Wed 30 Sep · 1
Permitted, not startedMullingar, Co. Westmeath
Granted 30 Sept 2026 for 50 homes. No commencement notice yet; the permission runs to 30 Sept 2031.
Permitted but idle: the owner may want a builder or a buyer.
3.72 ha · 50 homes · Zoned Proposed Residential
Mon 28 Sep · 2
Permitted, not startedBaltinglass, Co. Wicklow
Granted 28 Sept 2026 for 14 homes. No commencement notice yet; the permission runs to 27 Sept 2031.
0.24 ha · 14 homes · Zoned New Residential
Permitted, not startedDrogheda Rural, Co. Louth
Granted 28 Sept 2026 for 97 homes. No commencement notice yet; the permission runs to 27 Sept 2031.
4.28 ha · 97 homes · Zoned New Residential Phase 1
New development sites in Dublin, every Monday
The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Ended lately (117)Permissions that started, sites off a register, notices closed
Yesterday
Permitted, not startedEndedDrogheda Urban, Co. Louth
Work started for 28 homes: a commencement notice was lodged, so the permission is in use.
0.56 ha · 28 homes · Zoned New Residential Phase 1
Also:Permission running out
Sun 11 Oct
Permitted, not startedEndedClondalkin, South Dublin
Land adjacent to Drury Mills & Drury Park, Swiftbrook, Saggart, Co. Dublin
Work started for 73 homes: a commencement notice was lodged, so the permission is in use.
1.33 ha · 73 homes · Zoned RES · To protect and/or improve residential amenity
Sun 27 Sep
Stalled buildEndedClondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 12 Oct 2022, no completion certificate, planned end Jan 2023”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedFirhouse-Bohernabreena, South Dublin
“commenced 18 Dec 2020, no completion certificate, planned end Jan 2021”
1.24 ha · 34–99 homes · Zoned DC · To protect, improve and provide for the future development of…
Stalled buildEndedRathfarnham-Templeogue, South Dublin
St. James Road / Limekiln Green, Dublin, D12 A02K
“commenced 09 Jul 2018, no completion certificate, planned end Aug 2018”
0.80 ha · 22–64 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled buildEndedRathfarnham-Templeogue, South Dublin
Orwell park, Dublin, D6W TF88
“commenced 04 Feb 2020, no completion certificate, planned end Dec 2020”
0.77 ha · 21–61 homes · Zoned LC · To protect, improve and provide for the future development of Local…
Stalled buildEndedRathfarnham-Templeogue, South Dublin
Ballymount Road Lower, Dublin, South Dublin, D12 RW10
“commenced 14 Sep 2020, no completion certificate, planned end May 2022”
1.14 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedClondalkin, South Dublin
Pfizer Grange Castle, Grange Castle international Business Park, Dublin, South Dublin, D22 V8F8
“commenced 30 Nov 2020, no completion certificate, planned end Feb 2022”
35.7 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedLucan, South Dublin
Weston Airport,, Backweston Park, Leixlip, South Dublin, W23 XHF8
“commenced 21 Aug 2023, no completion certificate, planned end Mar 2024”
0.73 ha · Zoned RU · To protect and improve rural amenity and to provide for the…
Stalled buildEndedTallaght Central, South Dublin
SERLA HOUSE HIBERNIAN INDUSTRIAL ESTATE, Dublin, South Dublin, D24 NX22
“commenced 11 Nov 2020, no completion certificate, planned end Nov 2020”
690 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedClondalkin, South Dublin
South Dublin, D24 DH9Y
“commenced 18 Oct 2021, no completion certificate, planned end Mar 2022”
3.26 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedLucan, South Dublin
Adamstown, Lucan, Dublin
“commenced 14 Aug 2019, no completion certificate, planned end Dec 2020”
1.07 ha · 29–85 homes · Zoned SDZ · To provide for strategic development in accordance with approved…
Stalled buildEndedClondalkin, South Dublin
Main Street, Newcastle, Dublin 22, D22
“40 homes; commenced 01 Jul 2019, no completion certificate, planned end Sep 2019”
1.75 ha · 40 homes
Stalled buildEndedTallaght South, South Dublin
3007 Lake Drive, Citywest Business Campus,, Dublin, South Dublin, D24 N2HR
