Yesterday · 5 Permission running out 11 months left Naas, Co. Kildare
former Devoy Barracks , John Devoy Road , Naas
Permission for 219 homes granted 13 Oct 2022 runs out 12 Oct 2027, and building hasn't started.
An owner facing a lapse may sell, partner or extend.
4.16 ha · 219 homes · Zoned New Residential
Council selling land Blackrock, Dún Laoghaire-Rathdown
Dún Laoghaire-Rathdown Council gave notice it plans to sell or lease this land (12 Oct 2026).
“4.07. Proposed disposal of Council owned land at 169 Foxrock Close, Deansgrange, Dublin 18 - LD 2512”
Council land heading to a buyer or partner. Objections and offers go in now.
Council selling land Killiney-Shankill, Dún Laoghaire-Rathdown
Dún Laoghaire-Rathdown Council gave notice it plans to sell or lease this land (12 Oct 2026).
“4.06. Proposed disposal of a small area of Council owned land within Kilbogget Park, Cabinteely, Co. Dublin to ESB - LD2578”
Council selling land Glencullen-Sandyford, Dún Laoghaire-Rathdown
Dún Laoghaire-Rathdown Council gave notice it plans to sell or lease this land (12 Oct 2026).
“4.02. Proposed disposal of a small area of Council owned land along the Kilcross Road, Sandyford, Dublin 18 to ESB for the relocation and installation of a substation - LD2535”
Council selling land Dundrum, Dún Laoghaire-Rathdown
Dún Laoghaire-Rathdown Council gave notice it plans to sell or lease this land (12 Oct 2026).
“4.01. Proposed disposal of Council owned land at Saint Columbanus Road, Churchtown Lower, Dublin 14 to Gas Networks Ireland”
Zoned A · To provide residential development and improve residential amenity…
Sun 11 Oct · 4 Derelict site Arklow, Co. Wicklow
On Wicklow County Council's derelict sites register (ref DS/172).
A 7% yearly charge presses the owner to sell or build.
420 m² · Zoned Town Centre
Derelict site Arklow, Co. Wicklow
On Wicklow County Council's derelict sites register (ref DS/171).
60 m² · Zoned Town Centre
Derelict site Baltinglass, Co. Wicklow
On Wicklow County Council's derelict sites register (ref DS164).
740 m² · Zoned Employment
New development sites in Dublin, every Monday The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Derelict site Baltinglass, Co. Wicklow
On Wicklow County Council's derelict sites register (ref DS113).
670 m² · Zoned Town Centre
Sun 4 Oct · 1 Permission running out 11 months left Naas, Co. Kildare
Permission for 164 homes granted 5 Oct 2022 runs out 4 Oct 2027, and building hasn't started.
0.60 ha · 164 homes · Zoned New Residential
Wed 30 Sep · 1 Permitted, not started Mullingar, Co. Westmeath
Granted 30 Sept 2026 for 50 homes. No commencement notice yet; the permission runs to 30 Sept 2031.
Permitted but idle: the owner may want a builder or a buyer.
3.72 ha · 50 homes · Zoned Proposed Residential
Tue 29 Sep · 1 Permitted, not started Naas, Co. Kildare
Site at lands west of Naas Racecourse south of Dublin Road , north of Tipper Road and generally bounded by existing residential developments to the north south and west at Kings Court Kingsfurze Avenue The Woodlands and The Gallops , Kingsfurze
Granted 29 Sept 2026 for 213 homes. No commencement notice yet; the permission runs to 29 Sept 2031.
8.89 ha · 213 homes · Zoned New Residential
Mon 28 Sep · 1 Permitted, not started Baltinglass, Co. Wicklow
Granted 28 Sept 2026 for 14 homes. No commencement notice yet; the permission runs to 27 Sept 2031.
0.24 ha · 14 homes · Zoned New Residential
Ended lately (83) Permissions that started, sites off a register, notices closed Sun 11 Oct Permitted, not started Ended Clondalkin, South Dublin
Land adjacent to Drury Mills & Drury Park, Swiftbrook, Saggart, Co. Dublin
Work started for 73 homes: a commencement notice was lodged, so the permission is in use.
