Ballinalea
Permission for 99 homes expired 13 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
3.92 ha · 99 homes
Source: National planning applications map ↗ · Ref SH202101More in Co. Wicklow →
New signals on development sites across 5 councils, newest first. Each card says why it’s here and links to the source.
Permission for 99 homes expired 13 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
3.92 ha · 99 homes
Source: National planning applications map ↗ · Ref SH202101More in Co. Wicklow →
Permission for 20 homes expired 3 Oct 2026 without a start.
100 m² · 20 homes · Zoned Existing Residential
Source: National planning applications map ↗ · Ref 21205More in Co. Louth →
The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
2.85 ha · 12 homes · Zoned Secondary Development Area
Source: National planning applications map ↗ · Ended 14 Oct 2026 · ref 19344More in Co. Wicklow →
0.4939ha site at nos. 60 (Cois Cnoc), 61, 62 & 63 (Innisfree), Stepaside Lane, Stepaside, Dublin 18
0.50 ha · 29 homes · Zoned NC · To protect, provide for and-or improve mixed-use neighbourhood centre…
Source: National planning applications map ↗ · Ended 11 Oct 2026 · ref D18A/0971More in Dún Laoghaire-Rathdown →
Frascati Road, Blackrock, Dublin, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 14 Aug 2023, no completion certificate, planned end Oct 2023”
0.15 ha · 4–12 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0008905DRMore in Dún Laoghaire-Rathdown →
92 Bracken Road, Dublin, Dún Laoghaire-Rathdown, D18 CY92
“commenced 24 Jul 2023, no completion certificate, planned end Sep 2023”
0.42 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0103526DRMore in Dún Laoghaire-Rathdown →
77 Furze Road, Dublin, Dún Laoghaire-Rathdown, D18 C3X5
“commenced 10 May 2022, no completion certificate, planned end Dec 2022”
0.70 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0089029DRMore in Dún Laoghaire-Rathdown →
“commenced 22 Mar 2023, no completion certificate, planned end May 2023”
0.47 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0098693DRMore in Dún Laoghaire-Rathdown →
3 Arkle Road, Dublin, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 06 Mar 2023, no completion certificate, planned end May 2023”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0098189DRMore in Dún Laoghaire-Rathdown →
Pottery Road, Dublin, Dún Laoghaire-Rathdown, A96 F2A8
“commenced 25 Jan 2021, no completion certificate, planned end Jul 2021”
6.58 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072077DRMore in Dún Laoghaire-Rathdown →
Belfield Office Park, Beech Hill Rd,, Roebuck, Dublin 4, 8Q68 WH
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
0.28 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046627DRMore in Dún Laoghaire-Rathdown →
MountainVIew, Central Park, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 26 Jul 2022, no completion certificate, planned end Sep 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0091942DRMore in Dún Laoghaire-Rathdown →
Ballymoss Road, Dublin, Dún Laoghaire-Rathdown, D18 Y2C9
“commenced 08 Mar 2022, no completion certificate, planned end Jun 2022”
0.38 ha · 10–30 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0007004DRMore in Dún Laoghaire-Rathdown →
“commenced 17 Dec 2021, no completion certificate, planned end Mar 2022”
Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084438DRMore in Dún Laoghaire-Rathdown →
St. Patricks Boys' National School, Newgrange Rd, Blackrock, Dublin, Dublin, A94 FE02
“commenced 18 Jun 2020, no completion certificate, planned end Aug 2020”
2.68 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0065146DRMore in Dún Laoghaire-Rathdown →
4 Dundrum Road, Dublin, Dún Laoghaire-Rathdown, D14 VX61
“commenced 15 Feb 2022, no completion certificate, planned end May 2022”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0086031DRMore in Dún Laoghaire-Rathdown →
CHERRYWOOD BUSINESS PARK, Dublin, South Dublin, D18 T3Y1
“commenced 26 Aug 2021, no completion certificate, planned end Dec 2021”
0.43 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080525DRMore in Dún Laoghaire-Rathdown →
Dun Laoghaire Industrial Estate, Pottery Rd, Dun Laoghaire, Co Dublin, Dublin, Dún Laoghaire-Rathdown, A96 KW29
“commenced 23 Aug 2020, no completion certificate, planned end Jan 2021”
1.33 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067352DRMore in Dún Laoghaire-Rathdown →
1 Pottery Road, Dublin, Monaghan, D18 X2H4
“commenced 11 Jan 2019, no completion certificate, planned end May 2019”
0.34 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0003854DRMore in Dún Laoghaire-Rathdown →
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2022”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0074061DRMore in Dún Laoghaire-Rathdown →