“commenced 09 Mar 2021, no completion certificate, planned end May 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedClondalkin, South Dublin
74 Broadfield Avenue, Rathcoole, D24 PX01
“0 homes; commenced 14 Oct 2019, no completion certificate, planned end Oct 2019”
240 m² · Zoned RES · To protect and/or improve residential amenity
Stalled buildEndedRathfarnham-Templeogue, South Dublin
Unit 2A, Smurfit Packaging Systems, Ballymount Road Lower, Dublin, D12 KD80
“commenced 14 Sep 2022, no completion certificate, planned end Nov 2022”
0.13 ha · 3–10 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled buildEndedPalmerstown-Fonthill, South Dublin
Fonthill Road Lucan Co Dublin, Dublin, South Dublin, D22WC63
“commenced 22 Feb 2021, no completion certificate, planned end Mar 2021”
Zoned RW · To provide for and consolidate retail warehousing
Stalled buildEndedClondalkin, South Dublin
“1 homes; commenced 08 Nov 2022, no completion certificate, planned end Mar 2023”
730 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled buildEndedRathfarnham-Templeogue, South Dublin
JFK Avenue, Dublin, South Dublin, D12 NX74
“commenced 18 Jul 2022, no completion certificate, planned end Jul 2022”
0.50 ha · 13–39 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled buildEndedClondalkin, South Dublin
New Nangor Road, Profile Park, South Dublin
“commenced 20 Apr 2023, no completion certificate, planned end Feb 2025”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedClondalkin, South Dublin
Monastery Road, Dublin, South Dublin, D22 F8F5
“commenced 07 Dec 2022, no completion certificate, planned end Feb 2023”
Zoned RES · To protect and/or improve residential amenity
Stalled buildEndedRathfarnham-Templeogue, South Dublin
2 Fonthill Park, Dublin
“1 homes; commenced 04 Jul 2018, no completion certificate, planned end Nov 2018”
320 m² · 1 home · Zoned RES · To protect and/or improve residential amenity
Stalled buildEndedClondalkin, South Dublin
Profile Park Business Park, New Nangor Road, Dublin 22, South Dublin
“commenced 04 Aug 2023, no completion certificate, planned end Nov 2024”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedTallaght South, South Dublin
2020 Bianconi Avenue, Dublin, Dublin 24, D24 T683
“commenced 10 Apr 2019, no completion certificate, planned end Apr 2019”
6.55 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedClondalkin, South Dublin
“commenced 21 Jul 2023, no completion certificate, planned end Sep 2023”
1.82 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedTallaght Central, South Dublin
“commenced 11 Nov 2022, no completion certificate, planned end Nov 2023”
Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled buildEndedTallaght South, South Dublin
Kingswood Avenue, Dublin, South Dublin, D24 W1HP
“commenced 30 Nov 2020, no completion certificate, planned end Jul 2021”
120 m² · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedPalmerstown-Fonthill, South Dublin
Fonthill Road, Dublin, Dublin 22, D22 KP89
“commenced 21 Mar 2019, no completion certificate, planned end Jun 2019”
1.08 ha · Zoned MRC · To protect, improve and provide for the future development of a Major…
Stalled buildEndedClondalkin, South Dublin
Site partially bounded by Profile Park road on the east, north and west., Profile Park, South Dublin
“commenced 04 Apr 2023, no completion certificate, planned end Apr 2024”
0.67 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedTallaght South, South Dublin
2050 Orchard Avenue, Dublin, D24 WKP2
“commenced 15 Aug 2019, no completion certificate, planned end Oct 2019”
0.10 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedSouth Dublin
Roselawn, Ballydowd,, Lucan,, South Dublin
“commenced 15 Aug 2022, no completion certificate, planned end Nov 2022”
Stalled buildEndedClondalkin, South Dublin
Newlands Cross, Dublin 22, D22 W324
“commenced 12 Dec 2019, no completion certificate, planned end Dec 2019”
0.18 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedSouth Dublin
Ballymount Road Upper, Ballymount, Dublin, D12 VFEO