1.33 ha · 73 homes · Zoned RES · To protect and/or improve residential amenity
Permission expired Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
0.4939ha site at nos. 60 (Cois Cnoc), 61, 62 & 63 (Innisfree), Stepaside Lane, Stepaside, Dublin 18
0.50 ha · 29 homes · Zoned NC · To protect, provide for and-or improve mixed-use neighbourhood centre…
Sat 10 Oct Council selling land Ended Rush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed lease of land at St. Catherine's Estate to Rush Athletic Football Club”
Zoned TC · Town and District Centre
Council selling land Ended Rush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed disposal of land for the rectification of boundary at Rhencullen, Main Street, Lusk, Co. Dublin”
Zoned TC · Town and District Centre
Council selling land Ended Blanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Cappogue Industrial Estate, Ballycoolin Road, Dublin 15 to the National Transport Authority”
Zoned NSC · National Sports Campus
Tue 6 Oct Council selling land Ended Blanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Church Fields, Mulhuddart, Dublin 15, County Dublin, to GEM Construction Limited”
Zoned RD · Road
Sun 4 Oct Permitted, not started Ended Castleknock, Fingal
Work started for 175 homes: a commencement notice was lodged, so the permission is in use.
1.88 ha · 175 homes · Zoned RS · Residential
Wed 30 Sep Derelict site Ended Blanchardstown-Mulhuddart, Fingal
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Also: Council selling land
Also on 10 other sites
Derelict site Ended Swords, Fingal
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Also: Council selling land
Also on 10 other sites
Derelict site Ended Balbriggan, Fingal
Taken off Fingal Council's derelict sites register.
Zoned TC · Town and District Centre
Also: Council selling land
Also on 3 other sites
Derelict site Ended Howth-Malahide, Fingal
Taken off Fingal Council's derelict sites register.
16.4 ha · 460–1315 homes · Zoned RS · Residential
Also: On the RZLT map, no permission
Derelict site Ended Ballymun-Finglas, Fingal
Taken off Fingal Council's derelict sites register.
Also: Council selling land
Also on 1 other site
Sun 27 Sep Stalled build Ended Clondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 12 Oct 2022, no completion certificate, planned end Jan 2023”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Firhouse-Bohernabreena, South Dublin
“commenced 18 Dec 2020, no completion certificate, planned end Jan 2021”
1.24 ha · 34–99 homes · Zoned DC · To protect, improve and provide for the future development of…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
St. James Road / Limekiln Green, Dublin, D12 A02K
“commenced 09 Jul 2018, no completion certificate, planned end Aug 2018”
0.80 ha · 22–64 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Orwell park, Dublin, D6W TF88
“commenced 04 Feb 2020, no completion certificate, planned end Dec 2020”
0.77 ha · 21–61 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Ballymount Road Lower, Dublin, South Dublin, D12 RW10
“commenced 14 Sep 2020, no completion certificate, planned end May 2022”
1.14 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
Pfizer Grange Castle, Grange Castle international Business Park, Dublin, South Dublin, D22 V8F8
“commenced 30 Nov 2020, no completion certificate, planned end Feb 2022”
35.7 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Lucan, South Dublin
Weston Airport,, Backweston Park, Leixlip, South Dublin, W23 XHF8
“commenced 21 Aug 2023, no completion certificate, planned end Mar 2024”
0.73 ha · Zoned RU · To protect and improve rural amenity and to provide for the…
Stalled build Ended Tallaght Central, South Dublin
SERLA HOUSE HIBERNIAN INDUSTRIAL ESTATE, Dublin, South Dublin, D24 NX22
“commenced 11 Nov 2020, no completion certificate, planned end Nov 2020”
690 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 18 Oct 2021, no completion certificate, planned end Mar 2022”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Lucan, South Dublin
Adamstown, Lucan, Dublin
