Wed 30 Sep · 3
Permitted, not startedMullingar, Co. Westmeath
Granted 30 Sept 2026 for 50 homes. No commencement notice yet; the permission runs to 30 Sept 2031.
Permitted but idle: the owner may want a builder or a buyer.
3.72 ha · 50 homes · Zoned Proposed Residential
Permitted, not startedNavan, Co. Meath
Granted 30 Sept 2026 for 97 homes. No commencement notice yet; the permission runs to 30 Sept 2031.
0.14 ha · 97 homes · Zoned A2 · New Residential
Permitted, not startedRatoath, Co. Meath
Granted 30 Sept 2026 for 13 homes. No commencement notice yet; the permission runs to 6 Sept 2028.
0.29 ha · 13 homes · Zoned D1 · Tourism
Wed 23 Sep · 1
Permitted, not startedNavan, Co. Meath
Granted 23 Sept 2026 for 245 homes. No commencement notice yet; the permission runs to 10 Aug 2030.
1.76 ha · 245 homes · Zoned A2 · New Residential
Tue 22 Sep · 1
Permitted, not startedLaytown-Bettystown, Co. Meath
Granted 22 Sept 2026 for 12 homes. No commencement notice yet; the permission runs to 22 Sept 2031.
0.30 ha · 12 homes · Zoned A1 · Existing Residential
Mon 21 Sep · 2
Permitted, not startedMoate, Co. Westmeath
Granted 21 Sept 2026 for 46 homes. No commencement notice yet; the permission runs to 21 Sept 2031.
1.85 ha · 46 homes · Zoned Consolidation Site
Permitted, not startedRatoath, Co. Meath
Granted 21 Sept 2026 for 356 homes. No commencement notice yet; the permission runs to 20 Sept 2031.
16.7 ha · 356 homes · Zoned A2 · New Residential
Wed 16 Sep · 2
Permitted, not startedNavan, Co. Meath
Granted 16 Sept 2026 for 93 homes. No commencement notice yet; the permission runs to 10 Jul 2028.
340 m² · 93 homes · Zoned A1 · Existing Residential
New development sites in Dublin, every Monday
The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Permitted, not startedNavan, Co. Meath
Granted 16 Sept 2026 for 93 homes. No commencement notice yet; the permission runs to 10 Jul 2028.
880 m² · 93 homes · Zoned A1 · Existing Residential
Mon 14 Sep · 1
Permitted, not startedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Granted 14 Sept 2026 for 23 homes. No commencement notice yet; the permission runs to 14 Sept 2031.
0.48 ha · 23 homes · Zoned A · To provide residential development and improve residential amenity…
Ended lately (102)Permissions that started, sites off a register, notices closed
Sun 27 Sep
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Frascati Road, Blackrock, Dublin, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 14 Aug 2023, no completion certificate, planned end Oct 2023”
0.15 ha · 4–12 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
92 Bracken Road, Dublin, Dún Laoghaire-Rathdown, D18 CY92
“commenced 24 Jul 2023, no completion certificate, planned end Sep 2023”
0.42 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
77 Furze Road, Dublin, Dún Laoghaire-Rathdown, D18 C3X5
“commenced 10 May 2022, no completion certificate, planned end Dec 2022”
0.70 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
“commenced 22 Mar 2023, no completion certificate, planned end May 2023”
0.47 ha
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
3 Arkle Road, Dublin, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 06 Mar 2023, no completion certificate, planned end May 2023”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Pottery Road, Dublin, Dún Laoghaire-Rathdown, A96 F2A8
“commenced 25 Jan 2021, no completion certificate, planned end Jul 2021”
6.58 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Belfield Office Park, Beech Hill Rd,, Roebuck, Dublin 4, 8Q68 WH
“commenced 10 Dec 2018, no completion certificate, planned end Apr 2019”
0.28 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
MountainVIew, Central Park, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 26 Jul 2022, no completion certificate, planned end Sep 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Ballymoss Road, Dublin, Dún Laoghaire-Rathdown, D18 Y2C9
“commenced 08 Mar 2022, no completion certificate, planned end Jun 2022”
0.38 ha · 10–30 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 17 Dec 2021, no completion certificate, planned end Mar 2022”
Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
St. Patricks Boys' National School, Newgrange Rd, Blackrock, Dublin, Dublin, A94 FE02
“commenced 18 Jun 2020, no completion certificate, planned end Aug 2020”