“commenced 13 Dec 2018, no completion certificate, planned end Dec 2019”
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Frascati Road, Blackrock, Dublin, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 14 Aug 2023, no completion certificate, planned end Oct 2023”
0.15 ha · 4–12 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
92 Bracken Road, Dublin, Dún Laoghaire-Rathdown, D18 CY92
“commenced 24 Jul 2023, no completion certificate, planned end Sep 2023”
0.42 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
77 Furze Road, Dublin, Dún Laoghaire-Rathdown, D18 C3X5
“commenced 10 May 2022, no completion certificate, planned end Dec 2022”
0.70 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
“commenced 22 Mar 2023, no completion certificate, planned end May 2023”
0.47 ha
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
3 Arkle Road, Dublin, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 06 Mar 2023, no completion certificate, planned end May 2023”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Pottery Road, Dublin, Dún Laoghaire-Rathdown, A96 F2A8
“commenced 25 Jan 2021, no completion certificate, planned end Jul 2021”
6.58 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Belfield Office Park, Beech Hill Rd,, Roebuck, Dublin 4, 8Q68 WH
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
0.28 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
MountainVIew, Central Park, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 26 Jul 2022, no completion certificate, planned end Sep 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Ballymoss Road, Dublin, Dún Laoghaire-Rathdown, D18 Y2C9
“commenced 08 Mar 2022, no completion certificate, planned end Jun 2022”
0.38 ha · 10–30 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 17 Dec 2021, no completion certificate, planned end Mar 2022”
Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
St. Patricks Boys' National School, Newgrange Rd, Blackrock, Dublin, Dublin, A94 FE02
“commenced 18 Jun 2020, no completion certificate, planned end Aug 2020”
2.68 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
4 Dundrum Road, Dublin, Dún Laoghaire-Rathdown, D14 VX61
“commenced 15 Feb 2022, no completion certificate, planned end May 2022”
Zoned E · To provide for economic development and employment
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
CHERRYWOOD BUSINESS PARK, Dublin, South Dublin, D18 T3Y1
“commenced 26 Aug 2021, no completion certificate, planned end Dec 2021”
0.43 ha
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Dun Laoghaire Industrial Estate, Pottery Rd, Dun Laoghaire, Co Dublin, Dublin, Dún Laoghaire-Rathdown, A96 KW29
“commenced 23 Aug 2020, no completion certificate, planned end Jan 2021”
1.33 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
1 Pottery Road, Dublin, Monaghan, D18 X2H4
“commenced 11 Jan 2019, no completion certificate, planned end May 2019”
0.34 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2022”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 26 Jan 2021, no completion certificate, planned end Jul 2021”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 10 Aug 2020, no completion certificate, planned end Dec 2020”
1.96 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Building 11, Cherrywood Business Park, Dublin, Dún Laoghaire-Rathdown, D18 DH50
“commenced 02 Dec 2020, no completion certificate, planned end May 2021”
0.51 ha
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
7 ST. HELEN'S VILLAS, ROCK ROAD, BOOTERSTOWN, CO. DUBLIN, Dublin, A94 H3F9
“1 homes; commenced 13 Sep 2018, no completion certificate, planned end Mar 2019”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Blackthorn Road,, Dublin, D18 F5X2
“commenced 07 Aug 2019, no completion certificate, planned end Dec 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Mountain View, Central Park, Dublin, D18 XN97
“commenced 01 May 2019, no completion certificate, planned end Jul 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