“commenced 14 Aug 2019, no completion certificate, planned end Dec 2020”
1.07 ha · 29–85 homes · Zoned SDZ · To provide for strategic development in accordance with approved…
Stalled build Ended Clondalkin, South Dublin
Main Street, Newcastle, Dublin 22, D22
“40 homes; commenced 01 Jul 2019, no completion certificate, planned end Sep 2019”
1.75 ha · 40 homes
Stalled build Ended Tallaght South, South Dublin
3007 Lake Drive, Citywest Business Campus,, Dublin, South Dublin, D24 N2HR
“commenced 09 Mar 2021, no completion certificate, planned end May 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
74 Broadfield Avenue, Rathcoole, D24 PX01
“0 homes; commenced 14 Oct 2019, no completion certificate, planned end Oct 2019”
240 m² · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
Unit 2A, Smurfit Packaging Systems, Ballymount Road Lower, Dublin, D12 KD80
“commenced 14 Sep 2022, no completion certificate, planned end Nov 2022”
0.13 ha · 3–10 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Palmerstown-Fonthill, South Dublin
Fonthill Road Lucan Co Dublin, Dublin, South Dublin, D22WC63
“commenced 22 Feb 2021, no completion certificate, planned end Mar 2021”
Zoned RW · To provide for and consolidate retail warehousing
Stalled build Ended Clondalkin, South Dublin
“1 homes; commenced 08 Nov 2022, no completion certificate, planned end Mar 2023”
730 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
JFK Avenue, Dublin, South Dublin, D12 NX74
“commenced 18 Jul 2022, no completion certificate, planned end Jul 2022”
0.50 ha · 13–39 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Clondalkin, South Dublin
New Nangor Road, Profile Park, South Dublin
“commenced 20 Apr 2023, no completion certificate, planned end Feb 2025”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
Monastery Road, Dublin, South Dublin, D22 F8F5
“commenced 07 Dec 2022, no completion certificate, planned end Feb 2023”
Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Rathfarnham-Templeogue, South Dublin
2 Fonthill Park, Dublin
“1 homes; commenced 04 Jul 2018, no completion certificate, planned end Nov 2018”
320 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled build Ended Clondalkin, South Dublin
Profile Park Business Park, New Nangor Road, Dublin 22, South Dublin
“commenced 04 Aug 2023, no completion certificate, planned end Nov 2024”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght South, South Dublin
2020 Bianconi Avenue, Dublin, Dublin 24, D24 T683
“commenced 10 Apr 2019, no completion certificate, planned end Apr 2019”
6.55 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Clondalkin, South Dublin
“commenced 21 Jul 2023, no completion certificate, planned end Sep 2023”
1.82 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght Central, South Dublin
“commenced 11 Nov 2022, no completion certificate, planned end Nov 2023”
Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled build Ended Tallaght South, South Dublin
Kingswood Avenue, Dublin, South Dublin, D24 W1HP
“commenced 30 Nov 2020, no completion certificate, planned end Jul 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Palmerstown-Fonthill, South Dublin
Fonthill Road, Dublin, Dublin 22, D22 KP89
“commenced 21 Mar 2019, no completion certificate, planned end Jun 2019”
1.08 ha · Zoned MRC · To protect, improve and provide for the future development of a Major…
Stalled build Ended Clondalkin, South Dublin
Site partially bounded by Profile Park road on the east, north and west., Profile Park, South Dublin
“commenced 04 Apr 2023, no completion certificate, planned end Apr 2024”
0.67 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Tallaght South, South Dublin
2050 Orchard Avenue, Dublin, D24 WKP2
“commenced 15 Aug 2019, no completion certificate, planned end Oct 2019”
0.10 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended South Dublin
Roselawn, Ballydowd,, Lucan,, South Dublin
“commenced 15 Aug 2022, no completion certificate, planned end Nov 2022”
Stalled build Ended Clondalkin, South Dublin
Newlands Cross, Dublin 22, D22 W324
“commenced 12 Dec 2019, no completion certificate, planned end Dec 2019”