2.68 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
4 Dundrum Road, Dublin, Dún Laoghaire-Rathdown, D14 VX61
“commenced 15 Feb 2022, no completion certificate, planned end May 2022”
Zoned E · To provide for economic development and employment
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
CHERRYWOOD BUSINESS PARK, Dublin, South Dublin, D18 T3Y1
“commenced 26 Aug 2021, no completion certificate, planned end Dec 2021”
0.43 ha
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Dun Laoghaire Industrial Estate, Pottery Rd, Dun Laoghaire, Co Dublin, Dublin, Dún Laoghaire-Rathdown, A96 KW29
“commenced 23 Aug 2020, no completion certificate, planned end Jan 2021”
1.33 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
1 Pottery Road, Dublin, Monaghan, D18 X2H4
“commenced 11 Jan 2019, no completion certificate, planned end May 2019”
0.34 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2022”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D04 AE48
“commenced 26 Jan 2021, no completion certificate, planned end Jul 2021”
0.70 ha · 19–55 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 10 Aug 2020, no completion certificate, planned end Dec 2020”
1.96 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Building 11, Cherrywood Business Park, Dublin, Dún Laoghaire-Rathdown, D18 DH50
“commenced 02 Dec 2020, no completion certificate, planned end May 2021”
0.51 ha
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
7 ST. HELEN'S VILLAS, ROCK ROAD, BOOTERSTOWN, CO. DUBLIN, Dublin, A94 H3F9
“1 homes; commenced 13 Sep 2018, no completion certificate, planned end Mar 2019”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Blackthorn Road,, Dublin, D18 F5X2
“commenced 07 Aug 2019, no completion certificate, planned end Dec 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Mountain View, Central Park, Dublin, D18 XN97
“commenced 01 May 2019, no completion certificate, planned end Jul 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
BLACKTHORN ROAD, Dublin 18,SANDYFORD INDUSTRIAL ESTATE, D18 F5X2
“commenced 10 Apr 2019, no completion certificate, planned end Jul 2019”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Barnhill Road, Dublin
“1 homes; commenced 03 Apr 2019, no completion certificate, planned end Oct 2019”
0.20 ha · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Cherrywood Park, Dublin, D18 DH50
“commenced 18 Mar 2019, no completion certificate, planned end Jun 2019”
0.51 ha
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
South County Business Park, Leopardstown, Dublin, Dublin, D18 DH6K
“commenced 23 Nov 2018, no completion certificate, planned end Dec 2019”
Zoned OE · To provide for office and enterprise development
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Ardagh Drive, Dublin, A94 EW97
“1 homes; commenced 19 Nov 2018, no completion certificate, planned end May 2019”
580 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Mountain View, Central Park, Dublin, D18XN97
“commenced 18 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Corner of Carmanhal Road & Blackthorn Road, Dublin, NA
“commenced 24 Jul 2018, no completion certificate, planned end Sep 2018”
0.85 ha · 23–67 homes · Zoned A2 · To provide for the creation of sustainable residential neighbourhoods…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Arkle Road, Dublin, D18 Y3X2
“commenced 25 Apr 2018, no completion certificate, planned end Oct 2018”
0.41 ha · 11–32 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Block H, Central Park, Leopardstown, D18 CK74
“commenced 09 Nov 2018, no completion certificate, planned end Feb 2019”
0.54 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Blackthorn Road, Dublin, D18 KX32
“commenced 12 Apr 2018, no completion certificate, planned end Sep 2018”
80 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
South Country Business Park, Dublin, D18 X5K7
“commenced 28 Apr 2018, no completion certificate, planned end Jul 2018”
Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Bracken Road, Dublin, D18 K2N9
“commenced 20 Oct 2018, no completion certificate, planned end Mar 2019”
0.35 ha · Zoned SNI · To protect, improve and encourage the provision of sustainable…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Sussex Street, Dublin, Dún Laoghaire-Rathdown, A96 C786
“10 homes; commenced 22 May 2023, no completion certificate, planned end Jun 2023”