BLACKTHORN ROAD, Dublin 18,SANDYFORD INDUSTRIAL ESTATE, D18 F5X2
“commenced 10 Apr 2019, no completion certificate, planned end Jul 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Barnhill Road, Dublin
“1 homes; commenced 03 Apr 2019, no completion certificate, planned end Oct 2019”
0.20 ha · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Cherrywood Park, Dublin, D18 DH50
“commenced 18 Mar 2019, no completion certificate, planned end Jun 2019”
0.51 ha
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
South County Business Park, Leopardstown, Dublin, Dublin, D18 DH6K
“commenced 23 Nov 2018, no completion certificate, planned end Dec 2019”
Zoned OE · To provide for office and enterprise development
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Ardagh Drive, Dublin, A94 EW97
“1 homes; commenced 19 Nov 2018, no completion certificate, planned end May 2019”
580 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Mountain View, Central Park, Dublin, D18XN97
“commenced 18 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Corner of Carmanhal Road & Blackthorn Road, Dublin, NA
“commenced 24 Jul 2018, no completion certificate, planned end Sep 2018”
0.85 ha · 23–67 homes · Zoned A2 · To provide for the creation of sustainable residential neighbourhoods…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Arkle Road, Dublin, D18 Y3X2
“commenced 25 Apr 2018, no completion certificate, planned end Oct 2018”
0.41 ha · 11–32 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Block H, Central Park, Leopardstown, D18 CK74
“commenced 09 Nov 2018, no completion certificate, planned end Feb 2019”
0.54 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Blackthorn Road, Dublin, D18 KX32
“commenced 12 Apr 2018, no completion certificate, planned end Sep 2018”
80 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
South Country Business Park, Dublin, D18 X5K7
“commenced 28 Apr 2018, no completion certificate, planned end Jul 2018”
Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Bracken Road, Dublin, D18 K2N9
“commenced 20 Oct 2018, no completion certificate, planned end Mar 2019”
0.35 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Sussex Street, Dublin, Dún Laoghaire-Rathdown, A96 C786
“10 homes; commenced 22 May 2023, no completion certificate, planned end Jun 2023”
520 m² · 10 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
Sandyford Road, Dundrum Town Centre, Dún Laoghaire-Rathdown
“commenced 20 Dec 2022, no completion certificate, planned end Dec 2022”
0.49 ha · 13–39 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
“1 homes; commenced 07 Jun 2022, no completion certificate, planned end Sep 2022”
630 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
RSA House, Sandyford Rd, Dublin, Dún Laoghaire-Rathdown, D16 FC92
“commenced 02 Dec 2021, no completion certificate, planned end Feb 2022”
3.13 ha · 87–249 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Murphystown Way, Dublin 18, Dún Laoghaire-Rathdown, N/A
“commenced 16 Sep 2021, no completion certificate, planned end Feb 2022”
2.54 ha · 71–203 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Dublin, Dún Laoghaire-Rathdown, A94 H9T8
“commenced 25 Jun 2021, no completion certificate, planned end Feb 2023”
4.56 ha · 127–365 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Ballyogan Road, Leopardstown, Dublin 18
“commenced 19 May 2020, no completion certificate, planned end Aug 2020”
2.94 ha · 82–235 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 May 2021, no completion certificate, planned end Aug 2021”
25.7 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Dublin, D18 TF72
“commenced 16 Jan 2019, no completion certificate, planned end Mar 2019”
0.65 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Tully Development Area 8, Barrington Road, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 14 Apr 2021, no completion certificate, planned end Oct 2021”
9.68 ha
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Rock Hill, Dublin, A94 W3F2
