Sun 11 Oct · 1
Permission running out11 months leftDrogheda Urban, Co. Louth
Permission for 28 homes granted 16 Sept 2021 runs out 11 Oct 2027, and building hasn't started.
An owner facing a lapse may sell, partner or extend.
0.56 ha · 28 homes · Zoned New Residential Phase 1
Sun 4 Oct · 1
Permission expiredSouth West Inner City, Dublin City
Permission for 27 homes expired 4 Oct 2026 without a start.
The owner must apply again or sell. The principle is already established.
0.10 ha · 27 homes · Zoned Z15 · Community and Social Infrastructure
Sat 3 Oct · 1
Permission expiredDundalk South, Co. Louth
Permission for 20 homes expired 3 Oct 2026 without a start.
100 m² · 20 homes · Zoned Existing Residential
Wed 30 Sep · 1
Derelict siteKimmage-Rathmines, Dublin City
On Dublin City Council's derelict sites register since 30 Sept 2026 (ref DS2385).
A 7% yearly charge presses the owner to sell or build.
Zoned Z1 · Sustainable Residential Neighbourhoods
Also on 1 other site
Tue 29 Sep · 2
Permitted, not startedPortlaoise, Co. Laois
Granted 29 Sept 2026 for 174 homes. No commencement notice yet; the permission runs to 29 Sept 2031.
Permitted but idle: the owner may want a builder or a buyer.
6.08 ha · 174 homes · Zoned Residential 2
Derelict siteKimmage-Rathmines, Dublin City
On Dublin City Council's derelict sites register since 29 Sept 2026 (ref DS2384).
Zoned Z10 · Inner Suburban and inner City Sustainable Mixed-Uses
Also on 1 other site
Mon 28 Sep · 1
Permitted, not startedDrogheda Rural, Co. Louth
Granted 28 Sept 2026 for 97 homes. No commencement notice yet; the permission runs to 27 Sept 2031.
4.28 ha · 97 homes · Zoned New Residential Phase 1
New development sites in Dublin, every Monday
The week's new sites: permission running out, council selling land, derelict or stalled. Each with its source. Free while in beta.
Ended lately (87)Permissions that started, sites off a register, notices closed
Sat 10 Oct
Council selling landEndedKimmage-Rathmines, Dublin City
The council's disposal notice has closed.
“Report on proposed disposal of Fee Simple interest in 114 Sundrive Road.”
Zoned Z1 · Sustainable Residential Neighbourhoods
Council selling landEndedRush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed lease of land at St. Catherine's Estate to Rush Athletic Football Club”
Zoned TC · Town and District Centre
Council selling landEndedRush-Lusk, Fingal
The council's disposal notice has closed.
“Proposed disposal of land for the rectification of boundary at Rhencullen, Main Street, Lusk, Co. Dublin”
Zoned TC · Town and District Centre
Council selling landEndedBlanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Cappogue Industrial Estate, Ballycoolin Road, Dublin 15 to the National Transport Authority”
Zoned NSC · National Sports Campus
Tue 6 Oct
Council selling landEndedBlanchardstown-Mulhuddart, Fingal
The council's disposal notice has closed.
“Proposed disposal of land at Church Fields, Mulhuddart, Dublin 15, County Dublin, to GEM Construction Limited”
Zoned RD · Road
Sun 4 Oct
Permitted, not startedEndedCastleknock, Fingal
Work started for 175 homes: a commencement notice was lodged, so the permission is in use.
1.88 ha · 175 homes · Zoned RS · Residential
Sat 3 Oct
Derelict siteEndedBallyfermot-Drimnagh, Dublin City
Taken off Dublin City Council's derelict sites register.
4.21 ha · 117–336 homes · Zoned Z1 · Sustainable Residential Neighbourhoods
Also:On the RZLT map (3% land tax)
Wed 30 Sep
Derelict siteEndedBlanchardstown-Mulhuddart, Fingal
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Also:Council selling land
Also on 10 other sites
Derelict siteEndedSwords, Fingal
Taken off Fingal Council's derelict sites register.