0.18 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled build Ended Swords, Fingal
Unit D, North Dublin Corporate Park, Swords, Dublin, K67 W5P7
“commenced 12 Sep 2018, no completion certificate, planned end Nov 2018”
0.26 ha · 7–20 homes · Zoned MRE · Metro and Rail Economic Corridor
Stalled build Ended Rush-Lusk, Fingal
Knockarlow South Shore Road, Rush, Dublin
“1 homes; commenced 05 Apr 2019, no completion certificate, planned end Nov 2019”
0.24 ha · 1 home · Zoned RS · Residential
Stalled build Ended South Dublin
Ballymount Road Upper, Ballymount, Dublin, D12 VFEO
“commenced 13 Dec 2018, no completion certificate, planned end Dec 2019”
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
10C Ballycoolin Road, Dublin, Fingal
“commenced 10 Feb 2023, no completion certificate, planned end May 2023”
1.20 ha · Zoned GE · General Employment
Stalled build Ended Balbriggan, Fingal
20 New Street, Skerries, Dublin
“1 homes; commenced 20 Dec 2018, no completion certificate, planned end Dec 2019”
200 m² · 1 home · Zoned TC · Town and District Centre
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
BALLYCOOLIN BUSINESS PARK, BALLYCOOLIN ROAD, Dublin, Dublin 15, D15 VNC4
“commenced 20 Nov 2018, no completion certificate, planned end Dec 2019”
5.62 ha · Zoned HT · High Technology
Stalled build Ended Balbriggan, Fingal
Rathmooney, Lusk, Fingal
“commenced 27 Sep 2022, no completion certificate, planned end Mar 2023”
2.54 ha · Zoned FP · Food Park
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Saint Margaret's Road, Harristown, Swords, Co Dublin, Dublin, K67 N6T7
“commenced 24 Feb 2020, no completion certificate, planned end May 2020”
3.67 ha · Zoned GE · General Employment
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Frascati Road, Blackrock, Dublin, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 14 Aug 2023, no completion certificate, planned end Oct 2023”
0.15 ha · 4–12 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
92 Bracken Road, Dublin, Dún Laoghaire-Rathdown, D18 CY92
“commenced 24 Jul 2023, no completion certificate, planned end Sep 2023”
0.42 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
77 Furze Road, Dublin, Dún Laoghaire-Rathdown, D18 C3X5
“commenced 10 May 2022, no completion certificate, planned end Dec 2022”
0.70 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
“commenced 22 Mar 2023, no completion certificate, planned end May 2023”
0.47 ha
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
3 Arkle Road, Dublin, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 06 Mar 2023, no completion certificate, planned end May 2023”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
Pottery Road, Dublin, Dún Laoghaire-Rathdown, A96 F2A8
“commenced 25 Jan 2021, no completion certificate, planned end Jul 2021”
6.58 ha · Zoned E · To provide for economic development and employment
Stalled build Ended Stillorgan, Dún Laoghaire-Rathdown
Belfield Office Park, Beech Hill Rd,, Roebuck, Dublin 4, 8Q68 WH
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
0.28 ha · Zoned E · To provide for economic development and employment
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
MountainVIew, Central Park, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 26 Jul 2022, no completion certificate, planned end Sep 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Ballymoss Road, Dublin, Dún Laoghaire-Rathdown, D18 Y2C9
“commenced 08 Mar 2022, no completion certificate, planned end Jun 2022”
0.38 ha · 10–30 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 17 Dec 2021, no completion certificate, planned end Mar 2022”
Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
St. Patricks Boys' National School, Newgrange Rd, Blackrock, Dublin, Dublin, A94 FE02
“commenced 18 Jun 2020, no completion certificate, planned end Aug 2020”
2.68 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Stalled build Ended Blanchardstown-Mulhuddart, Fingal
Hexagon Building, IDA Blanchardstown Business and Technology Park, Snugborough Road, Dublin, Fingal, D15 V978