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 26 Jan 2021, no completion certificate, planned end Jul 2021”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072214DRMore in Dún Laoghaire-Rathdown →
“commenced 10 Aug 2020, no completion certificate, planned end Dec 2020”
1.96 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067040DRMore in Dún Laoghaire-Rathdown →
Building 11, Cherrywood Business Park, Dublin, Dún Laoghaire-Rathdown, D18 DH50
“commenced 02 Dec 2020, no completion certificate, planned end May 2021”
0.51 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0071024DRMore in Dún Laoghaire-Rathdown →
7 ST. HELEN'S VILLAS, ROCK ROAD, BOOTERSTOWN, CO. DUBLIN, Dublin, A94 H3F9
“1 homes; commenced 13 Sep 2018, no completion certificate, planned end Mar 2019”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0043503DRMore in Dún Laoghaire-Rathdown →
Blackthorn Road,, Dublin, D18 F5X2
“commenced 07 Aug 2019, no completion certificate, planned end Dec 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0055359DRMore in Dún Laoghaire-Rathdown →
Mountain View, Central Park, Dublin, D18 XN97
“commenced 01 May 2019, no completion certificate, planned end Jul 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0051263DRMore in Dún Laoghaire-Rathdown →
BLACKTHORN ROAD, Dublin 18,SANDYFORD INDUSTRIAL ESTATE, D18 F5X2
“commenced 10 Apr 2019, no completion certificate, planned end Jul 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050602DRMore in Dún Laoghaire-Rathdown →
Barnhill Road, Dublin
“1 homes; commenced 03 Apr 2019, no completion certificate, planned end Oct 2019”
0.20 ha · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050152DRMore in Dún Laoghaire-Rathdown →
Cherrywood Park, Dublin, D18 DH50
“commenced 18 Mar 2019, no completion certificate, planned end Jun 2019”
0.51 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0049526DRMore in Dún Laoghaire-Rathdown →
South County Business Park, Leopardstown, Dublin, Dublin, D18 DH6K
“commenced 23 Nov 2018, no completion certificate, planned end Dec 2019”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046189DRMore in Dún Laoghaire-Rathdown →
Ardagh Drive, Dublin, A94 EW97
“1 homes; commenced 19 Nov 2018, no completion certificate, planned end May 2019”
580 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045825DRMore in Dún Laoghaire-Rathdown →
Mountain View, Central Park, Dublin, D18XN97
“commenced 18 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0040100DRMore in Dún Laoghaire-Rathdown →
Corner of Carmanhal Road & Blackthorn Road, Dublin, NA
“commenced 24 Jul 2018, no completion certificate, planned end Sep 2018”
0.85 ha · 23–67 homes · Zoned A2 · To provide for the creation of sustainable residential neighbourhoods…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0041839DRMore in Dún Laoghaire-Rathdown →
Arkle Road, Dublin, D18 Y3X2
“commenced 25 Apr 2018, no completion certificate, planned end Oct 2018”
0.41 ha · 11–32 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037870DRMore in Dún Laoghaire-Rathdown →
Block H, Central Park, Leopardstown, D18 CK74
“commenced 09 Nov 2018, no completion certificate, planned end Feb 2019”
0.54 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045842DRMore in Dún Laoghaire-Rathdown →
Blackthorn Road, Dublin, D18 KX32
“commenced 12 Apr 2018, no completion certificate, planned end Sep 2018”
80 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037498DRMore in Dún Laoghaire-Rathdown →
South Country Business Park, Dublin, D18 X5K7
“commenced 28 Apr 2018, no completion certificate, planned end Jul 2018”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0038120DRMore in Dún Laoghaire-Rathdown →
Bracken Road, Dublin, D18 K2N9
“commenced 20 Oct 2018, no completion certificate, planned end Mar 2019”
0.35 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0044933DRMore in Dún Laoghaire-Rathdown →
Sussex Street, Dublin, Dún Laoghaire-Rathdown, A96 C786
“10 homes; commenced 22 May 2023, no completion certificate, planned end Jun 2023”
520 m² · 10 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0100833DRMore in Dún Laoghaire-Rathdown →
Sandyford Road, Dundrum Town Centre, Dún Laoghaire-Rathdown
“commenced 20 Dec 2022, no completion certificate, planned end Dec 2022”
0.49 ha · 13–39 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0096473DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 07 Jun 2022, no completion certificate, planned end Sep 2022”
630 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090091DRMore in Dún Laoghaire-Rathdown →
RSA House, Sandyford Rd, Dublin, Dún Laoghaire-Rathdown, D16 FC92