520 m² · 10 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
Sandyford Road, Dundrum Town Centre, Dún Laoghaire-Rathdown
“commenced 20 Dec 2022, no completion certificate, planned end Dec 2022”
0.49 ha · 13–39 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
“1 homes; commenced 07 Jun 2022, no completion certificate, planned end Sep 2022”
630 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
RSA House, Sandyford Rd, Dublin, Dún Laoghaire-Rathdown, D16 FC92
“commenced 02 Dec 2021, no completion certificate, planned end Feb 2022”
3.13 ha · 87–249 homes · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Murphystown Way, Dublin 18, Dún Laoghaire-Rathdown, N/A
“commenced 16 Sep 2021, no completion certificate, planned end Feb 2022”
2.54 ha · 71–203 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Dublin, Dún Laoghaire-Rathdown, A94 H9T8
“commenced 25 Jun 2021, no completion certificate, planned end Feb 2023”
4.56 ha · 127–365 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Ballyogan Road, Leopardstown, Dublin 18
“commenced 19 May 2020, no completion certificate, planned end Aug 2020”
2.94 ha · 82–235 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Townlands of Laughanstown, Brennanstown & Cherrywood, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 21 May 2021, no completion certificate, planned end Sep 2021”
9.79 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 May 2021, no completion certificate, planned end Aug 2021”
25.7 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Dublin, D18 TF72
“commenced 16 Jan 2019, no completion certificate, planned end Mar 2019”
0.65 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Tully Development Area 8, Barrington Road, Cherrywood, Dún Laoghaire-Rathdown, N/A
“commenced 14 Apr 2021, no completion certificate, planned end Oct 2021”
9.68 ha
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Rock Hill, Dublin, A94 W3F2
“commenced 15 Jul 2019, no completion certificate, planned end Oct 2019”
0.14 ha · 3–10 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Frascati Road, Dublin, Dún Laoghaire-Rathdown, A94 KX54
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.31 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
5 Leopardstown Rd, Dublin, Dún Laoghaire-Rathdown, D18 XN80
“commenced 19 Oct 2020, no completion certificate, planned end Aug 2021”
Zoned OE · To provide for office and enterprise development
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
“commenced 26 Mar 2020, no completion certificate, planned end Jan 2021”
4.28 ha
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
“1 homes; commenced 17 Dec 2019, no completion certificate, planned end Jul 2020”
640 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
28 Merville Avenue, Stillorgan, Dún Laoghaire-Rathdown, A94DK28
“1 homes; commenced 01 Feb 2021, no completion certificate, planned end May 2021”
520 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
18 Cherrywood, Loughlinstown
“commenced 15 Jul 2019, no completion certificate, planned end Aug 2019”
2.58 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Cherrywood Business Park, Building 4, Dublin, D18 K7W4
“commenced 26 Feb 2019, no completion certificate, planned end Apr 2019”
0.46 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
104 R116, Dublin, A96 T8X0
“0 homes; commenced 12 Nov 2018, no completion certificate, planned end Jan 2019”
440 m² · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Honeypark, Glenageary Road Upper & Kill Avenue, Dún Laoghaire
“197 homes; commenced 11 Aug 2015, no completion certificate, planned end Aug 2016”
410 m² · 197 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
Orwell Road, Dublin, Dún Laoghaire-Rathdown, D14 RX00
“1 homes; commenced 25 Aug 2022, no completion certificate, planned end Nov 2022”
480 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Kilmacud Road Upper, Stillorgan
“48 homes; commenced 04 Aug 2015, no completion certificate, planned end Aug 2017”
0.86 ha · 48 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
87 Stillorgan Road, Dublin, Dún Laoghaire-Rathdown, D14 W6X6
“commenced 09 Aug 2023, no completion certificate, planned end Sep 2023”
Zoned E · To provide for economic development and employment
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Vodafone, Dublin, Dún Laoghaire-Rathdown, D18 XN97