“commenced 15 Jul 2019, no completion certificate, planned end Oct 2019”
0.14 ha · 3–10 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Frascati Road, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.31 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
5 Leopardstown Rd, Dublin, Dún Laoghaire-Rathdown, D18 XN80
“commenced 19 Oct 2020, no completion certificate, planned end Aug 2021”
Zoned OE · To provide for office and enterprise development
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
“commenced 26 Mar 2020, no completion certificate, planned end Jan 2021”
4.28 ha
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
“1 homes; commenced 17 Dec 2019, no completion certificate, planned end Jul 2020”
640 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
28 Merville Avenue, Stillorgan, Dún Laoghaire-Rathdown, A94DK28
“1 homes; commenced 01 Feb 2021, no completion certificate, planned end May 2021”
520 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
18 Cherrywood, Loughlinstown
“commenced 15 Jul 2019, no completion certificate, planned end Aug 2019”
2.58 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Cherrywood Business Park, Building 4, Dublin, D18 K7W4
“commenced 26 Feb 2019, no completion certificate, planned end Apr 2019”
0.46 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
104 R116, Dublin, A96 T8X0
“0 homes; commenced 12 Nov 2018, no completion certificate, planned end Jan 2019”
440 m² · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Honeypark, Glenageary Road Upper & Kill Avenue, Dún Laoghaire
“197 homes; commenced 11 Aug 2015, no completion certificate, planned end Aug 2016”
410 m² · 197 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
Orwell Road, Dublin, Dún Laoghaire-Rathdown, D14 RX00
“1 homes; commenced 25 Aug 2022, no completion certificate, planned end Nov 2022”
480 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Kilmacud Road Upper, Stillorgan
“48 homes; commenced 04 Aug 2015, no completion certificate, planned end Aug 2017”
0.86 ha · 48 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedTallaght Central, South Dublin
Alexander House, Belgard Square North, Tallaght, D24, South Dublin, D24W8FP
“commenced 18 Feb 2022, no completion certificate, planned end Mar 2022”
1.56 ha · 43–125 homes · Zoned TC · To protect, improve and provide for the future development of Town…
Stalled buildEndedPalmerstown-Fonthill, South Dublin
Fonthill Road, Dublin, D22 E6N3
“commenced 14 Jun 2021, no completion certificate, planned end Jul 2021”
0.34 ha · Zoned MRC · To protect, improve and provide for the future development of a Major…
Stalled buildEndedPalmerstown-Fonthill, South Dublin
Unit 1, Liffey Valley Shopping Centre, Dublin 22, South Dublin, D22 E6N3
“commenced 03 Jul 2022, no completion certificate, planned end Nov 2022”
Zoned MRC · To protect, improve and provide for the future development of a Major…
Stalled buildEndedPalmerstown-Fonthill, South Dublin
“commenced 26 Jul 2021, no completion certificate, planned end Sep 2021”
0.34 ha · Zoned MRC · To protect, improve and provide for the future development of a Major…
Stalled buildEndedTallaght Central, South Dublin
Broomhill Road, Dublin, South Dublin, D24 F6PC
“commenced 12 Jul 2021, no completion certificate, planned end Aug 2021”
0.69 ha · 19–55 homes · Zoned REGEN · To facilitate enterprise and/or residential led regeneration
Stalled buildEndedClondalkin, South Dublin
Profile Park Business Park, New Nangor Road, Dublin 22, South Dublin
“commenced 04 Aug 2023, no completion certificate, planned end Apr 2025”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedClondalkin, South Dublin
“commenced 13 Oct 2022, no completion certificate, planned end Feb 2023”
0.56 ha · Zoned RU · To protect and improve rural amenity and to provide for the…
Stalled buildEndedClondalkin, South Dublin
Garters Lane, Saggart, D24 KF8A
“commenced 28 Apr 2020, no completion certificate, planned end Apr 2020”
Zoned OS · To preserve and provide for open space and recreational amenities
Stalled buildEndedTallaght South, South Dublin