“commenced 02 Dec 2021, no completion certificate, planned end Feb 2022”
3.13 ha · 87–249 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0084043DRMore in Dún Laoghaire-Rathdown →
Murphystown Way, Dublin 18, Dún Laoghaire-Rathdown, N/A
“commenced 16 Sep 2021, no completion certificate, planned end Feb 2022”
2.54 ha · 71–203 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0081586DRMore in Dún Laoghaire-Rathdown →
Dublin, Dún Laoghaire-Rathdown, A94 H9T8
“commenced 25 Jun 2021, no completion certificate, planned end Feb 2023”
4.56 ha · 127–365 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0078068DRMore in Dún Laoghaire-Rathdown →
Ballyogan Road, Leopardstown, Dublin 18
“commenced 19 May 2020, no completion certificate, planned end Aug 2020”
2.94 ha · 82–235 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref SN0005295DRMore in Dún Laoghaire-Rathdown →
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076159DRMore in Dún Laoghaire-Rathdown →
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076139DRMore in Dún Laoghaire-Rathdown →
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 May 2021, no completion certificate, planned end Aug 2021”
25.7 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076125DRMore in Dún Laoghaire-Rathdown →
Dublin, D18 TF72
“commenced 16 Jan 2019, no completion certificate, planned end Mar 2019”
0.65 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0047373DRMore in Dún Laoghaire-Rathdown →
Tully Development Area 8, Barrington Road, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 14 Apr 2021, no completion certificate, planned end Oct 2021”
9.68 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0074085DRMore in Dún Laoghaire-Rathdown →
Rock Hill, Dublin, A94 W3F2
“commenced 15 Jul 2019, no completion certificate, planned end Oct 2019”
0.14 ha · 3–10 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0054206DRMore in Dún Laoghaire-Rathdown →
Frascati Road, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.31 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066825DRMore in Dún Laoghaire-Rathdown →
5 Leopardstown Rd, Dublin, Dún Laoghaire-Rathdown, D18 XN80
“commenced 19 Oct 2020, no completion certificate, planned end Aug 2021”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0069446DRMore in Dún Laoghaire-Rathdown →
“commenced 26 Mar 2020, no completion certificate, planned end Jan 2021”
4.28 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0063175DRMore in Dún Laoghaire-Rathdown →
“1 homes; commenced 17 Dec 2019, no completion certificate, planned end Jul 2020”
640 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0060272DRMore in Dún Laoghaire-Rathdown →
28 Merville Avenue, Stillorgan, Dún Laoghaire-Rathdown, A94DK28
“1 homes; commenced 01 Feb 2021, no completion certificate, planned end May 2021”
520 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072104DRMore in Dún Laoghaire-Rathdown →
18 Cherrywood, Loughlinstown
“commenced 15 Jul 2019, no completion certificate, planned end Aug 2019”
2.58 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0054567DRMore in Dún Laoghaire-Rathdown →
Cherrywood Business Park, Building 4, Dublin, D18 K7W4
“commenced 26 Feb 2019, no completion certificate, planned end Apr 2019”
0.46 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048808DRMore in Dún Laoghaire-Rathdown →
104 R116, Dublin, A96 T8X0
“0 homes; commenced 12 Nov 2018, no completion certificate, planned end Jan 2019”
440 m² · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045592DRMore in Dún Laoghaire-Rathdown →
Honeypark, Glenageary Road Upper & Kill Avenue, Dún Laoghaire
“197 homes; commenced 11 Aug 2015, no completion certificate, planned end Aug 2016”
410 m² · 197 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0009466DRMore in Dún Laoghaire-Rathdown →
Orwell Road, Dublin, Dún Laoghaire-Rathdown, D14 RX00
“1 homes; commenced 25 Aug 2022, no completion certificate, planned end Nov 2022”
480 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0092932DRMore in Dún Laoghaire-Rathdown →
Kilmacud Road Upper, Stillorgan
“48 homes; commenced 04 Aug 2015, no completion certificate, planned end Aug 2017”
0.86 ha · 48 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0009190DRMore in Dún Laoghaire-Rathdown →
87 Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D14 W6X6
“commenced 09 Aug 2023, no completion certificate, planned end Sep 2023”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0104027DRMore in Dún Laoghaire-Rathdown →
Vodafone, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 31 Jul 2023, no completion certificate, planned end Aug 2023”
Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0103493DRMore in Dún Laoghaire-Rathdown →
9 The Hill, Dublin, a94 a240