“commenced 31 Jul 2023, no completion certificate, planned end Aug 2023”
Zoned OE · To provide for office and enterprise development
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
9 The Hill, Dublin, a94 a240
“commenced 11 Mar 2019, no completion certificate, planned end Sep 2019”
1.33 ha · 37–106 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
4 Blackthorn Road, Dublin, D18 F5X2
“commenced 02 Jul 2019, no completion certificate, planned end Sep 2019”
0.42 ha · 11–33 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Carysfort Avenue, Blackrock, Dún Laoghaire-Rathdown, A94 H2X4
“commenced 21 Jun 2022, no completion certificate, planned end Oct 2022”
Zoned E · To provide for economic development and employment
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
L5, Termini Building, 3 Arkle Road, Sandyford, Dublin 18, Dún Laoghaire-Rathdown, D18 T6T7
“commenced 02 Nov 2021, no completion certificate, planned end Dec 2021”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Central Park, Leopardstown, Dublin, Dún Laoghaire-Rathdown, D18 NH10
“commenced 30 Aug 2021, no completion certificate, planned end Mar 2022”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
89 Furze Road, Dublin, D18 CK84
“commenced 24 Aug 2021, no completion certificate, planned end Jan 2022”
0.15 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Block C Central Park Leopardstown, Dublin, D18 N924
“commenced 29 Jun 2018, no completion certificate, planned end Sep 2018”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Central Park, Leopardstown, Dublin, D18 X9R6
“commenced 21 Feb 2019, no completion certificate, planned end Mar 2019”
6.87 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Dublin, Dún Laoghaire-Rathdown, D18 C9C5
“commenced 27 Aug 2021, no completion certificate, planned end Dec 2021”
0.68 ha · 18–54 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Murphystown Way, dublin 18, Dún Laoghaire-Rathdown, 0000
“commenced 27 Jul 2020, no completion certificate, planned end Oct 2020”
9.63 ha · 269–770 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Dublin, D14 FH90
“commenced 07 Jul 2020, no completion certificate, planned end Nov 2020”
Zoned E · To provide for economic development and employment
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Brewery Road, Stillorgan, Blackrock, Dublin, A94 W0PP
“commenced 23 Jan 2020, no completion certificate, planned end Apr 2020”
1.80 ha · 50–144 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
31 Trimleston Avenue, Booterstown, A94 TX94
“commenced 25 Nov 2019, no completion certificate, planned end Jan 2020”
0.55 ha · 15–43 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Park Court, Glenageary, A96 N6X3
“commenced 26 Aug 2019, no completion certificate, planned end Sep 2019”
0.40 ha · 11–32 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
Stradbrook Road, Dublin, A94 K2V8
“commenced 10 Sep 2019, no completion certificate, planned end Nov 2019”
5.01 ha · Zoned F · To preserve and provide for open space with ancillary active…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Arkle Road, Sandyford, D18 X6N2
“commenced 04 Mar 2019, no completion certificate, planned end May 2019”
590 m² · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
8 Pottery Road, Dublin, A96 W6T8
“commenced 01 Jun 2018, no completion certificate, planned end Sep 2018”
10.5 ha · Zoned E · To provide for economic development and employment
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 09 Apr 2018, no completion certificate, planned end Jul 2018”
0.79 ha · 22–63 homes · Zoned MOC · To provide for a mix of uses. Which complements the inner core, but…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Stanford Park, Foxrock, Dublin 18
“16 homes; commenced 13 Oct 2017, no completion certificate, planned end Jan 2019”
1.16 ha · 16 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
Frascati Road, Blackrock, Dublin, Dún Laoghaire-Rathdown, A94 X9Y3
“commenced 31 Jul 2020, no completion certificate, planned end Aug 2020”
0.30 ha · 8–24 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
“commenced 17 Jul 2020, no completion certificate, planned end Sep 2020”
1.36 ha · 38–108 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
“commenced 17 Jun 2019, no completion certificate, planned end Sep 2019”
1.46 ha
