inner City, Dublin City
North King street, Dublin, D07 T882
“commenced 14 Dec 2018, no completion certificate, planned end Dec 2018”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
“commenced 28 Aug 2018, no completion certificate, planned end Oct 2018”
Zoned Z8 · Georgian Conservation Areas
Stalled build Ended Kimmage-Rathmines, Dublin City
Saint Agnes Avenue, Dublin, Dublin 12
“commenced 04 Apr 2022, no completion certificate, planned end Sep 2023”
1.64 ha · Zoned Z15 · Community and Social Infrastructure
Stalled build Ended Pembroke, Dublin City
Merrion Road, Dublin, Dublin 4, D04 NV02
“commenced 02 Sep 2019, no completion certificate, planned end Jun 2020”
0.43 ha · Zoned Z6 · Employment/Enterprise
Stalled build Ended Ballyfermot-Drimnagh, Dublin City
“commenced 11 Nov 2019, no completion certificate, planned end Jun 2020”
0.81 ha · 22–64 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended South East Inner City, Dublin City
“commenced 04 Jun 2019, no completion certificate, planned end Sep 2019”
Zoned Z5 · City Centre
Stalled build Ended North Inner City, Dublin City
“commenced 25 Oct 2021, no completion certificate, planned end Nov 2021”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended North Inner City, Dublin City
“commenced 09 Aug 2018, no completion certificate, planned end May 2019”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
“commenced 25 Jul 2019, no completion certificate, planned end Dec 2019”
0.43 ha · 12–34 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended South East Inner City, Dublin City
112 & 113 Grafton Street, Dublin, D02 XK16
“commenced 08 Mar 2019, no completion certificate, planned end Jun 2019”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
Peter Street, Dublin 8, D08 P46N
“commenced 12 Dec 2018, no completion certificate, planned end Mar 2019”
Zoned Z5 · City Centre
Stalled build Ended North Inner City, Dublin City
Grangegorman Lower, Dublin, Dublin 7, D07 XT95
“commenced 03 Mar 2022, no completion certificate, planned end Oct 2022”
0.55 ha · 15–43 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended South East Inner City, Dublin City
69-71 Saint Stephen's Green, Dublin 2
“commenced 25 Jun 2018, no completion certificate, planned end Mar 2020”
Zoned Z8 · Georgian Conservation Areas
Stalled build Ended Donaghmede, Dublin City
Grange Road, Donaghmede, Dublin 13, D13 X966
“commenced 03 Apr 2018, no completion certificate, planned end Oct 2018”
Zoned Z4 · Key Urban Villages/Urban Villages
Stalled build Ended South East Inner City, Dublin City
“commenced 19 Mar 2019, no completion certificate, planned end May 2019”
0.14 ha · 3–11 homes · Zoned Z4 · Key Urban Villages/Urban Villages
Stalled build Ended South East Inner City, Dublin City
24-26 City Quay, Dublin, Dublin 2, D02 NY19
“commenced 24 Aug 2021, no completion certificate, planned end Dec 2021”
Zoned Z5 · City Centre
Stalled build Ended South West Inner City, Dublin City
“commenced 11 Jul 2023, no completion certificate, planned end Oct 2023”
Zoned Z1 · Sustainable Residential Neighbourhoods
Stalled build Ended South East Inner City, Dublin City
Stephen Court, 18-21 SAINT STEPHEN'S GREEN, Dublin, Dublin 2, D02 N960
“commenced 05 Oct 2019, no completion certificate, planned end Oct 2019”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
“commenced 11 Nov 2021, no completion certificate, planned end Nov 2021”
330 m² · Zoned Z5 · City Centre
Stalled build Ended Pembroke, Dublin City
“1 homes; commenced 24 Sep 2018, no completion certificate, planned end Mar 2019”
1 home · Zoned Z2 · Residential Neighbourhoods (Conservation Areas)
Stalled build Ended North Inner City, Dublin City
“commenced 30 Nov 2021, no completion certificate, planned end Apr 2022”
Zoned Z5 · City Centre
Stalled build Ended South East Inner City, Dublin City
18 Kevin Street Lower, Dublin, Dublin 8, D08 TKF7
“299 homes; commenced 23 Feb 2022, no completion certificate, planned end Feb 2023”
1.59 ha · 299 homes · Zoned Z5 · City Centre
Stalled build Ended South West Inner City, Dublin City
13-14 Newmarket, Dublin, Dublin 8, D08 KD91
“commenced 09 Dec 2021, no completion certificate, planned end Mar 2022”
0.24 ha · 6–19 homes · Zoned Z10 · Inner Suburban and inner City Sustainable Mixed-Uses
Stalled build Ended South East Inner City, Dublin City
Macken Street and Grand Canal Street Lower, Dublin, Dublin 2
“commenced 25 Jul 2022, no completion certificate, planned end Oct 2022”
0.14 ha · Zoned Z6 · Employment/Enterprise
Stalled build Ended North Inner City, Dublin City
Block 2, Dublin Landings, North Wall Quay, Dublin, none
“commenced 24 Jul 2018, no completion certificate, planned end Nov 2018”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended Kimmage-Rathmines, Dublin City
“0 homes; commenced 30 Mar 2018, no completion certificate, planned end Apr 2018”
Zoned Z4 · Key Urban Villages/Urban Villages
Stalled build Ended South East Inner City, Dublin City
“commenced 10 Oct 2022, no completion certificate, planned end Nov 2022”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended Ballymun-Finglas, Dublin City
North Road, Finglas, Dublin 11, D11 K6KP
“commenced 24 Mar 2023, no completion certificate, planned end Mar 2023”
Zoned Z6 · Employment/Enterprise
Stalled build Ended North Inner City, Dublin City
O'Connell Street, Dublin, Dublin 1, D01 H6K0
“commenced 31 May 2023, no completion certificate, planned end Nov 2023”
0.63 ha · 17–50 homes · Zoned Z5 · City Centre
Stalled build Ended North Inner City, Dublin City
Blackhall Place, Dublin, Dublin 7, D07 VY24
“commenced 15 Jul 2019, no completion certificate, planned end Aug 2019”
2.41 ha · Zoned Z9 · Amenity/Open Space Lands/Green Network
Stalled build Ended Pembroke, Dublin City
“commenced 21 Dec 2020, no completion certificate, planned end Feb 2021”
0.31 ha · Zoned Z6 · Employment/Enterprise
Stalled build Ended South East Inner City, Dublin City
“commenced 21 Jun 2018, no completion certificate, planned end Sep 2018”
Zoned Z5 · City Centre
Stalled build Ended North Inner City, Dublin City
Northbank House,Sheriff Street, Dublin, Dublin 1, D01 R8N0
“commenced 26 Jul 2023, no completion certificate, planned end Oct 2023”
0.38 ha · 10–30 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled build Ended South East Inner City, Dublin City
14 Sráid Haiste Íochtarach, Dublin, Dublin 2, D02 W773 & D02 CK83
“commenced 26 Aug 2019, no completion certificate, planned end Nov 2019”
160 m² · Zoned Z6 · Employment/Enterprise