“commenced 11 Mar 2019, no completion certificate, planned end Sep 2019”
1.33 ha · 37–106 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0049457DRMore in Dún Laoghaire-Rathdown →
4 Blackthorn Road, Dublin, D18 F5X2
“commenced 02 Jul 2019, no completion certificate, planned end Sep 2019”
0.42 ha · 11–33 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0053701DRMore in Dún Laoghaire-Rathdown →
Carysfort Avenue, Blackrock, Dún Laoghaire-Rathdown, A94 H2X4
“commenced 21 Jun 2022, no completion certificate, planned end Oct 2022”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0090531DRMore in Dún Laoghaire-Rathdown →
L5, Termini Building, 3 Arkle Road, Sandyford, Dublin 18, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 02 Nov 2021, no completion certificate, planned end Dec 2021”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0083139DRMore in Dún Laoghaire-Rathdown →
Central Park, Leopardstown, Dublin, Dún Laoghaire-Rathdown, D18 NH10
“commenced 30 Aug 2021, no completion certificate, planned end Mar 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080782DRMore in Dún Laoghaire-Rathdown →
89 Furze Road, Dublin, D18 CK84
“commenced 24 Aug 2021, no completion certificate, planned end Jan 2022”
0.15 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080321DRMore in Dún Laoghaire-Rathdown →
Block C Central Park Leopardstown, Dublin, D18 N924
“commenced 29 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0040745DRMore in Dún Laoghaire-Rathdown →
Central Park, Leopardstown, Dublin, D18 X9R6
“commenced 21 Feb 2019, no completion certificate, planned end Mar 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048352DRMore in Dún Laoghaire-Rathdown →
Dublin, Dún Laoghaire-Rathdown, D18 C9C5
“commenced 27 Aug 2021, no completion certificate, planned end Dec 2021”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0080457DRMore in Dún Laoghaire-Rathdown →
Murphystown Way, dublin 18, Dún Laoghaire-Rathdown, 0000
“commenced 27 Jul 2020, no completion certificate, planned end Oct 2020”
9.63 ha · 269–770 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066720DRMore in Dún Laoghaire-Rathdown →
Dublin, D14 FH90
“commenced 07 Jul 2020, no completion certificate, planned end Nov 2020”
Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066157DRMore in Dún Laoghaire-Rathdown →
Brewery Road, Stillorgan, Blackrock, Dublin, A94 W0PP
“commenced 23 Jan 2020, no completion certificate, planned end Apr 2020”
1.80 ha · 50–144 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0060944DRMore in Dún Laoghaire-Rathdown →
31 Trimleston Avenue, Booterstown, A94 TX94
“commenced 25 Nov 2019, no completion certificate, planned end Jan 2020”
0.55 ha · 15–43 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0059278DRMore in Dún Laoghaire-Rathdown →
Park Court, Glenageary, A96 N6X3
“commenced 26 Aug 2019, no completion certificate, planned end Sep 2019”
0.40 ha · 11–32 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0056021DRMore in Dún Laoghaire-Rathdown →
Stradbrook Road, Dublin, A94 K2V8
“commenced 10 Sep 2019, no completion certificate, planned end Nov 2019”
5.01 ha · Zoned F · To preserve and provide for open space with ancillary active…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0056627DRMore in Dún Laoghaire-Rathdown →
Arkle Road, Sandyford, D18 X6N2
“commenced 04 Mar 2019, no completion certificate, planned end May 2019”
590 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048960DRMore in Dún Laoghaire-Rathdown →
8 Pottery Road, Dublin, A96 W6T8
“commenced 01 Jun 2018, no completion certificate, planned end Sep 2018”
10.5 ha · Zoned E · To provide for economic development and employment
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0039298DRMore in Dún Laoghaire-Rathdown →
“commenced 09 Apr 2018, no completion certificate, planned end Jul 2018”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0037419DRMore in Dún Laoghaire-Rathdown →
Stanford Park, Foxrock, Dublin 18
“16 homes; commenced 13 Oct 2017, no completion certificate, planned end Jan 2019”
1.16 ha · 16 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0032501DRMore in Dún Laoghaire-Rathdown →
Frascati Road, Blackrock, Dublin, Dún Laoghaire-Rathdown, A94 X9Y3
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.30 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066828DRMore in Dún Laoghaire-Rathdown →
“commenced 17 Jul 2020, no completion certificate, planned end Sep 2020”
1.36 ha · 38–108 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0066430DRMore in Dún Laoghaire-Rathdown →
“commenced 17 Jun 2019, no completion certificate, planned end Sep 2019”
1.46 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0052991DRMore in Dún Laoghaire-Rathdown →