Zoned RD · Road
Also:Council selling land
Also on 10 other sites
Derelict siteEndedBalbriggan, Fingal
Taken off Fingal Council's derelict sites register.
Zoned TC · Town and District Centre
Also:Council selling land
Also on 3 other sites
Derelict siteEndedHowth-Malahide, Fingal
Taken off Fingal Council's derelict sites register.
16.4 ha · 460–1315 homes · Zoned RS · Residential
Also:On the RZLT map, no permission
Derelict siteEndedBallymun-Finglas, Fingal
Taken off Fingal Council's derelict sites register.
Also:Council selling land
Also on 1 other site
Sun 27 Sep
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 12 Dec 2022, no completion certificate, planned end Apr 2023”
0.53 ha · Zoned Z6 · Employment/Enterprise
Stalled buildEndedPembroke, Dublin City
Waterloo Road, Dublin, Dublin 4, D04 T2R0
“1 homes; commenced 09 Jul 2020, no completion certificate, planned end Jul 2021”
250 m² · 1 home · Zoned Z2 · Residential Neighbourhoods (Conservation Areas)
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 20 Jul 2018, no completion certificate, planned end Dec 2018”
Zoned Z6 · Employment/Enterprise
Stalled buildEndedSouth East Inner City, Dublin City
Block 2, Miesian Plaza, 59 Baggot Street Lower, Dublin 2, D02 HX46
“commenced 02 May 2023, no completion certificate, planned end Oct 2023”
Zoned Z6 · Employment/Enterprise
Stalled buildEndedNorth Inner City, Dublin City
George's Dock, Dublin 1, D01 W3P9
“commenced 15 Jun 2022, no completion certificate, planned end Jul 2022”
100 m² · Zoned Z5 · City Centre
Stalled buildEndedPembroke, Dublin City
Merrion Road, Dublin, D04 X2K5
“commenced 23 Oct 2018, no completion certificate, planned end Apr 2019”
Zoned Z6 · Employment/Enterprise
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 14 Jan 2019, no completion certificate, planned end Apr 2019”
Zoned Z6 · Employment/Enterprise
Stalled buildEndedSouth East Inner City, Dublin City
13-17 Dawson Street, Dublin 2, D02 TF98
“commenced 03 Jul 2018, no completion certificate, planned end Oct 2018”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
Ringsend Road, Dublin 4, D04 K7N3
“commenced 25 Oct 2019, no completion certificate, planned end Apr 2020”
Zoned Z6 · Employment/Enterprise
Stalled buildEndedCabra-Glasnevin, Dublin City
St Mary’s Hospital, Phoenix Park,, Chapelizod,, Dublin, D20 TY72
“commenced 24 Nov 2020, no completion certificate, planned end Dec 2020”
Zoned Z9 · Amenity/Open Space Lands/Green Network
Stalled buildEndedNorth Inner City, Dublin City
“commenced 29 Mar 2022, no completion certificate, planned end Aug 2022”
850 m² · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedPembroke, Dublin City
Merrion Road, Dublin, D04 T6F4
“commenced 06 Jul 2020, no completion certificate, planned end Jul 2021”
Zoned Z15 · Community and Social Infrastructure
Stalled buildEndedNorth Inner City, Dublin City
“commenced 11 Feb 2022, no completion certificate, planned end May 2022”
0.37 ha · 10–29 homes · Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
7-9 Leinster Street South, Dublin, Dublin 2, D02 K104
“commenced 30 Sep 2020, no completion certificate, planned end Oct 2020”
980 m² · Zoned Z5 · City Centre
Stalled buildEndedNorth Inner City, Dublin City
North King street, Dublin, D07 T882
“commenced 14 Dec 2018, no completion certificate, planned end Dec 2018”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 28 Aug 2018, no completion certificate, planned end Oct 2018”
Zoned Z8 · Georgian Conservation Areas
Stalled buildEndedKimmage-Rathmines, Dublin City
Saint Agnes Avenue, Dublin, Dublin 12