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Laughanstown, Cherrywood, Dublin 18, Dún Laoghaire-Rathdown
“1 homes; commenced 14 Feb 2022, no completion certificate, planned end Jun 2022”
9.79 ha · 1 home
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
“commenced 18 May 2021, no completion certificate, planned end Jul 2021”
630 m² · Zoned MTC · To protect, provide for and-or improve major town centre facilities
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Block H, Cherrywood Science & Technology Park,, Dublin, Dún Laoghaire-Rathdown, D18 W2P5
“commenced 12 Apr 2021, no completion certificate, planned end Jul 2021”
25.7 ha
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
“commenced 08 Apr 2021, no completion certificate, planned end Jul 2021”
1.29 ha · 36–103 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedBlackrock, Dún Laoghaire-Rathdown
3 Frascati Road, Blackrock, 1400
“commenced 11 Feb 2020, no completion certificate, planned end Jun 2020”
0.11 ha · 3–8 homes · Zoned DC · To protect, provide for and-or improve mixed-use district centre…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Land at Cherrywood, Dublin, Dún Laoghaire-Rathdown, D18 WD60
“1 homes; commenced 08 Feb 2021, no completion certificate, planned end Jun 2021”
17.0 ha · 1 home
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Brewery Road, Dublin, Dún Laoghaire-Rathdown
“commenced 12 Oct 2020, no completion certificate, planned end Aug 2021”
21.4 ha · Zoned F · To preserve and provide for open space with ancillary active…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
“commenced 25 Aug 2020, no completion certificate, planned end Sep 2020”
0.35 ha · Zoned OE · To provide for office and enterprise development
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
York rd., Dublin, Dún Laoghaire-Rathdown, A96 H361
“1 homes; commenced 02 Sep 2020, no completion certificate, planned end Oct 2020”
600 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Murphystown Way, Dublin, Dún Laoghaire-Rathdown, 0000
“commenced 13 Aug 2020, no completion certificate, planned end Dec 2020”
9.63 ha · 269–770 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDundrum, Dún Laoghaire-Rathdown
100 Marlay Court, Dublin, D14 VA44
“1 homes; commenced 22 Jun 2020, no completion certificate, planned end Sep 2020”
270 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
Land at Cherrywood, Dublin 18, D18 WD60
“1 homes; commenced 20 May 2020, no completion certificate, planned end Aug 2020”
17.0 ha · 1 home
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Mount Anville Road, Dublin 14, D14 H5P8
“93 homes; commenced 14 Nov 2019, no completion certificate, planned end Feb 2020”
2.75 ha · 93 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
Murphystown Way, Dublin, 0000
“commenced 29 Aug 2019, no completion certificate, planned end May 2020”
9.63 ha · 269–770 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedDún Laoghaire, Dún Laoghaire-Rathdown
21 Johnstown Road, Cabinteely
“49 homes; commenced 14 Jun 2019, no completion certificate, planned end Sep 2019”
0.29 ha · 49 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Brennanstown Road, Cabinteely, n/a
“commenced 16 Apr 2019, no completion certificate, planned end Aug 2019”
3.67 ha · 102–293 homes · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedStillorgan, Dún Laoghaire-Rathdown
Deerpark Road, Mount Merrion,, Blackrock, A94 YX95
“commenced 06 Feb 2019, no completion certificate, planned end Apr 2019”
0.34 ha · 9–27 homes · Zoned NC · To protect, provide for and-or improve mixed-use neighbourhood centre…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
18 Cherrywood, Dublin, A96 Y4E9
“commenced 19 Dec 2018, no completion certificate, planned end Feb 2019”
300 m² · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedKilliney-Shankill, Dún Laoghaire-Rathdown
18 Cherrywood, Loughlinstown
“1 homes; commenced 12 Nov 2018, no completion certificate, planned end Jan 2019”
300 m² · 1 home · Zoned A · To provide residential development and improve residential amenity…
Stalled buildEndedGlencullen-Sandyford, Dún Laoghaire-Rathdown
88 Furze Road, Sandyford, Dublin, D18 EK00
“commenced 24 Jun 2019, no completion certificate, planned end Dec 2019”
0.15 ha · Zoned LIW · To improve and provide for low density warehousing-light industrial…