“commenced 09 Jul 2021, no completion certificate, planned end Jan 2022”
Zoned HT · High Technology
Stalled build Ended Dundrum, Dún Laoghaire-Rathdown
4 Dundrum Road, Dublin, Dún Laoghaire-Rathdown, D14 VX61
“commenced 15 Feb 2022, no completion certificate, planned end May 2022”
Zoned E · To provide for economic development and employment
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
CHERRYWOOD BUSINESS PARK, Dublin, South Dublin, D18 T3Y1
“commenced 26 Aug 2021, no completion certificate, planned end Dec 2021”
0.43 ha
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
Dun Laoghaire Industrial Estate, Pottery Rd, Dun Laoghaire, Co Dublin, Dublin, Dún Laoghaire-Rathdown, A96 KW29
“commenced 23 Aug 2020, no completion certificate, planned end Jan 2021”
1.33 ha · Zoned E · To provide for economic development and employment
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
1 Pottery Road, Dublin, Monaghan, D18 X2H4
“commenced 11 Jan 2019, no completion certificate, planned end May 2019”
0.34 ha · Zoned E · To provide for economic development and employment
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2022”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 26 Jan 2021, no completion certificate, planned end Jul 2021”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Swords, Fingal
Hertz - Swords Business Park, Swords, Dublin, K67 X903
“commenced 23 Nov 2018, no completion certificate, planned end Jan 2019”
Zoned MRE · Metro and Rail Economic Corridor
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 10 Aug 2020, no completion certificate, planned end Dec 2020”
1.96 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Building 11, Cherrywood Business Park, Dublin, Dún Laoghaire-Rathdown, D18 DH50
“commenced 02 Dec 2020, no completion certificate, planned end May 2021”
0.51 ha
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
7 ST. HELEN'S VILLAS, ROCK ROAD, BOOTERSTOWN, CO. DUBLIN, Dublin, A94 H3F9
“1 homes; commenced 13 Sep 2018, no completion certificate, planned end Mar 2019”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Blackthorn Road,, Dublin, D18 F5X2
“commenced 07 Aug 2019, no completion certificate, planned end Dec 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Mountain View, Central Park, Dublin, D18 XN97
“commenced 01 May 2019, no completion certificate, planned end Jul 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
BLACKTHORN ROAD, Dublin 18,SANDYFORD INDUSTRIAL ESTATE, D18 F5X2
“commenced 10 Apr 2019, no completion certificate, planned end Jul 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled build Ended Dún Laoghaire, Dún Laoghaire-Rathdown
Barnhill Road, Dublin
“1 homes; commenced 03 Apr 2019, no completion certificate, planned end Oct 2019”
0.20 ha · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Killiney-Shankill, Dún Laoghaire-Rathdown
Cherrywood Park, Dublin, D18 DH50
“commenced 18 Mar 2019, no completion certificate, planned end Jun 2019”
0.51 ha
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
South County Business Park, Leopardstown, Dublin, Dublin, D18 DH6K
“commenced 23 Nov 2018, no completion certificate, planned end Dec 2019”
Zoned OE · To provide for office and enterprise development
Stalled build Ended Blackrock, Dún Laoghaire-Rathdown
Ardagh Drive, Dublin, A94 EW97
“1 homes; commenced 19 Nov 2018, no completion certificate, planned end May 2019”
580 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled build Ended Glencullen-Sandyford, Dún Laoghaire-Rathdown
Mountain View, Central Park, Dublin, D18XN97
“commenced 18 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled build Ended Castleknock, Fingal
Diswellstown, Castleknock, Dublin 15
“12 homes; commenced 25 Sep 2017, no completion certificate, planned end Jul 2018”
1.31 ha · 12 homes · Zoned HA · High Amenity
Stalled build Ended Fingal
“commenced 25 Nov 2019, no completion certificate, planned end Jan 2020”
Stalled build Ended Castleknock, Fingal
Clonsilla Road, Clonsilla, Dublin 15
“33 homes; commenced 23 Mar 2017, no completion certificate, planned end Jul 2017”
1.04 ha · 33 homes · Zoned RS · Residential
Load more