“commenced 04 Apr 2022, no completion certificate, planned end Sep 2023”
1.64 ha · Zoned Z15 · Community and Social Infrastructure
Stalled buildEndedPembroke, Dublin City
Merrion Road, Dublin, Dublin 4, D04 NV02
“commenced 02 Sep 2019, no completion certificate, planned end Jun 2020”
0.43 ha · Zoned Z6 · Employment/Enterprise
Stalled buildEndedBallyfermot-Drimnagh, Dublin City
“commenced 11 Nov 2019, no completion certificate, planned end Jun 2020”
0.81 ha · 22–64 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 04 Jun 2019, no completion certificate, planned end Sep 2019”
Zoned Z5 · City Centre
Stalled buildEndedNorth Inner City, Dublin City
“commenced 25 Oct 2021, no completion certificate, planned end Nov 2021”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedNorth Inner City, Dublin City
“commenced 09 Aug 2018, no completion certificate, planned end May 2019”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 25 Jul 2019, no completion certificate, planned end Dec 2019”
0.43 ha · 12–34 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedSouth East Inner City, Dublin City
112 & 113 Grafton Street, Dublin, D02 XK16
“commenced 08 Mar 2019, no completion certificate, planned end Jun 2019”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
Peter Street, Dublin 8, D08 P46N
“commenced 12 Dec 2018, no completion certificate, planned end Mar 2019”
Zoned Z5 · City Centre
Stalled buildEndedNorth Inner City, Dublin City
Grangegorman Lower, Dublin, Dublin 7, D07 XT95
“commenced 03 Mar 2022, no completion certificate, planned end Oct 2022”
0.55 ha · 15–43 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedSouth East Inner City, Dublin City
69-71 Saint Stephen's Green, Dublin 2
“commenced 25 Jun 2018, no completion certificate, planned end Mar 2020”
Zoned Z8 · Georgian Conservation Areas
Stalled buildEndedDonaghmede, Dublin City
Grange Road, Donaghmede, Dublin 13, D13 X966
“commenced 03 Apr 2018, no completion certificate, planned end Oct 2018”
Zoned Z4 · Key Urban Villages/Urban Villages
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 19 Mar 2019, no completion certificate, planned end May 2019”
0.14 ha · 3–11 homes · Zoned Z4 · Key Urban Villages/Urban Villages
Stalled buildEndedSouth East Inner City, Dublin City
24-26 City Quay, Dublin, Dublin 2, D02 NY19
“commenced 24 Aug 2021, no completion certificate, planned end Dec 2021”
Zoned Z5 · City Centre
Stalled buildEndedSouth West Inner City, Dublin City
“commenced 11 Jul 2023, no completion certificate, planned end Oct 2023”
Zoned Z1 · Sustainable Residential Neighbourhoods
Stalled buildEndedSouth East Inner City, Dublin City
Stephen Court, 18-21 SAINT STEPHEN'S GREEN, Dublin, Dublin 2, D02 N960
“commenced 05 Oct 2019, no completion certificate, planned end Oct 2019”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 11 Nov 2021, no completion certificate, planned end Nov 2021”
330 m² · Zoned Z5 · City Centre
Stalled buildEndedPembroke, Dublin City
“1 homes; commenced 24 Sep 2018, no completion certificate, planned end Mar 2019”
1 home · Zoned Z2 · Residential Neighbourhoods (Conservation Areas)
Stalled buildEndedNorth Inner City, Dublin City
“commenced 30 Nov 2021, no completion certificate, planned end Apr 2022”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
18 Kevin Street Lower, Dublin, Dublin 8, D08 TKF7
“299 homes; commenced 23 Feb 2022, no completion certificate, planned end Feb 2023”
1.59 ha · 299 homes · Zoned Z5 · City Centre
Stalled buildEndedSouth West Inner City, Dublin City
13-14 Newmarket, Dublin, Dublin 8, D08 KD91
“commenced 09 Dec 2021, no completion certificate, planned end Mar 2022”