Laughanstown, Cherrywood, Dublin 18, Dún Laoghaire-Rathdown
“1 homes; commenced 14 Feb 2022, no completion certificate, planned end Jun 2022”
9.79 ha · 1 home
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0085897DRMore in Dún Laoghaire-Rathdown →
“commenced 18 May 2021, no completion certificate, planned end Jul 2021”
630 m² · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0076232DRMore in Dún Laoghaire-Rathdown →
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2021”
25.7 ha
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0073815DRMore in Dún Laoghaire-Rathdown →
“commenced 08 Apr 2021, no completion certificate, planned end Jul 2021”
1.29 ha · 36–103 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0073809DRMore in Dún Laoghaire-Rathdown →
3 Frascati Road, Blackrock, 1400
“commenced 11 Feb 2020, no completion certificate, planned end Jun 2020”
0.11 ha · 3–8 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0061658DRMore in Dún Laoghaire-Rathdown →
Land at Cherrywood, Dublin, Dún Laoghaire-Rathdown, D18 WD60
“1 homes; commenced 08 Feb 2021, no completion certificate, planned end Jun 2021”
17.0 ha · 1 home
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0072226DRMore in Dún Laoghaire-Rathdown →
Brewery Road, Dublin, Dún Laoghaire-Rathdown
“commenced 12 Oct 2020, no completion certificate, planned end Aug 2021”
21.4 ha · Zoned F · To preserve and provide for open space with ancillary active…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0069268DRMore in Dún Laoghaire-Rathdown →
“commenced 25 Aug 2020, no completion certificate, planned end Sep 2020”
0.35 ha · Zoned OE · To provide for office and enterprise development
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067419DRMore in Dún Laoghaire-Rathdown →
York rd., Dublin, Dún Laoghaire-Rathdown, A96 H361
“1 homes; commenced 02 Sep 2020, no completion certificate, planned end Oct 2020”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067706DRMore in Dún Laoghaire-Rathdown →
Murphystown Way, Dublin, Dún Laoghaire-Rathdown, 0000
“commenced 13 Aug 2020, no completion certificate, planned end Dec 2020”
9.63 ha · 269–770 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0067062DRMore in Dún Laoghaire-Rathdown →
100 Marlay Court, Dublin, D14 VA44
“1 homes; commenced 22 Jun 2020, no completion certificate, planned end Sep 2020”
270 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0064984DRMore in Dún Laoghaire-Rathdown →
Land at Cherrywood, Dublin 18, D18 WD60
“1 homes; commenced 20 May 2020, no completion certificate, planned end Aug 2020”
17.0 ha · 1 home
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0064412DRMore in Dún Laoghaire-Rathdown →
Mount Anville Road, Dublin 14, D14 H5P8
“93 homes; commenced 14 Nov 2019, no completion certificate, planned end Feb 2020”
2.75 ha · 93 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0059012DRMore in Dún Laoghaire-Rathdown →
Murphystown Way, Dublin, 0000
“commenced 29 Aug 2019, no completion certificate, planned end May 2020”
9.63 ha · 269–770 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0055622DRMore in Dún Laoghaire-Rathdown →
21 Johnstown Road, Cabinteely
“49 homes; commenced 14 Jun 2019, no completion certificate, planned end Sep 2019”
0.29 ha · 49 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0053065DRMore in Dún Laoghaire-Rathdown →
Brennanstown Road, Cabinteely, n/a
“commenced 16 Apr 2019, no completion certificate, planned end Aug 2019”
3.67 ha · 102–293 homes · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0050625DRMore in Dún Laoghaire-Rathdown →
Deerpark Road, Mount Merrion,, Blackrock, A94 YX95
“commenced 06 Feb 2019, no completion certificate, planned end Apr 2019”
0.34 ha · 9–27 homes · Zoned NC · To protect, provide for and-or improve mixed-use neighbourhood centre…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0048114DRMore in Dún Laoghaire-Rathdown →
18 Cherrywood, Dublin, A96 Y4E9
“commenced 19 Dec 2018, no completion certificate, planned end Feb 2019”
300 m² · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0046889DRMore in Dún Laoghaire-Rathdown →
18 Cherrywood, Loughlinstown
“1 homes; commenced 12 Nov 2018, no completion certificate, planned end Jan 2019”
300 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0045568DRMore in Dún Laoghaire-Rathdown →
88 Furze Road, Sandyford, Dublin, D18 EK00
“commenced 24 Jun 2019, no completion certificate, planned end Dec 2019”
0.15 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Source: Building control (BCMS) register ↗ · Ended 27 Sept 2026 · ref CN0053400DRMore in Dún Laoghaire-Rathdown →
That’s everything from the last 30 days. See every site on the map →
Not seeing what you need? .