2020 Bianconi Avenue, Dublin, Dublin 24, D24 Y079
“commenced 21 Jun 2019, no completion certificate, planned end Aug 2019”
6.55 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedRathfarnham-Templeogue, South Dublin
Riversdale House, Butterfield Avenue,, Rathfarnham,, Dublin 14
“11 homes; commenced 30 Mar 2017, no completion certificate, planned end Jun 2017”
0.60 ha · 11 homes · Zoned RES · To protect and/or improve residential amenity
Stalled buildEndedTallaght South, South Dublin
“commenced 18 Aug 2023, no completion certificate, planned end Sep 2023”
Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedClondalkin, South Dublin
Nangor Road, Clondalkin, South Dublin, D22 V8F8
“commenced 08 May 2023, no completion certificate, planned end Aug 2023”
35.7 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedRathfarnham-Templeogue, South Dublin
Riversdale House, Butterfield Avenue,, Rathfarnham, Dublin 14
“11 homes; commenced 25 Jul 2016, no completion certificate, planned end Oct 2016”
0.60 ha · 11 homes · Zoned RES · To protect and/or improve residential amenity
Stalled buildEndedTallaght Central, South Dublin
Belgard Square West,, Dublin, D24 XFW2
“commenced 29 Jun 2021, no completion certificate, planned end Jan 2022”
0.85 ha · 23–67 homes · Zoned TC · To protect, improve and provide for the future development of Town…
Stalled buildEndedLucan, South Dublin
Unit 5, Adamstown Industrial Estate, Lucan, Co Dublin, South Dublin, K78 Y638
“commenced 17 Feb 2022, no completion certificate, planned end Apr 2022”
Zoned RU · To protect and improve rural amenity and to provide for the…
Stalled buildEndedPalmerstown-Fonthill, South Dublin
Fonthill Road, Dublin, South Dublin, D22 YD89
“commenced 01 Mar 2022, no completion certificate, planned end Jun 2022”
0.57 ha · Zoned RW · To provide for and consolidate retail warehousing
Stalled buildEndedTallaght South, South Dublin
Orchard Avenue, Dublin, Dublin 12, D24 RW52
“commenced 04 May 2018, no completion certificate, planned end Jun 2018”
Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedTallaght Central, South Dublin
Greenhills Road, Dublin, South Dublin, D24 HY58
“commenced 19 Jan 2023, no completion certificate, planned end Dec 2023”
Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedClondalkin, South Dublin
“commenced 31 May 2021, no completion certificate, planned end May 2022”
2.69 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedRathfarnham-Templeogue, South Dublin
Dargle Wood, Dublin, D16 FX45
“0 homes; commenced 26 Oct 2021, no completion certificate, planned end Dec 2021”
270 m² · Zoned RES · To protect and/or improve residential amenity
Stalled buildEndedClondalkin, South Dublin
Profile Park Business Park, New Nangor Road, Dublin 22, South Dublin
“commenced 26 Jul 2023, no completion certificate, planned end Feb 2025”
8.76 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedTallaght South, South Dublin
Lake Drive, Dublin, Dublin 24, D24 N2HR
“commenced 09 Apr 2018, no completion certificate, planned end May 2018”
2.69 ha · Zoned EE · To provide for enterprise and employment related uses
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
87 Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D14 W6X6
“commenced 09 Aug 2023, no completion certificate, planned end Sep 2023”
Zoned E · To provide for economic development and employment
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Vodafone, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 31 Jul 2023, no completion certificate, planned end Aug 2023”
Zoned OE · To provide for office and enterprise development
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
9 The Hill, Dublin, a94 a240
“commenced 11 Mar 2019, no completion certificate, planned end Sep 2019”
1.33 ha · 37–106 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
4 Blackthorn Road, Dublin, D18 F5X2
“commenced 02 Jul 2019, no completion certificate, planned end Sep 2019”
0.42 ha · 11–33 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…