0.24 ha · 6–19 homes · Zoned Z10 · Inner Suburban and inner City Sustainable Mixed-Uses
Stalled buildEndedSouth East Inner City, Dublin City
Macken Street and Grand Canal Street Lower, Dublin, Dublin 2
“commenced 25 Jul 2022, no completion certificate, planned end Oct 2022”
0.14 ha · Zoned Z6 · Employment/Enterprise
Stalled buildEndedNorth Inner City, Dublin City
Block 2, Dublin Landings, North Wall Quay, Dublin, none
“commenced 24 Jul 2018, no completion certificate, planned end Nov 2018”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedKimmage-Rathmines, Dublin City
“0 homes; commenced 30 Mar 2018, no completion certificate, planned end Apr 2018”
Zoned Z4 · Key Urban Villages/Urban Villages
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 10 Oct 2022, no completion certificate, planned end Nov 2022”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedBallymun-Finglas, Dublin City
North Road, Finglas, Dublin 11, D11 K6KP
“commenced 24 Mar 2023, no completion certificate, planned end Mar 2023”
Zoned Z6 · Employment/Enterprise
Stalled buildEndedNorth Inner City, Dublin City
O'Connell Street, Dublin, Dublin 1, D01 H6K0
“commenced 31 May 2023, no completion certificate, planned end Nov 2023”
0.63 ha · 17–50 homes · Zoned Z5 · City Centre
Stalled buildEndedNorth Inner City, Dublin City
Blackhall Place, Dublin, Dublin 7, D07 VY24
“commenced 15 Jul 2019, no completion certificate, planned end Aug 2019”
2.41 ha · Zoned Z9 · Amenity/Open Space Lands/Green Network
Stalled buildEndedPembroke, Dublin City
“commenced 21 Dec 2020, no completion certificate, planned end Feb 2021”
0.31 ha · Zoned Z6 · Employment/Enterprise
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 21 Jun 2018, no completion certificate, planned end Sep 2018”
Zoned Z5 · City Centre
Stalled buildEndedNorth Inner City, Dublin City
Northbank House,Sheriff Street, Dublin, Dublin 1, D01 R8N0
“commenced 26 Jul 2023, no completion certificate, planned end Oct 2023”
0.38 ha · 10–30 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedSouth East Inner City, Dublin City
14 Sráid Haiste Íochtarach, Dublin, Dublin 2, D02 W773 & D02 CK83
“commenced 26 Aug 2019, no completion certificate, planned end Nov 2019”
160 m² · Zoned Z6 · Employment/Enterprise
Stalled buildEndedCabra-Glasnevin, Dublin City
13 Royal Canal Avenue, Dublin, Dublin 15, D15 R8CT
“commenced 03 Feb 2020, no completion certificate, planned end Apr 2021”
Stalled buildEndedSouth East Inner City, Dublin City
Townsend Street, Dublin, Dublin 2, D02 R156
“commenced 16 Jun 2022, no completion certificate, planned end Oct 2022”
0.43 ha · 12–34 homes · Zoned Z5 · City Centre
Stalled buildEndedPembroke, Dublin City
160 Shelbourne Road, Dublin, Dublin 4, D04 E7K5
“commenced 30 Sep 2019, no completion certificate, planned end Dec 2019”
Zoned Z10 · Inner Suburban and inner City Sustainable Mixed-Uses
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 29 Aug 2023, no completion certificate, planned end Sep 2023”
0.13 ha · Zoned Z8 · Georgian Conservation Areas
Stalled buildEndedClontarf, Dublin City
“1 homes; commenced 17 Aug 2020, no completion certificate, planned end Oct 2020”
1 home · Zoned Z2 · Residential Neighbourhoods (Conservation Areas)
Stalled buildEndedSouth West Inner City, Dublin City
“commenced 27 Mar 2019, no completion certificate, planned end May 2019”
Zoned Z4
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 01 May 2018, no completion certificate, planned end Nov 2018”
Zoned Z8 · Georgian Conservation Areas
Stalled buildEndedBallyfermot-Drimnagh, Dublin City
Bluebell Road, Dublin 12, D12 KC63
“commenced 14 Aug 2019, no completion certificate, planned end Oct 2019”
Zoned Z15 · Community and Social Infrastructure
Stalled buildEndedSouth East Inner City, Dublin City
20 Kildare Street, Dublin, Dublin 2, D02Y9C2
“commenced 14 Nov 2022, no completion certificate, planned end May 2023”
300 m² · Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 14 Jun 2019, no completion certificate, planned end Sep 2019”
0.59 ha · 16–47 homes · Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
Kingram Place, Dublin, Dublin 2, D02 XY88
“commenced 23 Jun 2022, no completion certificate, planned end Oct 2022”
Zoned Z6 · Employment/Enterprise
Stalled buildEndedNorth Inner City, Dublin City
The Exo Building, North Wall Quay, Dublin, Dublin 1, D01 W5Y2
“commenced 16 Jun 2022, no completion certificate, planned end Dec 2022”
0.19 ha · 5–15 homes · Zoned Z4 · Key Urban Villages/Urban Villages
Stalled buildEndedNorth Inner City, Dublin City
“commenced 05 Sep 2022, no completion certificate, planned end Dec 2022”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“1 homes; commenced 24 Sep 2018, no completion certificate, planned end Dec 2018”
1 home · Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 09 Jan 2023, no completion certificate, planned end Mar 2023”
0.48 ha · 13–38 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedStillorgan, Dublin City
Beech Hill Office Campus, Dublin 4, D04 V5N2
“commenced 01 Oct 2019, no completion certificate, planned end Dec 2019”
0.38 ha
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 05 Jun 2018, no completion certificate, planned end Jul 2018”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 31 Oct 2018, no completion certificate, planned end Jan 2019”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedNorth Inner City, Dublin City
Units 5, 6, 7 & 8, (bounded by Parnell Street, King's Inn Street and Loftus Lane), Dublin 1, D01 RP74
“commenced 01 Oct 2018, no completion certificate, planned end Nov 2018”
Zoned Z5 · City Centre
Stalled buildEndedSouth West Inner City, Dublin City
“commenced 07 Apr 2021, no completion certificate, planned end May 2021”
Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 03 May 2019, no completion certificate, planned end Sep 2019”
0.59 ha · 16–47 homes · Zoned Z5 · City Centre
Stalled buildEndedSouth East Inner City, Dublin City
“commenced 08 Mar 2019, no completion certificate, planned end Sep 2019”
Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedPembroke, Dublin City
Waterloo House, 8-10 Waterloo Road, Ballsbridge, Dublin, D04 T651
“commenced 29 Jul 2020, no completion certificate, planned end Aug 2020”
Zoned Z2 · Residential Neighbourhoods (Conservation Areas)
Stalled buildEndedPembroke, Dublin City
2 Burlington Road, Dublin, Dublin 4, D04 WV00
“commenced 02 Sep 2020, no completion certificate, planned end Jan 2021”
0.31 ha · Zoned Z6 · Employment/Enterprise
Stalled buildEndedSouth East Inner City, Dublin City
10-12 Hanover Quay, Dublin 2, D02 K510
“commenced 17 Jan 2023, no completion certificate, planned end Feb 2023”
0.25 ha · 7–20 homes · Zoned Z14 · Strategic Development and Regeneration Areas (SDRAs)
Stalled buildEndedSouth East Inner City, Dublin City
Costello House, 1 Clarendon Row, Dublin 2, Dublin, Dublin 2, D02 TA43
“commenced 07 Oct 2020, no completion certificate, planned end Nov 2020”
0.15 ha · 4–11 homes · Zoned Z5 · City Centre
Stalled buildEndedNorth Inner City, Dublin City
31 -34 Abbey Street Upper, Dublin, n/a
“commenced 12 Apr 2019, no completion certificate, planned end Oct 2019”
Zoned Z5 · City Centre